Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Ground Characterization And Feasibility Evaluation Of Tunneling Methods For Mather Interceptor

    By Mohammad R. Jafari

    The Camp Dresser & McKee (CDM) has been retained by the Sacramento Regional County Sanitation District (SRCSD) to design the Mather Interceptor, a portion of the South Interceptor and Mather Intercept

  • SME
    Ground Characterization For CSO Tunnels In Washington, D.C.

    By Maurice A. Ponti

    The D.C. Water and Sewer Authority is implementing the Anacostia River Projects component of its Long-Term CSO Control Plan, including 21 kilometers of 3.7- to 7-meter-diameter CSO near-surface divers

  • SME
    Ground Condition Mapping: A Case Study

    By H. Lawson

    The Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03in April of 2008, providing formal guidance on using programs that model the redistribution of stress during

    Jan 1, 2012

  • SME
    Ground condition mapping: a case study - SME Transactions 2013

    By E. Zahl, J. Whyatt, H. Lawson

    The U.S. Mine Safety and Health Administration (MSHA) issued Program Information Bulletin P09-03 in April 2008, providing formal guidance on using programs that model the redistribution of stress duri

    Jan 1, 2013

  • SME
    Ground Control Analysis Of Multi-Slice Mining For Thick Western Coal Seams ? Introduction

    By T. Hackett

    Western underground coal reserves are tremendous, but recovery in western seams can be poor because of mining problems caused by deep cover, geologic anomalies, and thick seams. For instance, many sea

    Jan 1, 1987

  • SME
    Ground Control Aspects Of Longwall Coal Mining

    By D. S. Choi, D. L. McCain

    INTRODUCTION Coal is forecast to be an increasingly important and economical source of energy for the future as the supply of oil and gas declines relative to overall energy demand and perhaps in a

    Jan 1, 1983

  • SME
    Ground Control At The Climax Mine ? Introduction

    By George R. Stephans

    The Climax Mine is a panel caving mine which has had a long history of incidents of severe ground control problems. The nature of the ore deposit, which lends itself to the caving meth- of of producti

    Jan 1, 1982

  • SME
    Ground Control Design Challenges At The El Boleo Copper Project

    By David Conover

    The El Boleo Copper Project is currently in the final design stages for development of a 3-MM-tonne/yr underground copper mine located in Baja California, Mexico. The nearly horizontal mineralized zo

    Jan 1, 2009

  • SME
    Ground Control Design For Highwall Mining (237c3f7a-5149-4dad-a860-b8b9ad20fedb)

    By R. Karl Zipf

    Highwall mining is an important surface coal mining method, and it may account for approximately 4% of total U.S. coal production. Highwall stability is the major ground control related safety concer

    Jan 1, 2005

  • SME
    Ground Control Design For Pillar Extraction

    By Frank E. Chase

    Retreat mining is one of the most hazardous operations conducted underground. One of the keys to miner safety and an efficient recovery of the reserves is to design adequately sized production pillars

    Jan 1, 1993

  • SME
    Ground Control For Soft Ground Tunnels Using Chemical Stabilization - A Case History Review

    By F. Mensah-Dwumah, W. H. Baker, G. W. Clough

    INTRODUCTION The practice of injecting chemical grouts into permeable soils in order to stabilize them for tunnel construction is a common procedure in Great Britain, Europe and Japan. In this tech

    Jan 1, 1979

  • SME
    Ground Control In A Western U.S. Coal Mine: Analysis Using LAMODEL

    By Michael G. Nelson, Sekhar Bhattacharyya

    Between 1974 and 1977, a detailed study of coal pillar strength was conducted by the University of Utah at the Beehive mine in southeastern Utah. This study was funded by the U.S. Bureau of Mines, and

    Jan 1, 2005

  • SME
    Ground Control In Hard Rock Mining

    In the last four years, 2007~2010, 9 out of 24 metal/nonmetal underground mine fatalities were caused by ground fall across United States of America (Mine Safety & Health Administration, MSHA). To red

    Jan 1, 2012

  • SME
    Ground Control Investigations In Room And Pillar Stopes

    By N. M. Raju, S. K. Dutta, M. A. Khan, B. Singh

    The paper seeks to present the application of ground control research at Mosaboni Copper Mines to increase the size of stoping areas. Room and Pillar stopes were experimented for increased production

    Jan 1, 1981

  • SME
    Ground Control Investigations using a Microseismic Monitoring System in a Multiple-Level Underground Limestone Mine - RASIM 2022

    By Michael Murphy, Mark Van Dyke, VASU GANGRADE, Brent Slaker

    Room-and-pillar mining in multi-level underground stone mines come with unique pillar stability issues. The pillar stability in these mines primarily depends on the thickness of interburden between mi

    Apr 26, 2022

  • SME
    Ground Control Monitoring System In Leeville Underground Mine - Preprint 09-063

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 3,200 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f

    Jan 1, 2009

  • SME
    Ground control monitoring system in the Leeville underground mine - SME Transactions 2009

    By C. Sun

    The Leeville underground mine has been in operation since 2006 and currently produces 2,903 t (3,200 st) of ore per day, with an average gold grade of 0.4 opt. The mine’s horizontal extent is large, 7

    Jan 1, 2009

  • SME
    Ground Control Monitoring: A Comprehensive Guide for Mine Operators on Instrumentation and Data Acquisition Currently Used by the National Institute for Occupational Safety and Health (NIOSH) - SME Annual Meeting 2024

    By Todd Minoski, Matthew McElhinney, Mark Mazzella, Morgan Sears, Craig Compton

    The National Institute for Occupational Safety and Health (NIOSH) is staffed with Engineers, Geologists, and Field Technicians conducting a variety of ground control research. The mission of the groun

    Feb 1, 2024

  • SME
    Ground Control of Strip Backfilling Water Conservation Mining in Shallow Coal Seams

    According to the classification of water conservation mining in shallow coal seams in China, when the ratio of the impermeable layer thickness to the mining height is less than 18, the mining belongs

    Jan 7, 2020

  • SME
    Ground Control Problems And Possible Remedial Measures At An Underground Coal Mine

    By S. M. Hsiung

    This paper presents the results of an extensive study concerning a series of roof falls in a room-and-pillar coal mine located in West Virginia. Three dimensional finite element modeling was employed

    Jan 1, 1985