Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pressure-Quantity Survey Techniques And Computerized Ventilation Simulation For Large Scale Room And Pillar Mines ? IntroductionBy Steven P. Oman
Large room and pillar mines are characterized by numerous and widespread working places. Ventilation requirements are high since each panel employs men and equipment that work simultaneously in multip
Jan 1, 1983
-
The Mineral Industry Of Other Central African Countries - Cameroon (fe2c76cc-aacc-40bb-bcec-18232751169e)By Suzann C. Ambrosio
Crude petroleum, the only commercially exploited mineral resource in Cameroon, continued to dominate developments in the mineral industry sector. International mining concerns have expressed interest
Jan 1, 1983
-
Evolution of sandwich belt high-angle conveyorsBy Earl M. Frizzell, Joseph A. Dos Santos
"Conventional belt conveyors offer an economical method for transporting materials at inclines approaching 18 degrees. Sandwich belt conveyors may be used to transport materials at high angles, to 90
Jan 1, 1983
-
OFR-150-83 Ground Control In Multi-Level Room And Pillar MinesBy William G. Pariseau
The research reported here concerns ground control in multi-seam mining and relates mainly to the analysis of stress about multi-seam room and pillar mines. The two variables of most concern are dista
Jan 1, 1983
-
Abrasion and Wear in Mills (c81aa51e-7cf2-4e98-8abb-ce5490402a45)By K. G. Eriksson
"The first tentative test made to try rubber lining in grinding mills was made in the early twenties. However, because of poor rubber compounds and design the results did not prove to be promising.In
Jan 1, 1983
-
Recovery of Cooper from Copper-Lead DrossBy Arthur A. F, MacKenzie I. H
Copper in zinc/lead sinter charged to the Imperial Smelting Furnace operated by Sulphide Corporation Pty Limited at Cockle Creek, New South Wales, concentrates in a complex lead dross which forms as t
Jan 1, 1983
-
An Engineering Workstation For Mine Planning ApplicationsBy A. Bouillot, G. W. Luxbacher
In a reserve assessment in areas where multiple coal seams lie above drainage or outcrop and where mining options include contour, auger, mountaintop removal and underground methods, the mining techni
Jan 1, 1983
-
Slurry Transport Properties of Graded Coal WasteBy Robert W. McKibbin
The Bureau of Mines conducted laboratory tests to determine the slurry transport and deposition properties of coal waste. A 188.5-ft pipe test loop was constructed with instruments to measure density,
Jan 1, 1983
-
Selection of large diameter wire rope for use on surface milling excavatorsBy Ronald G. Hamm
"With the advent in Canada of large open-pit equipment, the associated wire rope required must keep pace, especially in design and construction, along with the field that leads to increased rope life.
Jan 1, 1983
-
Continuous On-Line Analysis Of Coal ? IntroductionBy O. J. Tassicker
The Electric Power Research Institute (EPRI) initiated a program in 1976 to develop and demonstrate an instrument system for on-line continuous measurement of coal properties. The program has focused
Jan 1, 1983
-
IC 8943 Interim Performance Specifications For Transducer Modules Used With The Bureau Of Mines Intrinsically Safe Mine Monitoring System - Carbon Monoxide, Methane, And Air VelocityBy J. E. Chilton
Interim performance specifications are presented for carbon monoxide, methane, and air velocity transducers used in the Bureau of Mines intrinsically safe mine monitoring system. These specifications
Jan 1, 1983
-
SPOTLIGHT on materials handling in open-pit minesBy B. C. Alberts
Rapid and effective handling of run-of-mine, waste, and treated materials is vita.! to every step of resource development and recovery. Modern mine managements have planned and engineered systems for
Jan 1, 1983
-
Justification For Possible Use Of Indigenous Kimberlite Minerals In Evaluation Of Diamond PotentialBy Jill Dill Pasteris
Several mineralogical prospecting techniques are used in diamond exploration. Most are concerned with identifying indicator minerals such as garnet and ilmenite, which are derived from mantle xenolith
Jan 1, 1983
-
Low-Sulfur Coals of Southern West Virginia: A Depositional ModelBy B. M. Blake, R. S. Reppert, A. F. Keiser, E. J. Trinkle
The southern West Virginia coalfield was formed in a rapidly subsiding depositional basin associated with deep-seated growth faults. Subsidence began to the southeast during deposition of the Pocahont
Jan 1, 1983
-
Overview Of The Belle Ayr Mine, The Largest Producing Coal Mine In The United StatesBy Gary J. Brown
AMAX Coal Company, the nation's third largest coal producer operating in Indiana, Illinois and Wyoming, is a division of AMAX, INC., a United States based natural resources corporation that opera
Jan 1, 1983
-
The balancing of a centrifugal millBy A. A. Bradley, K. H. Stanton, P. J. D. Lloyd
A theory for the dynamic balancing of centrifugal mills is presented that takes account of the mass and shape of the charge in a gyrated grinding tube and the way in which the charge lags behind the c
Jan 1, 1983
-
IC 8934 A Dynamic Gas-Mixing SystemBy C. R. Carpenter
A dynamic gas-mixing system assembled by the Bureau of Mines for the generation of precise gas mixtures from sources of concentrated or pure gases and diluent gases is described. A set of electronic m
Jan 1, 1983
-
Causes And Mechanisms Of Massive Pillar Failure In A Southern West Virginia Coal MineBy A. W. Khair
This paper deals with the causes and mechanisms of pillar failure in a southern West Virginia coal mine. The conclusions are based on in-mine observations and analysis of mining methods, eyewitness ac
Jan 1, 1983
-
RI 8772 Factors Affecting the Preparation of Misted Clay Feed and Solids-Liquid Separation After HCI LeachingBy R. S. Olsen
Although aluminum is easily leached from calcined clay with boiling mineral acids, the presence of fines and slimes in the leached residue has hindered the application of acid leaching processes. A fe
Jan 1, 1983
-
RI 8770 Integrated Operation of Ferric Chloride Leaching, Molten-Salt Electrolysis Process for Production of LeadBy M. M. Wong
The Bureau of Mines, under a cooperative research program with four lead companies, has investigated a nonsmelting process for the production of lead metal. The process, which would eliminate sulfur d
Jan 1, 1983