    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    How Choice Of Foundation Can Alter The Fate Of A Bridge Project – 3 Case Studies

    By Alok Bhowmick

    The most uncertain and challenging part of a bridge design and construction is the ‘Choice of foundation’. During the planning and conceptual design stage, it is extremely important to choose the righ

    Nov 1, 2022

  • DFI
    Use Of High Capacity Grouted Tension Piles Installed Vibration Free And Soil Displacing

    By Peter de Kort

    Tunnels in urban areas generally require deep excavations in soils under the groundwater table. In The Netherlands uplift loads are generally taken by piles installed into dense sand layers, which are

    Jan 1, 2008

  • DFI
    Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-Walls

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city

    Sep 8, 2021

  • DFI
    New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and Logistics

    By Max Gwynn, Tony Suckling

    "The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.

    Jan 1, 2008

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Deep Cfa Piles Application For Foundation In Queensland

    By Sameh M. Khella

    This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t

    Nov 1, 2022

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments were strong

    Jan 1, 2015

  • DFI
    Rock Socket Capacity Certification Using the Point Load Index Test

    By Burt G. Look, David W. Lacey

    "Certification of foundation capacity during the construction phase is often assessed by strength or weathering state descriptors based on visual observations. This case study used the Point Load Inde

    Jan 1, 1900

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • DFI
  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • DFI
    Deep Vibrocompactation By Stone Columns And Liquefaction Investigation

    By P. Ventura

    Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde

    Jan 1, 1989

  • DFI
  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    The Use Of A Reverse Circulation Diaphragm Walling Technique To Form A Plastic Cut-Off Wall Around Sizewell B Power Station

    By H. F. Cowie

    Britain's first pressurised water reactor (PWR) Nuclear Power Station is now under construction at Sizewell on the Suffolk coast. A linear cut-off wall was proposed to ensure that the drawdown of

    Jan 1, 1989

  • DFI
    Current Pile Foundation Practice In Taiwan ? Synopsis

    By Za-Chieh Moh

    This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize

    Jan 1, 1996

  • DFI
    The Historical Evolution Of Piling And Deep Foundations And Prospects For The Future.

    By W. G. K. Fleming

    The general history of piling is traced up to the present time with regard to the evolution of methods and materials. The processes have been strongly influenced by developments in basic equipment and

    Jan 1, 1999

  • DFI
  • DFI
    Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)

    By Richard J. Finno

    This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti

    Jan 1, 2010