    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Outlook For Mineral Development In Alaska

    By John F. M. Sims

    Political issues and a glaring infrastructure deficiency have retarded the emergence of a strong mining component to the Alaskan economy in recent years. Barriers to orderly mineral development are sl

    Jan 1, 1982

  • SME
    Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059

    By H. Walqui

    The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has

    Jan 1, 2009

  • SME
    Industrial Minerals review 2018

    By E. Lee Bray

    "Editor’s note: The editors thank those who make this annual issue possible. A special thank you goes out to the Industrial Minerals Annual Review editor, to the Industrial Minerals & Aggregates Divis

    Jul 1, 2019

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.

    Jan 1, 2007

  • SME
    Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project

    By Pratoomkhuan N. Lertsgoon

    A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study

    Jan 1, 2003

  • SME
    Groundwater Restoration For In Situ Solution Mining Of Uranium

    By J. R. Riding

    In situ solution mining of uranium has environ- mental advantages over conventional mining. The leaching of uranium, however, alters the groundwater quality in the aquifer where the mining occurs. Cur

    Jan 1, 1979

  • SME
    Outline Design And Construction Of The 10 Km (6.25 Mile) Croydon Cable (High Voltage) Tunnel Through Groundwater Source Protection Zones, United Kingdom

    By Colin Rawlings, Simon Pepper, Maria Karakitsiou, John Mathews, Peter Townsend, Russell Bowler, David Keeble, Christopher Darton, Scott Sadler

    National Grid needs to maintain a connection between two existing electricity sub-stations (Beddington & Rowdown) in the Croydon (south London) area, and allow the replacement of two 275 kV cable ci

    Jan 1, 2007

  • SME
    Measurement Of Weak And Dissociable (Wad) Cyanide With A Modified Potentiometric Titration

    By M. Botz

    For leach solutions containing primarily free cyanide, the silver nitrate titration method is a rapid and acceptably accurate means of analyzing for cyanide. However, in leach solutions containing ele

    Feb 27, 2013

  • SME
    Entrepreneurial spirit guides development of Gardner’s Point gold mine in Northern California

    Introduction Some people say it is almost impossible to get mining permits in California. Some say the day of the lone mining entrepreneur is past. And some say you cannot make money mining gold wher

    Jan 3, 1987

  • SME
    Upper Rouge Tunnel CSO Control

    By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour

    To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage

    Jan 1, 2007

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Inspection of a Brick-Lined Aqueduct

    By Paul S. Fisk, Arne Fareth, Julie Frietas, Francis Lo, Fidel L. Mallonga

    INTRODUCTION This report describes the inspection of parts of the New Croton Aqueduct (NCA)undertaken for the New York City Department of Environmental Protection (NYCDEP)by Parsons Brinckerhoff Qu

    Jan 1, 2007

  • SME
    New York City’s Harbor Siphons Water Tunnel

    By Colin Lawrence, Michael S. Schultz

    Due to the planned deepening of the NY Harbor, NYCEDC/NYCDEP is planning to replace two existing water lines between Brooklyn and Staten Island with one deeper water pipe. The crossing, just north of

    Jan 1, 2007

  • SME
    Mini Symposium ? In Pit Crushing And Grinding I - Mobile In-Pit Crushing - Mobile In-Pit Crushing--Product Of Evolutionary Change

    By E. M. Frizzell

    Development of mobile crusher systems for surface mining, allowing extension of continuous conveyor haulage systems into the pit, is traced from its introduction to the present. Variations in configur

    Jan 1, 1983

  • SME
    Emergency Repairs to Beach Interceptor Tunnel

    By David Jurich, Joseph N. McDivitt

    INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,

    Jan 1, 2007

  • SME
    The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply System

    By Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole

    Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands

    Jan 1, 2007

  • SME
    Effect Of Cycle Time On Work Done By The Pistons During Hydraulically Actuated Clamshell Dredging

    By B. A. Osei

    Research to evaluate possible metrics for predicting dredgeability of compact aggregates, by hydraulically actuated clamshell dredges, shows work done by the pistons as a viable metric. Analysis of fi

    Jan 1, 2011

  • SME
    Industrial Minerals Review 2011

    Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the

    Jan 1, 2012