Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Multivariate Scaling Approach for Laboratory Scaled Rock BlastingBy Dr. Kyle Perry, Ryan Sibley
Rock blasting is an inherently difficult field to quantify independent & dependent variables and the specifics of how the energy interacts with the material for a number of reasons. Independent variab
Jan 21, 2025
-
Implementation of a Remote Blasting Engineering Center in PeruBy Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado
In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th
Jan 21, 2025
-
A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper MineBy Stephen Mansfield, Nathan West, El Khalil Seyed
In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted
Jan 21, 2025
-
Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy
Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush
Jan 21, 2025
-
Optimized Blasting Methods for TBM Launching Shaft Construction Beneath the Panama Canal: A Case StudyBy Jose Pineda, Abraham Lindo
The Panama Metro System’s Network expansion involves excavating a launching shaft for a tunnel boring machine (TBM) to traverse beneath the Panama Canal. The blasting needed for this shaft constructio
Jan 21, 2025
-
The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive groundBy Alastair Torrance, Gary Cavanough
Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide
Jan 21, 2025
-
Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno NobelBy Tacio Ferreira
A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla
Jan 21, 2025
-
Hydrogen Peroxide Emulsion (HPE) – A Journey from Concept to RealityBy D. Scott Scovira, Thomas Gustavsson
The potential of hydrogen peroxide explosives was introduced to Thomas Gustavsson and Robert Håkland by Dr Miguel Araos through his development of hydrogen peroxide gel compositions (HPG). In 2020, Th
Jan 21, 2025
-
The Improvement in Fragmentation of the Hardest Jaspilite LithologyBy Carlos Campos Junior, Leonardo Soares Chaves, Raul Carretero Hoz, Renato Jacome Costa, Davi Bastos Martins de Oliveira
The Vale’s Serra Sul mine, also known as S11D project, is one of the world’s largest open pit iron ore mines, located in Brazil’s Amazon region. The mine produces around 90 Mt of high-quality iron ore
Jan 21, 2025
-
Comparison of International Vibration Standards for Quarry Blasting Close-in to a Residential StructureBy Johan Gjødvad, Catherine Aimone-Martin, Charles Dowding, Mathias Jern
A residential structure adjacent to a quarry in Ohio was instrumented to record structure motions, resulting wall strains and existing crack displacements in response to close-in blasting within 82 m
Jan 21, 2025
-
Hemispherical Charge Comparison to Kingery BulmashBy David N/A Doucet, Colter N/A Angell, William N/A Joa, Kyle N/A Wagner, Catherine N/A Johnson, Marty N/A Langenderfer
The Kingery-Bulmash (K-B) equations are a widely accepted means of predicting air-blast parameters from surface explosive detonations. The parameters predicted from these calculations include incident
Jan 1, 2019
-
The Electronic Option, Future Aspects in BlastingBy Winfried Rosenstock, Carlos Orlandi
Along the Pacific West coast of Latin America there are several large operations of metal mining activities. To mention only a few: Chuquicamata in Northern Chile moving daily approximately one millio
Jan 1, 2000
-
Modular Ballistic Pendulum for Measurement of Impulse from Tamped ExplosivesBy Roland Alford
The ballistic pendulum is a well-established piece of test equipment originally developed for estimating the velocity of bullets and projectiles. When trying to understand the effects of different tam
Feb 6, 2023
-
Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock BrokenBy Doss Brittain
The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric
Jan 1, 2008
-
Gurney’s Journey—pipe-bomb Fragments And FumesBy Michael Wieland
The thrust of this report is to overcome some of the technical deficiency in the scientific methodology that correlates the work output during a charge explosion to the resulting toxic fumes. Thermody
Jan 1, 2010
-
Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of MinesBy Robert Hopler
THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3
Jan 1, 2012
-
Seismic Modelling Control Of Blasts In A Nuclear Power PlantBy Alain Blanchier, Pascal Bernasconi
Blasting operations took place on Channel coast NW of France to extend Flamanville Nuclear Power Plant (EPR new generation). The closest operating reactor building was monitored by a 24 remote vibrati
Jan 1, 2008
-
Journal: 100 Years / Petroleum By Sir Beverton Redwood London: Charles Griffin & Company, Limited 1906 CopyrightBy Robert Hopler
Torpedoing Wells. – On the completion of the drilling, or when the production is found to decrease, it is usual to “torpedo” the well to increase the flow. This process was patented in 1862 by Colonel
Jan 1, 2007
-
Sequential Blasting Initiation System With Rf Control (Sbis–rf)By Lazar Kricak, Zoran Teodorovis, Dragan Bogunovic
Scattering of delay interval around nominal value is an important issue in blasting practice. The scatter interval, as becomes wider, increases a probability of time delay overlapping adjacent blastho
Jan 1, 2008
-
Journal: 18th Annual Photo and Art Contest - Honorable Mention: "Pitt River Bridge"By Corry Goumans, Dan Agostino
Photo 1. Demolition work on the Pitt River Bridge. The drill crew is using the 3800 Gardner Denver Air Track to drill the holes on the Bridge turning dolphin. The barge in the background is used for s
Jan 1, 2013