Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estudio De VlabilidadBy Edward S. Frohling
Va a ser discutida la información que se requiere para un estudio preliminar de viabilidad y la información adicional que se requiere para el estudio final de viabilidad de un nuevo depósito de minera
Jan 1, 1982
-
Ettringite Precipitation for Sulfate and TDS Reduction: A 10 GPM Pilot Plant StudyBy R. Bryce, T. J. Doughty, K. Stoll
Sulfate-impacted mine waters are under regulatory scrutiny to reduce total dissolved solids (TDS). There are several options to reduce TDS. One option is transforming the soluble sulfate into insolubl
Jan 1, 2019
-
Eureka Mine - Development And Implementation Of A Novel Gravity/heap Leach ProcessBy P Simpson, P Bundo
The Eureka Mine is situated in the Guruve district of Zimbabwe, some 150 km north of Harare. The mine was first worked in 1895 and until recently was operated as a typical Zimbabwean "smallworking" wi
Jan 1, 2000
-
European Bauxite DepositsBy George Bárdossy
Most of the bauxite deposits in Europe belong to the karst type. They are located mainly ill Southern Europe along the Mediterranean Sea and in the Ural Mountains. Lateritic bauxite deposits occur on
Jan 1, 1984
-
European Environment Agency - Ex-Post Evaluation Of Aggregate TaxesBy D. Legg
This is the first in a series of studies commissioned by the European Environment Agency that aim to raise awareness of the use of economic instruments and assess their effectiveness. The emphasis is
Jan 1, 2007
-
European Stabilization Practice Using Chemical Systems In Urban TunnelingBy G. Wayne Clough
During shallow tunneling in an urban environment, deposits or pockets of saturated soil or fractured, weathered rock are often encountered. Under such conditions, special problems with tunnel support,
Jan 1, 1976
-
European Tunneling Technology And MethodsBy Brian Fulcher
While tunneling in Europe has been a tradition for centuries, many companies and countries have embraced tunnel innovation with considerable vigor and creativity. Indeed, local needs and site conditi
Jan 1, 2007
-
European Views On Mechanical Boring Versus Drill And Blast TunnelingBy Gunnar Nord, Per-Anders Persson, Duri Prader
The paper gives a short resumé of the findings of the joint US - Swedish "Mechanical Boring (MB) or Drill and Blast Tunneling (DB) ? Workshop" in Stockholm December 1976. New developments and trends i
Jan 1, 1979
-
European Vs. United States Construction Contracting PracticesBy Sol Ribakoff
In 1973, the Subcommittee on Contracting Practices, U. S. National Committee on Tunneling Technology, National Academy of Sciences, under the able chairmanship of A. A. Mathews, Engineering Consultant
Jan 1, 1981
-
Europoort Iron Ore TerminalWhen the Middle Ages were drawing to an end and Rotterdam, then still a small fishing port, began to extend its trade relations to continental ports handling general cargo, a development was initiated
Jan 1, 1972
-
Eurotunnel - UK Side PlantBy C. J. Kirkland
The paper describes the arrangements for the casting, curing and handling at the casting yard, of the concrete segments for the lining of the UK half of the tunnel, and the plant used for the handling
Jan 1, 1989
-
Evaluating bump prone ground with LaModel through site-specific calibration - SME Transactions 2014By K. W. Harris, K. A. Perry
Reserve depletion in Central Appalachia is continuously creating unique ground conditions for underground coal mines with many of these difficult environments directly attributable to multiple seam mi
Jan 1, 2014
-
Evaluating comminution efficiency from the point of view of downstream froth flotationBy R. R. Klimpel
The efficiencies of plant-scale comminution processes are often evaluated by various indices calculated and/or measured somewhat independently of the performance of any associated downstream froth flo
Jan 1, 1999
-
Evaluating Comminution Efficiency From The Point Of View Of Downstream Froth Flotation (abc6c6b2-1b18-4618-ba64-82bb67b26f69)By R. R. Klimpel
The efficiencies of plant scale comminution processes are often evaluated by various indices that are calculated and/or measured somewhat independent of the performance of any associated downstream fr
Jan 1, 1998
-
Evaluating Fundamentals of the US Gold IndustryBy G. Kemp Williams, Peter H. Dohms, Barry A. Hillman, Laurie A. Williams
Introduction In 1969, the US devalued the dollar. This action, over the ensuing four years, resulted in the deregulation of the price of gold. It also resulted in the rebirth of the US gold mining in
Jan 12, 1984
-
Evaluating Gas Exchange From Sealed Areas in Underground Coal MinesBy Robert J. Timko, R. Lincoln Derick
This report presents a Bureau of Mines evaluation which examined the extent of gas leakage from sealed areas in underground coal mines and measured the effectiveness of commonly used structures for co
Jan 1, 1991
-
Evaluating Ground Conditions Ahead of a TBM Using Probe Drill DataBy Steven K. Duke, Jay Arabshahi
An economic, real-time probe drill monitoring system was developed for Metropolitan Water District’s Arrowhead Tunnels project to quantitatively evaluate ground conditions ahead of a TBM. This system
Jan 1, 2007
-
Evaluating Host Rock Representativeness Through GeostatisticsBy Y. C. Kim, M Nataraja, J. T. Buckley, D. H. Tiktinsk
The Nuclear Waste Policy Act of 1982 (NWPA) assigns the U.S. Department of Energy (DOE) the responsibi1it.y of locating, constructing. operating, closing and decommissioning a nuclear waste repository
Jan 1, 1986
-
Evaluating Methane Emissions on an Extended Longwall FaceBy Joseph M. Denk, Gary J. Wirth
This paper summarizes a three phase face ventilation study which was conducted from September 1989 through March 1990 to determine face area methane liberation patterns on two extended longwall sectio
Jan 1, 1991
-
Evaluating Options For Gold Heap Process Optimization Using A Comprehensive Process ModelBy S. Garcia, J. Gebhardt, D. McBride, A. Hernandez, A. Esplín, M. Cross
The Minera Yanacocha operation consists of several heaps interconnected with ponds and gold recovery plants and presents various operating challenges. A comprehensive process model has been developed
Jan 1, 2007