Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dynamic Simulation of Precious Metal Recovery from a Valley-Fill Heap Leach FacilityBy J. Bilant, J. Donnelly
"A spatially-discretized heap leach simulation model was developed within the GoldSimTM modeling framework for the Coeur Rochester Mine, Nevada. The model is being evaluated by Rochester as a means of
Jan 1, 2017
-
Dynamic Simulation Of Processing High-Arsenic Copper Concentrates In A Fluidized Bed RoasterBy A. Rajoria
A dynamic process model for predicting the fluidized bed roasting of copper concentrates with high arsenic content is presented in this work. Mass and energy balances were performed based on roasting
Feb 23, 2014
-
Dynamic Subsidence BasinBy W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng
3.1 INTRODUCTION The final subsidence basin discussed so far is that developed long after mining has stopped. In a supercritical final subsidence basin, the central portion subsides uniformly. Thus
Jan 1, 1992
-
Dynamic temperature measurement of overheated shuttle car trailing cables in underground coal minesBy L. W. Scott, T. H. Dubaniewicz, F. T. Duda, P. G. Kovalchik
Recent research conducted by NIOSH's Pittsburgh Re¬search Laboratory showed that electrical current levels permitted under present regulations may not limit cable temperatures to less than 90°C i
Jan 1, 2000
-
Dynamic Temperature Measurement Of Overheated Shuttle Car Trailing Cables In Underground Coal Mines (PREPRINT 98-21)By P. G. Kovalchik
Recent research conducted by NIOSH, Pittsburgh Research Laboratory showed that electrical current levels permitted under present regulations may not limit cable temperatures to less than 90°C in reele
Jan 1, 1998
-
Dynamic Unfolding-Complex Geology Case Study of Tenke-Fungurume DepositsBy Justin Cardwell, Alyson Cartwright
"Grade estimation is the cornerstone of longrange mine planning. Pit designs, metal recovery, mining costs, reserves calculations and reporting are all dependent upon a reliable grade model. If the ge
Jan 1, 2015
-
Dynamic Unfolding-Complex Geology Case Study of Tenke-Fungurume Mining District DepositsBy A. Cartwright, J. Cardwell
"Complex geology requires innovative approaches to confidently and appropriately model grade and geologic trends. Local Anisotropy Kriging (LAK), by Isaaks and Company, and MineSight® Dynamic Unfoldin
Jan 1, 2016
-
Dynamics Of Long Belt Conveyors With Distributed DrivesBy G. Lodewijks
Today most belt conveyors used for the transportation of bulk solid materials are driven in a centralized way with all drives in one location. The dynamics of these systems has been studied since the
Jan 1, 2008
-
Dynatec International Limited Long Round DevelopmentBy W. M. Shaver, W. R. Dengler
INTRODUCTION In Canada, most of the rock being broken in underground metal mines is being carried out using traditional drilling and blasting methods. Despite advances being made in hard rock borin
Jan 1, 1993
-
Dynatec’s Long Round Technology Improves Shaft DevelopmentBy W. R. Dengler
In Canada, most of the rock being broken in underground metal mines is being done by using traditional drilling and blasting methods. Despite advances being made in hardrock boring and other, more exo
Jan 1, 1993
-
Dysfunction Junction: When Inalterable Rules Meet Evolving TechnologyBy Mark N. Savit
It is indeed a rarity for a non-engineer, let alone a lawyer, to even be considered for a mining-related award, especially where that award is for significant contributions to technical progress in th
Jan 1, 2008
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
Early Contractor Involvement and Observational Method Supported with Artificial Intelligence for Equitable Risk Management - NAT2024By David J. Hatem, K. Bhattarai
Effective risk management in major subsurface projects involves ways to mitigate adverse impacts to final design and construction approaches due to changed subsurface conditions. An Early Contractor I
Jun 23, 2024
-
Early Cretaceous Deposits Of Kaolin Clay And Silica Sand In Nova Scotia, CanadaBy P. W. Finck
Detailed mapping, using a large diameter diamond-drill in conjunction with high resolution reflection seismics, has increased known resources of kaolin clay and glass-grade silica sand from scattered
Jan 1, 1996
-
Early Detection of Mine Fire in Underground by Using Smell DetectorsBy Kotaro Ohga, Kiyoshi Higuchi
In our laboratory, a new detection system using smell detectors was developed to detect the spontaneous combustion of coal and the combustion of other materials used underground. Laboratory experiment
Jan 1, 1995
-
Early Experiences of Microseismic Monitoring in Kittilä Mine - RASIM22By Stephen Meyer, Véronique Falmagne, Antti Pyy
Kittilä Mine is a gold mine located in Northern Finland, owned and operated by Agnico Eagle Finland. The mining operation started in 2008 with open pits which were completed in 2012 and production mov
Apr 26, 2022
-
Early Mining Safety HeroesBy L. Michael Kass
Editor’s note. The following letter was sent to The Washington Post following the coal mining accidents in January that claimed the lives of 16 coal miners. The Sago Mine disaster in West Virgini
Jan 1, 2006
-
Early Results from the Thermal/Structural In Situ Test Series at the WIPPBy D. E. Munson, T. M. Torres, D. A. Blankenship
The Thermal/Structural Interactions (TSI) In Situ Tests are a series of large scale, well instrumented tests that have been constructed at the Waste Isolation Pilot Plant (WIPP) in southeastern New Me
Jan 1, 1986
-
Early Settlement Of Gold And Silver Deliveries From Misima Mines Pty Ltd. Through Mine Site Sampling And Superintending By Metals Refining Operations In Papua New Guinea.By Geoff Whebell, Dianne Coulthard
Sampling studies of high silver (+70%), gold dore led to the development of mine site sampling techniques and superintending for the collection of samples for assay and bullion weights for settlement
Jan 1, 1998
-
Early Strength Performance Of Modern Weak Rock Mass Shotcrete MixesBy C. C. Clark
The national Institute for Occupational Safety and Health (NIOSH), Office of Mine Safety and Health, Ground Control Engineering Branch is investigating the use of shotcrete in weak rock mass mines wit
Jan 1, 2011