Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Value of Consulting with the Community

    By M L. van Kampen

    The recent (2005) amendments to the Resource Management Act 1991 have made it clear that there is no obligation on an applicant to consult. However the importance and value in consulting with the comm

    Jan 1, 2006

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    The Practice of De-Silverizing Base Bullion at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    THE de-silverizing of base bullion at the Port Pirie works is carried out in accordance with the principles of the well-known Parkes process. The base bullion produced by the blast furnace department

    Jan 1, 1922

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    What is Expected of Explorers

    Miners and explorers in New Zealand are expected to consult with stakeholders, keep out of core conservation areas, and operate a high standard of environmental management and rehabilitation. These re

    Jan 1, 1997

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Occurrence and Mineralogical Association of Phosphorus in Australian Bedded Iron Ore Deposits

    By M A. Wells

    The various mechanisms by which phosphorus (P) occurs and is distributed within banded iron formations (BIF)-derived iron ore are examined. In unenriched, precursor BIF P occurs predominantly as discr

    Jul 11, 2011

  • AUSIMM
    The Effectiveness of Interpanel Pillars in the Control of Surface Subsidence

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence poin

    Jan 1, 1992

  • AUSIMM
    WaihiÆs 2020 Vision: Part C: How Did We Get There - The Process

    By S M. Stewart

    Building and Maintaining Community Relationships   In mining terms, the town of Waihi is distinctive with the Martha mine situated right in the heart of the town. MarthaÆs central location and ot

    Jan 1, 2006

  • AUSIMM
    Gold Mining South Australia The First Fifty Years

    By Fradd WP

    South Australia pioneered metal mining in Australia and was the main source of copper for several decades. Gold discoveries and mining also contributed significantly to the development of the Colo

    Jan 1, 1987

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel Intersections

    By Hocking G

    For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D

    Jan 1, 1976

  • AUSIMM
    Study on Beneficiation Technology of a Refractory Fluorite Ore in North China

    Study on Beneficiation Technology of a Refractory Fluorite Ore in North China

    Sep 13, 2010

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    The Energy Outlook in the Pacific Basin Region (0d1a04ad-4b32-49e8-99a0-89cb5b1072bb)

    The outlook for suppliers of energy to the expanding economies of the Pacific Basin region is essentially positive, but particularly for exporters of high quality steam coal. This paper argues that ec

    Jan 1, 1990

  • AUSIMM
    Coal - Paper No. 7 Permian Sedimentation In The Newcastle Coalfield, N.S.W.

    By Johnson M. W

    Factual data about the sedimentation in the Newcastle Coal. Measures are presented. Data concerning the total coal measure sequence (isopachs, sand /shale ratio and total coal thickness variation),

    Jan 1, 1969

  • AUSIMM
    The Condition of Refractory Gold in Lake View and Star (Kalgoorlie) Ore

    The sulphide ores of the Kalgoorlie goldfield have long been looked upon as' refractory, involving special metallurgical treatment. For many years two kinds of treatment have been practised-(l) w

    Jan 1, 1937

  • AUSIMM
    Geostatistics in the Statigraphic Orebodies at Mount Isa

    By Scott IR

    In stratigraphic orebodies, estimation of footwall and hangingwall location is often of more importance than grade estimation. Contoured grade estimates often produce smeared boundaries and the us

    Jan 1, 1986

  • AUSIMM
    Optimum Equipment Management Through Life Cycle Costing

    Large mining operations need equipment that consistently performs as expected. The most effective way of ensuring this is to have a defined life cycle with an optimised maintenance strategy. The deter

    Dec 6, 2010

  • AUSIMM
    A Study of the Composition, Microstructure, and Softening Characteristics of Some Zinc-Lead Sinters

    By Shoobridge PH

    Operating difficulties during 1977 with the Imperial Smelting Furnace operated by Sulphide Corporation Pty. Limited at their Cockle Creek zinc-lead smelter were found to be caused by premature so

    Jan 1, 1978