Targeting Precious Metals Deposits Using A Predictor-Correlator Technique
By E. P. Gustafson
Demand by precious metals explorationists for cost effective means to target subsurface geologic structures worthy of evaluation by means of drilling has led to the use of the predictor-correlator tec
Jan 1, 1989
-
TARP - Comparative Study of the Mining and Concrete Lining Operations for Tunnels with Diameters over 9 m (30 ft)
By Joseph Fernandez, Luminita Calin
INTRODUCTION The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, is the daring and unique concept developed by the Metropolitan Water Reclamation District of Greater C
Jan 1, 1997
-
Tarp North Branch Tunnel Leg – A Case History
By Joseph P. Sobanski, Michael P. Bruen
The North Branch tunnel segment of the Tunnel and Reservoir Plan Mainstream System consists of 14,075 m (45,885 ft) of 9.2 m (30.2 ft) finished diameter and985 m (3,232 ft) of 2.5 m (8.25 ft) finished
Jan 1, 1999
-
TARP Tunnel Boring Machine Performance Chicago
By William A. Macaitis, Frank E. Dalton, Leo R. DiVita
The Metropolitan Water Reclamation District of Greater Chicago's Tunnel and Reservoir Plan (TARP) is a multi-purpose urban public works project with a total cost of $3.7 billion. Currently 51 mil
Jan 1, 1993
-
TARP — The Des Plaines Tunnel System (North Leg) A Case History
By Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
TARP—Torrence Avenue Tunnel
By Bob Rautenberg, Luminita Calin
The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, was developed by the Metropolitan Water Reclamation District of Greater Chicago as a two-phase solution to the problem
Jan 1, 2001
-
Tata Chemicals North America finds stability, success in Southwest Wyoming
By William Gleason
"In a time that seems to be dominated with nothing but bad news coming from the mining industry, there is a success story that has been quietly happening in Southwestern Wyoming for more than 60 years
Jul 1, 2016
-
Tax incentives are key to survival of Canadian mineral exploration
By Kenneth A. Grace
Introduction The 1980s have not been kind to the mining industry, especially in the United States. As mineral commodities prices plunged, marginal producers were squeezed out and then major players w
Jan 1, 1989
-
TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021
By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan
Jun 13, 2021
-
TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case
By Enrique Fernández
INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l
-
TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara
As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol
Jun 23, 2024
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022
By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021
By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
TBM Data Management And Quality Assurance For The Brightwater Conveyance Project
By Jeffrey Mitsopoulos
King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which
-
TBM Excavability: Prediction and Machine–Rock Interaction
By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
TBM Excavation Of Rogers Pass Railroad Tunnel
By Gail B. Knight
INTRODUCTION In May 1984, The Canadian Pacific Railway awarded to the Joint Venture of Foundation of Canada, Ltd. of Toronto, Atlas Construction Co. of Montreal, and S. A. Healy Co. of Chicago the
Jan 1, 1987
-
TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara
This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv
Jun 23, 2024
-
TBM Operation Challenges at DTL3 C931 Project in Singapore
By Bo Kyung Sim, Dae Young Kim, Jae Won Lee, Ebrahim Farrokh
"The contract C931 of the downtown line 3 (DTL3) mass rapid transit system of Singapore includes half a kilometer twin tunnels running between Mattar and Macpherson stations. An EPB TBM of 6.6 m diame
Jan 1, 2016
-
TBM Performance At Four Hard Rock Tunnels In California
By Tim Avery, Steve Klein, Mark Schmoll
Tunnel boring machine (TBM) performance in hard rock is highly dependent on the geologic conditions, including the type of rock and hysical properties like the rock strength, hardness, and the spacin
Jan 1, 1995
-
TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021
By Devan Naik, Matthew Stokes, Andy Nigro
This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co
Jun 13, 2021