Search Documents
Search Again
Search Again
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Outlook For Mineral Development In Alaska
By John F. M. Sims
Political issues and a glaring infrastructure deficiency have retarded the emergence of a strong mining component to the Alaskan economy in recent years. Barriers to orderly mineral development are sl
Jan 1, 1982
-
Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059
By H. Walqui
The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has
Jan 1, 2009
-
Industrial Minerals review 2018
By E. Lee Bray
"Editor’s note: The editors thank those who make this annual issue possible. A special thank you goes out to the Industrial Minerals Annual Review editor, to the Industrial Minerals & Aggregates Divis
Jul 1, 2019
-
Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel
By C. D. Hebert, M. R. King
The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with
Jan 1, 2007
-
Elm Road Generating Station Water Intake Tunnel
By Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project
By Pratoomkhuan N. Lertsgoon
A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study
Jan 1, 2003
-
Groundwater Restoration For In Situ Solution Mining Of Uranium
By J. R. Riding
In situ solution mining of uranium has environ- mental advantages over conventional mining. The leaching of uranium, however, alters the groundwater quality in the aquifer where the mining occurs. Cur
Jan 1, 1979
-
Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom
By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler
National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci
Jan 1, 2007
-
Measurement Of Weak And Dissociable (Wad) Cyanide With A Modified Potentiometric Titration
By M. Botz
For leach solutions containing primarily free cyanide, the silver nitrate titration method is a rapid and acceptably accurate means of analyzing for cyanide. However, in leach solutions containing ele
Feb 27, 2013
-
Entrepreneurial spirit guides development of Gardner’s Point gold mine in Northern California
Introduction Some people say it is almost impossible to get mining permits in California. Some say the day of the lone mining entrepreneur is past. And some say you cannot make money mining gold wher
Jan 3, 1987
-
Upper Rouge Tunnel CSO Control
By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour
To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage
Jan 1, 2007
-
Design/Build Agreement For The Niagara Tunnel Project
By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Inspection of a Brick-Lined Aqueduct
By Paul S. Fisk, Arne Fareth, Julie Frietas, Francis Lo, Fidel L. Mallonga
INTRODUCTION This report describes the inspection of parts of the New Croton Aqueduct (NCA)undertaken for the New York City Department of Environmental Protection (NYCDEP)by Parsons Brinckerhoff Qu
Jan 1, 2007
-
New York City’s Harbor Siphons Water Tunnel
By Colin Lawrence, Michael S. Schultz
Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of
Jan 1, 2007
-
Mini Symposium ? In Pit Crushing And Grinding I - Mobile In-Pit Crushing - Mobile In-Pit Crushing--Product Of Evolutionary Change
By E. M. Frizzell
Development of mobile crusher systems for surface mining, allowing extension of continuous conveyor haulage systems into the pit, is traced from its introduction to the present. Variations in configur
Jan 1, 1983
-
Emergency Repairs to Beach Interceptor Tunnel
By David Jurich, Joseph N. McDivitt
INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,
Jan 1, 2007
-
The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply System
By Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
-
Effect Of Cycle Time On Work Done By The Pistons During Hydraulically Actuated Clamshell Dredging
By B. A. Osei
Research to evaluate possible metrics for predicting dredgeability of compact aggregates, by hydraulically actuated clamshell dredges, shows work done by the pistons as a viable metric. Analysis of fi
Jan 1, 2011
-
Industrial Minerals Review 2011
Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the
Jan 1, 2012