Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021

    By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White

    The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame

    Jun 13, 2021

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • SME
    Design and Construction Logistics for the Underground Laboratory at Cern, Switzerland

    By Keith Jones, Martin Knights, Timothy Watson

    In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial a

    Jan 1, 2003

  • SME
    Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur Mine

    By C. W. Nelson, A. G. Moody

    This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110

    Jan 1, 1994

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By J. F. Able, F. Djahanguiri

    The US Bureau of Mines conducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would m

    Jan 1, 1998

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By F. Djahanguiri

    The U.S. Bureau of Mines is conducting research on underground stope leaching of metalliferous ores to minimize the environmental impact of ore processing on the surface and to maximize minable reserv

    Jan 1, 1995

  • SME
    Design And Construction Of A Bulkhead For A Simulated Underground Leaching Stope

    By F. Djahanguiri

    The US Bureau of Mines con¬ducted research on underground stope leaching of metalliferous ores. Leaching underground would minimize the environmental impact of ore processing on the surface and would

    Jan 1, 1997

  • SME
    Design and Construction of a Deep Underground Station in Urban Area - RETC2021

    By Verya Nasri

    This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i

    Jun 13, 2021

  • SME
    Design and Construction of a Deep, Dual-Cell, Slurry Wall Shaft in Soft Ground

    By Edwin Itzig-Heine, Daniel Traylor, Bernard Tarralle, Michael McKenna

    This paper discusses the challenges associated with the design and construction of a dual-cell, “figure eight” shaped shaft in saturated, soft ground for the Northeast Interceptor Sewer project in Los

    Jan 1, 2003

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Design And Construction Of A New Mine - The Design Of Mimosa #2 Mine ? Introduction

    By Ulises Deveze T.

    The coal company Minerales Monclova, S.A. (MIMOSA), the owner of the Mimosa R Line, is a subsidiary company of Altos Hornos de Mexico, S.A., the largest steel plant in Mexico with an annual capacity o

    Jan 1, 1974

  • SME
    Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022

    By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert

    The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover

    Dec 1, 2022

  • SME
    Design and construction of a surface air cooling and refrigeration installation at a South African mine

    Impala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum

    Jan 1, 2009

  • SME
    Design and Construction of a Vehicular Underpass Under a Live Highway

    By Nai-piu Tong, Huaren Dou, Sui-shun Poon, Leslie H. Swann

    This paper mainly presents geotechnical aspects of a vehicular underpass that was built across under one of the busiest highway in Hong Kong. The underpass, in a section comprising an upper arch and i

    Jan 1, 2003

  • SME
    Design And Construction Of Access Shaft And Cross Adit Los Angeles Metro Rail Tunnel Contract A146

    By Wolfgang H. Roth, Stephen J. Navin, Samuel K. Louis, Anthony F. Stirbys

    This paper presents a case history of the design and construction of the access shaft and cross adit utilized to gain access to the Los Angeles Metro Rail tunnel alignment, at the A146 Contract site.

    Jan 1, 1989

  • SME
    Design And Construction Of Bins

    By F. Forbes

    For many years, the Machinery Division of Dravo Corporation has been designing and constructing bins and hunkers as part of overall plant facilities. We have designed bins to handle a variety of mater

    Jan 1, 1968

  • SME
    Design And Construction Of Bulkheads For Underground Backfill Systems

    By A. Afrouz, F. P. Hassani

    The types of bulkhead that contain backfill in stopes under various pressures and mining conditions are outlined. Conventionally adopted theoretical and empirical techniques were integrated in the des

    Jan 1, 1993

  • SME
    Design and Construction of Clay Liners for Gold Tailings Facilities and Heap Leach Pads

    By Bruce S. Brown, Jeremy P. Haile

    The construction of tailings facilities and heap leach pads for gold mining operations generally requires the installation of one or more impermeable liners beneath the structures to satisfy environme

    Jan 1, 1988

  • SME
    Design and Construction of Dulles Airport Tunnels

    By Allan Sylvester, Paul E. Gabryszak, Diane R. Hirsch, David P. Field

    With construction of the first phase of the Automated People Mover (APM) Tunnels nearing completion, this paper will address how knowledge from recent Tunnel Boring Machine (TBM) and New Austrian Tunn

    Jan 1, 2007