Search Documents

Sort by

  • SME
    Ground Improvement in Glacial Soils for the Lower Olentangy Tunnel—Columbus, OH - RETC2023

    By Jeremy Cawley, Jeff Murphy, Horry Parker, Brock Gaspar, Jake Keegan

    The Lower Olentangy Tunnel project includes 47,000 cubic yards of planned ground improvement for earth pressure balance machine (EPBM) tunneling (5.2 km) and microtunneling (335 m) in glacial soils. J

    Jun 13, 2023

  • SME
    Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023

    By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch

    The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align

    Jun 13, 2023

  • SME
    Development and Performance of Large Span Caverns at Depth for the LBNF Far Site Project - RETC2023

    By S. Pollak, J. Rickard

    The Long Baseline Neutrino Facility Far Site in Lead, South Dakota is currently under construction and involves drill and blast excavation of the largest and deepest caverns in North America. This pap

    Jun 13, 2023

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023

    By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani

    The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P

    Jun 13, 2023

  • SME
    Launch of an Earth Pressure Balance Tunnel Boring Machine in Short-Mode on a Congested Site from Narrow Deep Shafts for The Alexrenew Project in Alexandria, Virginia: A Case Study - RETC2023

    By Luis Fernandez-Deza, James Hawn, Dustin Mount, Jean-Marc Wehrli

    The RiverRenew Tunnel System project in Alexandria, VA forms part of a CSO scheme aimed at reducing overflows of combined stormwater and sewage into the Potomac River during storm events. A major piec

    Jun 13, 2023

  • SME
    Bay Park Conveyance Project, New York—Construction Update - RETC2023

    By David I. Smith, Kenneth Arnold, Bryan Aweh, Vincent Falkowsk, Brian Lakin, Andy Fer

    Nassau County, New York, is undertaking several projects to improve the water quality in the Western Bays of Long Island. A major step forward will be the completion of the Bay Park Conveyance Project

    Jun 13, 2023

  • SME
    Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023

    By Raoul Fernandez, Bernard Catalano, Guillaume Roux

    The Thaumasia Joint-Venture, composed of Bouygues Travaux Publics, Soletanche- Bachy and Bessac, completed the construction of the underground section of line 2 of the Nice tramway, which comprised a

    Jun 13, 2023

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Progressive Design-Build in the Tunneling/Underground Construction Industry—Perspective from the Private Sector - RETC2023

    By Carlos Tarazaga

    Progressive Design-Build (PDB) is an emerging variation of alternative delivery programs in the underground construction industry. PDB refers to the way a construction project design is developed by t

    Jun 13, 2023

  • SME
    Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023

    By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski

    High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode

    Jun 13, 2023

  • SME
    Unique Umbilical Launch of a Slurry TBM in LA - RETC2023

    By Nick Karlin

    Dragados USA is constructing the LA Effluent Outfall Tunnel, a 7-mile, 18 ft internal diameter effluent discharge tunnel, utilizing a 21.6 ft (6.585 m) Herrenknecht Mixshield TBM. This paper highlight

    Jun 13, 2023

  • SME
    A Novel Method of Roadway Floor Deformation Control by Deep‑Hole Directional Tension Blasting—A Case Study - Mining, Metallurgy & Exploration (2023)

    By Changjiang Li, Jun Yang, Qiang Fu, Xu Chang, Xing Wu, Yubing Gao

    With the development of underground mining, the deformation of roadway floor has increasingly become a major constraint on the safe and efficient production of coal mines. To address the floor deforma

    Jun 13, 2023

  • SME
    Rapidly Searching for Carbonatite‑Related REE Mineralized Systems Using Biotite and Barite Mineral Chemistry: an Economical REE Exploration Program - Mining, Metallurgy & Exploration (2023)

    By Xiaochao Shu, Kun Wang, Fanwei Meng, Rui Tao

    Rapidly searching for carbonatite-related rare earth element (REE) mineralized systems is of paramount importance to explorers, because these systems provide the world’s most significant supply of REE

    Jun 9, 2023

  • SAIMM
    Stability evaluation of room-and-pillar rock salt mines by using a flat jack technique – A case study

    By M. Z. Emad, N. Abbas, Y. Majeed

    Room-and-pillar mining is commonly employed for the extraction of rock salt in undergroundmines. Pillar stress is a major concern in these mines as it is directly related to stability and mineralrecov

    Jun 5, 2023

  • SAIMM
    Dependence of solar reflector soiling on location relative to a ferromanganese smelter

    By K. J. Craig, M. A. Swart, Q. G. Reynolds, L. Hockaday

    A solar reflector soiling study was carried out at a ferromanganese smelter in South Africa to assess the soiling rates at different locations around the plant. Several meteorological parameters were

    Jun 5, 2023

  • SAIMM
    Assessing coal mine closures and mining community profiles for the ‘just transition’ in South Africa

    By A. T. van Zyl, M. Mthenjane, M. J. Cole

    Growing global concern over the impacts of climate change, attributable largely to fossil fuel energy sources, has led to the widely shared goal for a ‘just transition’ to cleaner energy and reduced d

    Jun 5, 2023

  • SAIMM
    Predicting open stope performance at an octree resolution using multivariate models

    By K. Woodward, Y. Potvin, B. McFadyen, M. Grenon

    Open stoping has become a popular mining method in hard rock mines, not only due to the safety of the method as a non-entry approach, but also because of the high extraction rate and low costs. At min

    Jun 5, 2023

  • SAIMM
    Spontaneous combustion of carbonaceous shale at an iron ore mine, South Africa

    By B. Genc, C. Gous

    Spontaneous combustion during coal mining operations is a major problem that affects the health and safety of workers and causes environmental problems. The phenomenon is associated with the presence

    Jun 5, 2023

  • SME
    Study on the Tribocharging Properties of CaCO3 particles in a Cyclone Tribocharger - Mining, Metallurgy & Exploration (2023)

    By Yang Song, Li Shaokang, Wang Zhiqiang, Wang Jinjun, Li Guofeng, Su Meixuan

    CaCO3, as a component widely existing in natural minerals, is a common impurity. In recent years, triboelectric separation has been applied to the separation of minerals containing CaCO3. However, the

    Jun 3, 2023