Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Bituminous Coal Consumption Estimating Its Long Term Growth And Annual Variation ? Introduction

    By W. Gibson Jaworek

    It has become apparent in recent years to everyone intimately concerned with the future of the American fuels industries that the growth in demand for energy has become a topic receiving considerable

    Jan 1, 1960

  • SME
    Bituminous Coal Electrokinetics ? Introduction

    By John A. L. Campbell

    Surface dependent processes, such as froth flotation and flocculation, are important or potentially important techniques for combating some of the current major problems in coal preparation. In order

    Jan 1, 1969

  • SME
    Bituminous Sands: Economic Stripping Ratio And Mining Systems

    By Brahm D. Prasad

    As in other mineral deposits, variation in bitumen saturation, thickness of ore and discard occurs throughout Alberta's Athabasca Oil Sands deposit. The economic stripping ratio developed here to

    Jan 1, 1982

  • SME
    Bivariable Planetary Cutter-Head Concept for Shaft Boring

    By D. Gu

    Breakage of rock by machine is one of the major methods of excavation. With the development of modern engineering techniques, the advantages of using this method have become even greater. Improving ef

    Jan 1, 1995

  • SME
    Black Mountain overview: The resolution of the lands unsuitable petition from legal and technical perspectives

    By M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner

    In 1998, a group called Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903± hm2 (22,000± acre

    Jan 1, 2002

  • SME
    Black Mountain – An Overview - The Resolution Of The Lands Unsuitable Petition From The Legal And Technical Perspectives

    By M. M. Rajkovich, L. Adams, J. J. Zaluski, S. Gardner

    In 1998, Kentuckians for the Commonwealth filed an Administrative Petition with the Kentucky Natural Resources and Environmental Protection Cabinet to designate 8,903 +/- hectares (22,000 +/- acres) o

    Jan 1, 2000

  • SME
    Black River Tunnel project phase 1: Innovative quality control approach for installation and testing of rock bolts in shafts

    By J. Edberg

    "This article details the use of an alternative testing method to the 2004 "Post-Tensioning Institute (PTI) Recommendations for Prestressed Rock and Soil Anchors" manual’s recommendations for temporar

    Jan 1, 2014

  • SME
    Black Thunder Mine Planning And The Environment ? Introduction

    By Hugh W. Evans

    Many reports and papers have been delivered on projects under construction or already in operation, but we believe there are few that have been written about projects yet to be built specifically deal

    Jan 1, 1975

  • SME
    Blasor – A Generalized Strategic Mine Planning Optimization Tool

    By B. Law, M. Menabde, B. Baird

    Blasor is a new mine planning tool which is being used in the long and medium-term optimization of multi-open-pit operations throughout BHP Billiton’s Base Metals and bulk commodities portfolio. It i

    Jan 1, 2007

  • SME
    Blast casting at an Eastern strip mine

    By R. R. Rollins

    Field data combined with theoretical derivations were used to design a surface mining operation using explosive casting. Calculated casting results varied from 44% to 65% depending on bench height. Th

    Jan 1, 1988

  • SME
    Blast Casting At An Eastern Strip Mine (b31012bf-2fc9-4254-a7e6-574a95628df1)

    By R. R. Rollins

    Field data combined with theoretical derivations were used to design a surface mining operation using explosive casting. Calculated casting results varied from 44 to 65% depending on bench height. T

    Jan 1, 1987

  • SME
    Blast Fragmentation Model Evaluation Via Image Analysis

    By Martin L. Smith, John M. Kemeny

    In blasting, an optimal muckpile size distribution can be found in terms of mining and milling productivity and cost. Fragmentation control requires a means of modeling and evaluating blast results. A

    Jan 1, 1993

  • SME
    Blast Furnace Comparison Of Agglomerated Vs Sized Ore ? Introduction

    By Kan Aketa

    The Japanese iron and steel industry has been developed remarkably, supported by the increase of steel demand. In particular, progress in various technical aspects of the ironmaking process, including

    Jan 1, 1982

  • SME
    Blast Furnace Test Of Pelletech Cold Bond Pellets

    By M. Adnan Goksel

    A blast furnace test of approximately 5,000 tons of PelleTech Corporation (PTC) cold bond pellets was successfully run at Kaiser Steel Corporation (Kaiser) Steel Manufacturing Division at Fontana, Cal

    Jan 1, 1979

  • SME
    Blast Furnace Testing Of The Reclaform Process (68bfc139-0269-44e6-b4a1-0ce63f13831f)

    By J. S. Young

    During 1975, the Reclasource Corporation constructed and commissioned a plant for the recovery of mill scale, coke breeze, blast furnace dust, blast furnace sludge and basic oxygen furnace dust at the

    Jan 1, 1977

  • SME
    Blast Hole Drill Recorder Utilization

    By T. E. Scartaccini

    A drill recorder is a permanent data collecting instrument. In open pit blast hole drilling the application of a drill recorder is that of data collection, drilling control, and drilling education.

    Jan 1, 1970

  • SME
    Blast Parameters for the Nagagami Hydro-Electric Project Tailrace Plug Blast, Utilizing Long Round Jumbo Technology

    By Joseph Keenan

    In March of 1994, Dynatec Mining Limited entered into a contract with PCL Civil Constructors to carry out the underground excavations for the Algonquin Power Corporation’s15 Megawatt Nagagami hydro-el

    Jan 1, 1997

  • SME
    Blast-Induced Dust

    By Jozef Szymanski, Julian Partyka, Jerzy Krynicki

    In order to study blast-induced dust in a hard rock metal mine experimentally and analytically, a part of a stope mined by Vertical Retreat Mining (VRM) was monitored throughout its lifetime. Dust mea

    Jan 1, 1997

  • SME
    Blast-induced rock damage and optimized blast design in a hard-rock mine - SME Transactions 2014

    By K. M. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Jan 1, 2014

  • SME
    Blast-Induced Rock Damage and the Optimized Blast Design in a Mine: A Case Study

    By K. Kim

    An analysis was conducted to determine the effects of blasting on slope stability and downstream comminution processes. To investigate these effects, the extent of blast-induced rock damage and the ma

    Feb 23, 2014