  • NIOSH
    OFR-83(2)-79 Operational Procedures And Maintenance Manual For Pumpable Roof Bolt Machine ? Introduction

    This manual covers the operation and lubrication procedures for the Eimco Pumpable Roof Bolting Machine. This machine meets U. S. Bureau of Mines Schedule 2G Approval. This manual is divided into t

    Jan 1, 1976

  • NIOSH
    OFR-123-76 Evaluation Of Underground Conventional Mining Equipment

    By William J. Douglas

    This document describes the development of a conventional mining equipment data base, and an approach for conducting industrial engineering studies of arbitrary mining systems employing network techni

    Jan 1, 1976

  • NIOSH
    OFR-91-76 Design, Fabrication, And Testing Of A System To Demonstrate The Effectiveness Of Respirable Dust Control On Longwall Shearers By The Use Of Water Piped Through The Shearer Drum ? I. Introduction

    This report is in fulfillment of Contract H0230031 awarded to Bituminous Coal Research, Inc., on May 23, 1973. The scope of work to be performed under this contract was divided into four phases: Phase

    Jan 1, 1976

  • NIOSH
    Introduction - The Mission (c66faee9-c577-4c7d-8a77-1b62b2f800d7)

    When the Organic Act of 1910 established the Bureau of Mines within the Department of the Interior, the Bureau's programs involved only health and safety research and education, and fuels testing

    Jan 1, 1976

  • NIOSH
    OFR-6(1)-77 The Impact Of Overmining And Undermining On The Eastern Underground Coal Reserve Base

    By Ronald W. Stingelin

    This study undertook the development and implementation of a methodology for estimating the impact of coal seam interaction on the eastern bituminous underground reserve base as published in USBM Info

    Jan 1, 1976

  • NIOSH
    OFR-16(1)-80 Three-Dimensional Finite Element Analysis Of Crosscut And Entry Intersection Of A Double - Entry Coal Mine

    By M. B. Balachandra

    A three-dimensional finite element analysis was performed of an instrumented section of a double-entry coal mine in order to provide a comparison between field measurements and existing analytic techn

    Jan 1, 1976

  • NIOSH
    OFR-76-77 Investigation Of The Various Factors Affecting The Response Of Passive Configuration Track Etch Dosimeters To Working Level Hour Exposure In Radon And Radon Daughter Atmospheres

    By D. B. Lovett

    The work described in this report was directed toward identifying and devising methods to minimize the previously observed variability between working level hour exposures and the alpha particle track

    Jan 1, 1976

  • NIOSH
    OFR-80(2)-77 Executive Summary - Research And Development Priorities Surface Mining Reclamation - Volume II

    By James J. Scott

    Workshops were held in eight states during the period from December 12. 1975. through June 25, 1976, under U. S. Bureau of Mines Contract to the University of Missouri-Rolla. The workshops were design

    Jan 1, 1976

  • NIOSH
    OFR-119(2)-76 Future Research In Borehole Assaying Technology - Volume II - Bibliography Of Borehole Assay Technology 1969-1975 ? Introduction And Summary

    The Bibliographic Data Base contained in the present volume is the result of a literature search conducted as one task of the Bureau of Mines project concerned with research in borehole assay technolo

    Jan 1, 1976

  • NIOSH
    OFR-100(3)-76 Development Of Pre-Mining And Reclamation Plan Rationale For Surface Coal Mines - Volume III Of III - Legal Controls Of Surface Mining

    VOLUME III The objective of Volume III of this report is to provide a concise review of six major types of legal constraints, controls, and regulations on surface coal mining in the United States,

    Jan 1, 1976

  • NIOSH
    OFR-17(4)-77 Conceptual Design Of An Automated Longwall Mining System - Volume II ? Appendices - Appendix A - Selection Of The Concept Coal Seams

    Two coal seams were selected and the conceptual designs were based on the geological and physical conditions typical of these seams. As a result of the screening process presented below, the two coal

    Jan 1, 1976

  • NIOSH
    OFR-123(1)-81 Finite Element Analysis Applied To Resin And Mechanical Roof Bolting Systems For Strata Bound Deposits - Volume I

    By J. C. Gerdeen

    This project was a supporting effort with research contract H0230016 at White Pine Copper Company. Creep properties of White Pine rock were determined. These and properties for bolted joints were used

    Jan 1, 1976

  • NIOSH
    OFR-107-79 In-Situ Coal Pillar Strength Study

    By Fun-Den Wang

    This report presents the results of two large scale field coal pillar strength tests (80 ft by 80 ft), the results of a series of laboratory small core sample tests, and the correlation between those

    Jan 1, 1976

  • NIOSH
    OFR-39(2)-77 Accident Cost Indicator Model To Estimate Costs To Industry And Society From Work-Related Injuries And Deaths In Underground Coal Mining Volume II Program User Manual

    By Daniel G. DiCanio

    This report describes a computer-based model for estimating the tangible costs of injuries and deaths from work-related accidents in underground coal mines. The study undertook to identify and quantif

    Jan 1, 1976

  • NIOSH
    OFR-100(3)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Phase II Report

    By Peter Murphy

    This report (arid related appendices) provides a description of the functional design specifications, engineering design specifications, and program of instruction for development of a training system

    Jan 1, 1976

  • NIOSH
    OFR-118-76 Heap Leaching Studies On Uranium Ore

    By Robert C. Merritt

    Laboratory amenability studies as well as a pilot heap-leaching investigation of low-grade sandstone uranium ores from Wyoming, New Mexico, and Colorado are described. Sulfuric acid heap leaching with

    Jan 1, 1976

  • NIOSH
    OFR-42-77 Fabricate And Evaluate Protective Canopies For 3-Foot Coal Seams

    By Wesley Hermanson

    Canopies were designed, fabricated, installed, and demonstrated for mining machinery in 3-foot coal seams. A Wilcox PJ20 Auger miner, a Wilcox Bolter, a bee Norse 245 miner, and an Elkhorn Scoop AR3 m

    Jan 1, 1976

  • NIOSH
    OFR-5-78 Humidity Effects On Coal Mine Roof Stability

    By N. B. Aughenbaugh

    This report summarizes the results of an investigation into the causes of coal mine roof instability caused by the environmental characteristics of the air ventilated through a mine. The field studies

    Jan 1, 1976

  • NIOSH
    OFR-3(2)-80 The Development of A Cross-Pit Overburden Handling System - Volume II - Appendix

    By J. Ritchey

    This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport sp

    Jan 1, 1976

  • NIOSH
    IC 8719 Projects To Expand Fuel Sources In Western States - Survey Of Planned Or Proposed Coal, Oil Shale, Tar Sand, Uranium, Geothermal Supply Expansion Projects, And Related Infrastructure, In States West Of The Mississippi River (As Of May 1976)

    By John S. Corsentino

    This Bureau of Mines study is a listing of fuels -related projects that are presently under construction, planned, or proposed by various companies and organizations in the Western United States. The

    Jan 1, 1976