Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-25(2)-73 Respirable Dust Control Manual For Underground Coal Mines - 1.0 IntroductionBy Jerome Apt
This manual has been prepared fur the help and guidance of underground coal mine operators. It details both common and unique engineering methods by which the respirable dust, which is generated in co
Jan 1, 1972
-
OFR-25(2)-74 Improved Sensors And Fire Control Systems For Mining Equipment - Phase II - Final Report - Executive Summary - I. Introduction, Summary, And Results - IntroductionU.S. Bureau of Mines contract H0122053, "Improved Sensors and Fire Control Systems for Mining Equipment", was an investigative effort involving: ? Study of the fire problem on large mobile mining e
Jan 1, 1973
-
OFR-25(2)-83 Monitoring And Modeling Of Shallow Ground Water Systems In The Powder River Basin - AppendicesBy Donald Koch
The project investigated regional impacts of mining on the ground water system of the Powder River Basin by: 1) establishment of a regional ground water monitoring network. and 2)development at a set
Jan 1, 1982
-
OFR-25-75 Analytical Investigations Of Electromagnetic Location Schemes Relevant To Mine Rescue - Part I - Executive Summary (0a560091-e5ee-4fd2-bacd-1488cc050f0d)By David A. Hill
This volume contains a summary of the results of past analyses on U.S. Bureau of Mines Contract No. 80122061 which are relevant to electromagnetic location in mine rescue situations. The analytical re
Jan 1, 1974
-
OFR-25-76 Development And Testing Services Of A Fire Protection System For Coal Augers ? 1. IntroductionLate in 1974 at a meeting with the Cedar Coal Company in Chelyan, West Virginia, a very definite requirement for an automatic heat sensing fire suppression system for the type coal augers used in thei
Jan 1, 1975
-
OFR-25-78 Study And Analysis Of Surface Subsidence Over The Mined Pittsburgh CoalbedBy R. E. Gray
[The purpose of the study is to investigate cases of subsidence over abandoned mined-out areas of the Pittsburgh Coal identified from published and unpublished sources and to determine through a consi
Jan 1, 1977
-
OFR-25-80 Cost And Time Analysis Of The Mining And Environmental Requirements In The Premining Stage For Copper Mining In The Northern Highland, WisconsinBy James P. Ludwig
This report provides the results of a two year study of the projected time and cost requirements for new mine development in Wisconsin and is based on a unique blend of information from mining company
Jan 1, 1979
-
OFR-25-81 The Mining Instructional Development InstituteBy Kay E. Goldberg
The Bureau of Mines conducted a study to develop and evaluate a training workshop for mine safety training personnel. The workshop was based on the Instructional Development Institute (IDI) which has
Jan 1, 1980
-
OFR-25-82 Land Reclamation As SculptureBy David Allen Jones
A depleted county gravel pit was rehabilitated by contracting an artist to convert it into sculpture, rather than using traditional reclamation methods. The sculptor's ideas were generally implem
Jan 1, 1981
-
OFR-25-84 A Summary Of Data From The Sunnyside Single Entry Study -1971 -80By Elaine T. Bowers
The Sunnyside single-entry project pioneered the use of single entries for longwall development in this country. During the 10-year course of the project, an immense amount of information was gathered
Jan 1, 1983
-
OFR-25-85 Development Of An Automated Breathing Metabolic Simulator (ABMS)By Larry L. Wischhoefer
The Automated Breathing Metabolic Simulator (ABMS) is a versatile machine capable of performing almost any physiologically appropriate respiratory simulation. The first ABMS was delivered to the Burea
Jan 1, 1984
-
OFR-25-87 Gases From Explosives Detonated In Underground MinesBy Meliton M. Garcia
The volume of gases produced in major and trace amounts following the detonation of two water gel and two emulsion explosives in a mine were determined. The volume .of the major gases (CO, CO2, NO, an
Jan 1, 1986
-
OFR-26(1)-83 Data Collection And Mathematical Modeling For Predicting Underground Mine Water InflowThis study of underground mine water inflow was initiated by the U. S. Bureau of Mines in March 1980. The objective of this study is to evaluate the hydrologic variables associated with surface water
Jan 1, 1982
-
OFR-26(2)-83 Inflow To Horizontal Drains In Tailings EmbankmentsTailings embankments can develop a high phreatic surface if the original design for the embankment does not include drainage facilities or if existing drainage facilities become ineffective. Subsequen
Jan 1, 1982
-
OFR-26-75 Improved Mine Rescue Breathing Apparatus - 1.0 IntroductionBy W. H. Ryback
When a fire or explosion occurs in an underground coal mine, the atmosphere guickly becomes irrespirable. Highly irritant smoke and toxic levels of carbon monoxide and dioxide are produced, and consum
Jan 1, 1974
-
OFR-26-76 Development Of A Fly Ash-Cement Mine Sealing System ? SummaryBy Kenneth R. Maser
This report describes the development of a system which modifies an existing fly ash-foam remote mine sealing technique to make it capable of impounding water in a fire zone. The modification involves
Jan 1, 1974
-
OFR-26-80 Low Velocity Performance Of AnemometersBy L. P. Purtell
The performance of ten anemometers of several types has been measured at low air speeds. Multiple calibration runs provided sufficient data for measuring random error about the mean calibration curve
Jan 1, 1979
-
OFR-26-82 Feasibility Study Of Partial Flooding In Mined Out Areas For Mine Drainage Pollution AbatementBy John W. Mentz
Phase I study efforts addressed: 1) acid mine drainage formation theory; 2) effects of inundation in reducing acid mine drainage formation; 3) summary information on the types of acid abatement techno
Jan 1, 1981
-
OFR-26-86 Development Of The Claw Hammer Scaling ToolBy James D. Eklund
Towards the goal of improving safety, economy and efficiency of scaling in underground metal/nonmetal mines, Battelle developed a combination prying/hammering scaling tool. A prototype was subject
Jan 1, 1983
-
OFR-26-86(2) Development Of A Mechanized Scaler - Phase I - SummaryThis report describes Phase I of the project --Development of a Mechanized Scaler --performed by Battelle, Pacific Northwest Laboratories for the U.S. Bureau of Mines. The objectives of Phase I were t
Jan 1, 1981