Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Conversion of a Pelletising Induration Furnace from a Haematite to Magnetite Feed

    By R Jones

    OneSteel Whyalla’s grate-kiln-cooler pelletising plant was commissioned in 1968 processing haematite feed from the local South Middleback Ranges mining area. The existence of a magnetite resource bene

    Jul 11, 2011

  • AUSIMM
    The Development of a CADD Mine Design System

    By Gill L. F, Gleeson HB

    This paper describes the development of a Computer Aided Design and Drafting based mine planning system in the State Electricity Com- mission of Victoria. The system combines a commercially available

    Jan 1, 1989

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    Improved Cleaner Circuit Design for Better Performance Using the Jameson Cell

    By R Araya, G Harbort, D R. Seaman, L Huynh, P D. Munro

    In today’s operating environment many conventional cleaner circuits struggle to produce final grade concentrate with acceptable levels of non-sulfide gangue and/or penalty elements. This is primarily

    Sep 1, 2014

  • AUSIMM
    Successfully Implementing Technology-driven Change in the Mining Environment

    By B McCarthy

    Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of

    Jun 22, 2016

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    Explosibility Limits - Establishing Criteria for Mine Re-Entry

    By D Cliff

    "Recent underground coal mine incidents have again raised the issue of: under what circumstanceis it safe for personnel to re-enter the mine? Mine rescue guidelines make recommendations aboutthe limit

    Jun 1, 2012

  • AUSIMM
    Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availability

    By E Shilov, R Dixon, L Tovey

    BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit

    Nov 29, 2022

  • AUSIMM
    Evaluation of a Single-Layer Desulfurised Tailings Cover

    By G W. Wilson, M Aubertin

    A desulfurised tailings cover was installed at the Detour Lake Mine in Ontario, Canada, to reduce oxygen penetration into the underlying sulfidic tailings. The cover ranges from one to 1.5 m in thickn

    Jan 1, 2003

  • AUSIMM
    An approach for evaluating a liberation function

    By Massacci P

    A review has been made of the studies focusing on methods for the description of grain -size distribution after breakage and, separa- tely, of the degree of liberation of the miner- al species makin

    Jan 1, 1986

  • AUSIMM
    InnovativeApplications of Hydrocyclonic Devices

    The operation of cyclones and cylinders is briefly described and com- pared, and a number of recent applications in mineral, gold and coal plants discussed. The capacity of an existing pump and cyclo

    Jan 1, 1988

  • AUSIMM
    Mine Fires and Ventilation

    By Upfold RW, Velzeboer MD

    An underground mine fire will influence the ventilation equilibrium in several ways which results in a redistribution of the ventilating quantities and pressures throughout the whole mine. The vent

    Jan 1, 1981

  • AUSIMM
    Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional Area

    By A Bagis

    Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while

    Mar 8, 2011

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Design and Evaluation of Dry Fill

    By Blair J. R, Barrett J. R

    In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry

    Jan 1, 1973

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018

  • AUSIMM
    Non-renewable Energy Resources of Queensland

    The non-renewable energy resources of Queensland comprise coal, petroleum (oil and gas), oil shale and uranium. Coal is widely distributed., and has been developed extensively both for export and f

    Jan 1, 1979

  • AUSIMM
    Prognostic models for electroslag remelting process and slag engineering

    By D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar

    Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree

    Aug 21, 2024

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    Environmental Investigations and Procedures to Support Mining Consent Applications

    By M Foster

    The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a

    Jan 1, 1988