Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Tunnel Boring With Hydraulic Debris Disposal

    By W. Setzepfandt, J. Henneke

    PREFACE Debris disposal can very often be a severe problem and major restriction on tunnel boring projects, especially for small diameter tunnels and in underground mines. Hydraulic transport could

    Jan 1, 1981

  • SME
    Tunnel Condition Assessment: State of the Practice - RETC2023

    By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani

    In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con

    Jun 13, 2023

  • SME
    Tunnel Construction For The Muck Valley Hydro Project

    By Jorge Martinez

    The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engi

    Jan 1, 1989

  • SME
    Tunnel Construction For The Sao Paulo Subway

    By Luiz Roberto Amaral, Peter Frobenius

    Construction of the first phase of the Sao Paulo Metro, the North-South Line, will be completed late in 1974. The downtown section of this line consists of 2.2 miles of 19.6-foot diameter soft ground

    Jan 1, 1974

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001

  • SME
    Tunnel Construction In Very Weak Sandstone - A Case Study Of Site Investigation For Tunnel Construction In The Twin Cities Area, Minnesota

    By Brent K. Nelson, D. Lee Petersen, Charles R. Nelson

    INTRODUCTION Tunnels are commonly constructed in the very weak St. Peter sandstone in the Twin Cities area of Minnesota. Historically, core recovery in this weak sandstone was very small in the cri

    Jan 1, 1987

  • SME
    Tunnel Construction: Difficult Ground Conditions

    By James J. Brady, James S. Lewis, Robert B. Gordon, Jimmy W. Honeycutt

    INTRODUCTION Tunnel construction has always been an extremely high risk form of contracting primarily due to the inaccessability of information concerning the ground conditions to be encountered du

    Jan 1, 1983

  • SME
    Tunnel Cost Model

    By Charles H. Minott, Michael J. Markow, Robert D. Wyatt, Fred Moavenzadeh

    The substantial investment in tunnels anticipated in the next twenty years has focused new attention on the economics of tunnel construction itself and on some costly problems associated with undergro

    Jan 1, 1974

  • SME
    Tunnel Deformation Mode and Loading Magnitude during Large Earthquake

    By Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata

    "Rock tunnels suffered severe damage from recent large earthquakes in Japan, despite the empirical knowledge that tunnels tolerate earthquakes better than surface structures. Seismic design for rock t

    Jan 1, 2016

  • SME
    Tunnel Deformations Caused by Compensation Grouting at Crossrail Farringdon Station

    By Thomas Schwind, Benedikt Grau, Angelos Gakis

    "In Crossrail’s Farringdon station, compensation grouting was successfully utilized to mitigate the surface settlements induced by the tunneling works. The main focus of this study was the platform tu

    Jan 1, 2016

  • SME
    Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021

    By Michael Schultz, Gregory Sanders

    The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ

    Jun 13, 2021

  • SME
    Tunnel Design for When H2O meets FeS2 Underground - NAT2024

    By Jim Finley, Adam Bedell, Eric Schrader

    The CSO 52 Storage Tunnel and Pump Station project consists of 4,700 ft of hard rock tunnel, 2 intakes, and a 4 MGD wet pit pump station. During the geotechnical investigation, it was determined that

    Jun 23, 2024

  • SME
    Tunnel Design of Muni Metro Turnback Project

    By Ching Wu, David A. Sutter, Peter Frobenius

    The MUNI Metro Turnback (MMT) Project includes a 256 m (840 ft) twin tunnel section, which connects to the Embarcadero Station, and runs under Market Street in San Francisco. The tunnels go through a

    Jan 1, 1995

  • SME
    Tunnel Design Using Strain Energy Concepts and Serviceability Limit State

    By I. W. Farmer, R. E. Finky

    Design of structures in rock based on ultimate limit states or strength criteria is unrealistic. The fracture process which inevitably occurs in rock around an underground structure is an energy relea

    Jan 1, 1986

  • SME
    Tunnel Destruction:State Of The Art

    By Charles E. Joachim

    Current Army tunnel destruction criteria (1) are based on limited nuclear-explosive (NE) and high-explosive (HE) test data. The PILE DRIVER (2) and HARDHAT (3) events investigated tunnel and support s

    Jan 1, 1979

  • SME
    Tunnel education in the United States

    By Gary Brieley

    Until well into the 20th century, most construction work was performed under the auspices of a master builder or in a manner that would be described today as design-build. In addition, many civil eng

    Jun 1, 2010

  • SME
    Tunnel Euralpin Lyon Turin CO8-Design of Temporary Support Profile of Base Tunnels and Cross-Passages - NAT2024

    By Elisa Comis, Barbara Bitetti, Julien Pepiot, Stefano Lione, Francesc Rich

    The new Lyon-Turin railway project involves the construction of a 57 km twin-tube tunnel between France and Italy. Pini France (project leader) and Systra-SWS are the designers of Construction Site 8

    Jun 23, 2024

  • SME
    Tunnel Excavation At The Bad Creek Project

    By Thomas H. Holley

    This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diam

    Jan 1, 1987

  • SME
    Tunnel Excavation Grand Coulee Third Power Plan

    By D. J. Duck

    INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos

    Jan 1, 1997

  • SME
    Tunnel Excavation In Alaska Using High Speed Equipment

    By Mike S. Ness, Allan G. Provost

    High speed drilling, mucking, and hauling equipment was used in driving approximately 2.16 km(7100 ft) of lower power tunnel in quartz diorite for the Tyee Lake Hydroelectric Project near Wrangell, Al

    Jan 1, 1983