Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Maximizing REE Enrichment by Froth Flotation of Alaskan Coal Using Box-Behnken Design Mining, Metallurgy and Exploration (86fb0501-8584-411a-8eaa-300608562be7)

    By T. Gupta, T. Ghosh

    Rare earth elements (REEs) and their compounds are essential in a multitude of mundane and sophisticated applications such as renewable energy technologies, catalysts, medicine, and defense applicatio

  • SME
    Maximizing REE Enrichment by Froth Flotation using Box-Behnken Design in Alaskan Coal

    By T. Gupta, T. Ghosh

    "Rare Earth Elements (REEs) and their compounds are essential for numerous modern high tech applications such as renewable energy technologies, catalysts and defense applications. The destabilization

    Jan 1, 2017

  • SME
    Maximizing Return On Capital Projects

    By J. Humphries

    With today?s turbulent markets and unprecedented global opportunities, the need to optimize net present value and internal rates of return from capital investments has never been greater. To help addr

    Jan 1, 2011

  • SME
    Maximizing the processing of polymetallic concentrates via actinide separation and rare earth retrieval

    By Mona M. Fawzy, Ahmed A. Eliwa, Ebrahim A. Gawad, Ahmed H. Orabi, Amal E. Mubark

    The growing demand for rare earth elements (REEs) has led to numerous recent studies to recover these elements from various bearing ores and wastes. Therefore, the recovery of REEs from Ras Baroud pol

    Oct 1, 2024

  • SME
    Maximizing Value By Protecting Your Intellectual Property Assets ? Introduction

    By S. E. Chetlin

    In the mid-1970?s, the market value of tangible assets of S&P 500 companies far outstripped the value of intangible assets, including intellectual property (e.g., 83% tangible assets v. 17% intangible

    Jan 1, 2012

  • SME
    Maximum Attainable Recovery (Or Extraction) Of Metals In Extractive Processes

    By R. W. M. Lai

    In flotation or hydrometallurgical leaching of minerals, the cumulative metals recovery for a given process condition generally approaches a maximum value or an asymptote as the process time increases

    Jan 1, 1983

  • SME
    Maximum Charge Weight Equation for Underground Blast Overpressures

    By B. Petri, N. Rouse

    "Air overpressure monitoring procedures and instrumentation guidelines which apply to production blasting in underground limestone mining are not readily available. The industry also lacks an applicab

    Jan 1, 2015

  • SME
    Maximum estimation error correlation between short and long-term production volumes

    By V. C. Koppe, J. F. C. L. Costa, D. M. Marques, A. Amaral

    Errors associated with estimating the grade of an attribute of interest in a deposit can compromise planning, sequencing, and mineral beneficiation decisions. Several factors are associated with estim

    Jun 25, 2023

  • SME
    Maximum Utilization Of ANFO Energy By Proper Initiation

    By Paul H. Rylund

    Substantial priming was a considered necessity for proper initiation of ammonium nitrate-fuel oil mixes as ANFO began to carve its niche in the mining industry in the latter fifties. Heavy priming acc

    Jan 1, 1972

  • SME
    Maysville: Total Transportation

    By Keith P. Bingham

    A total transportation system providing for delivery of finished products to customers and raw materials to the plant is one of the key elements contributing to Dravo Lime Co.'s success. Dravo

    Jan 10, 1982

  • SME
    MBTA Red Line Extension Northwest: The Influence Of Geology On Alignment And Grade

    By Harry Sutcliffe, Francis M. Keville

    The paper describes the, impact of the geotechnical exploration program on the line and grade of the tunnels and the shaft configuration on the Red Line Extension N.W. in Cambridge and Somerville, Mas

    Jan 1, 1983

  • SME
    MBTA Silver Line Phase III?Completes Boston?s Newest Transit Line

    By Gregory Yates

    INTRODUCTION Project Description The Silver Line is a Bus Rapid Transit (BRT) Line and is Boston?s newest transit service. Silver Line Phase I extends along Washington Street entirely on the surface

  • SME
    McAlpine Mill and Haileybury School of Mines: A Co-op That Works

    By Kevin Beirne

    Most people involved in the mining industry are familiar with student-industry co-op work-study programs. Many colleges and universities have used them for years. Northern College’s Haileybury Schoo

    Jan 1, 1999

  • SME
    McNally Peck Centrifuge System

    By Myron W. Mellor

    Our efforts at McNally, to find a better way to mechanically separate particles from liquid in a slurry have led to the development of two new centrifuges. The first unit utilizes a slotted opening

    Jan 1, 1975

  • SME
    MDC’s Hartford, Connecticut South Tunnel Project: Integrating Site Investigation Technology, Geology and Geotechnical Engineering for Effective Ground Characterization

    By Robin Dill, Wei Song, Andrew Perham, Leo Martin

    "AECOM completed a subsurface exploration program for an 18-foot diameter, approximately 4-mile long rock tunnel project in Hartford, CT. The tunnel crosses the regional geologic trend through the mid

    Jan 1, 2016

  • SME
    Meandu Rising: The Second Life Of Tarong Coal Project's Meandu Mine - Introduction

    By J. G. Pippenger

    Rio Tinto Coal Australia (RTCA) developed Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent newly constructed Tarong Power Station (TPS). In designing the mine, RTCA

    Jan 1, 2011

  • SME
    Meandu Rising: The Second Life Of The Meandu Mine

    By J. G. Pippenger

    Rio Tinto Coal Australia (RTCA) developed the Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent and newly constructed Tarong Power Station (TPS). In designing the min

    Jan 1, 2011

  • SME
    Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, Austria

    By Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin

    PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973

    Jan 1, 2005

  • SME
    Measured values of coal mine stopping resistance

    By N. Oswald

    As coal mines age and become more developed, ventilation modeling becomes more important for the planning and continued operation of the system. Numerous studies have been performed and presented that

    Jan 1, 2009

  • SME
    Measurement and Analysis of Foundation Tilt Resulting From Mine Subsidence in Southern Illinois

    By Larry R. Powell

    The Bureau of Mines, in cooperation with the Illinois Mine Subsidence Insurance Fund, is monitoring the response of two foundations to ground movements induced by subsidence from high extraction minin

    Jan 1, 1986