Goafstream Sampling and the Barometer
By M Brady
"It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h
Jun 1, 2012
-
Design of Segmental Lining for Waterview Project, Auckland, New?Zealand
By S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western Australia
By C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control
By W P. Breytenbach
"The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued
Jul 29, 2014
-
Liquefaction behaviour of tailings under cyclic simple shear testing
By A Li, H Jinto, M Laxman
The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp
Jul 23, 2018
-
The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study
By B Jones, M Chappell
Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the
Sep 17, 2014
-
Change Challenges for Large Open Pit Mines
By R Durchholz, A-J Heiertz, R Schmitz
Mining of lignite is the largest bulk materials handling activity in Europe. In order to mine this lignite, with an average calorific value of only a third of bituminous coal in an economical way, hig
Sep 18, 2012
-
Instability analysis in three-way and four-way coal mine intersections
By B Abbasi
It is well known that most roof falls in coal mines typically occur at and around intersections. Room-and-pillar and longwall coal mining systems typically develop 3-way and 4-way intersections. This
Nov 30, 2018
-
Computational Fluid Dynamics Modelling of Coal Dust Explosions and Suppression Systems
By G Collecutt, D Proud, D Humphreys
"The hazards associated with dust explosions are well known, and coal dust explosions present a significant hazard in the underground coal mining industry worldwide. In earlier work, we presented comp
Aug 31, 2015
-
Contemporary Criteria of Open Pit Long-Term Production Scheduling
Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
Northparkes Mines - New Performance Benchmarks for Underground Mining
For more than 15 years after the Northparkes orebodies were first discovered in 1976, the project was delayed by the need to find an economic way of mining the low-grade E26 deposit. The decision to
Jan 1, 1997
-
Mechanisms on the impacts of basicity on hydrogen-rich gas-based direct reduction of pellets
By J Pan, C M. Tang, D Q. Zhu, C C. Yang, S W. Li, Z Q. Guo
The short process of electric furnace steelmaking with direct reduction iron (DRI) as raw material is an important process for smelting high-quality and special steels. In order to prepare high-qualit
Sep 18, 2023
-
Modelling Geometallurgical Variability - A Case Study in Managing Risk
By S Khosrowshahi, A Weeks, W J. Shaw
"To provide an indication of expected performance of the mine and mill, feasibility studies should include an assessment of the expected day-to-day variability in process plant feed. Attempts to do th
Sep 29, 2013
-
Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction
By M Hawkins
The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.
Mar 8, 2011
-
Evaluation of Mineral Processing Effectiveness and Causes of Mineral Losses
By Siwiec A
The laboratory investigations which are necessary to evaluate the mineral processing effectiveness usually include density separation of narrow size fraction of the feed and one of the products. In
Jan 1, 1993
-
Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill
By R A. Pax, B Cornish
"Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly
Oct 10, 2016
-
Energy and Water Requirements in the Treatment of Refractory Gold Ores
By R Dunne, J Dodd, J Snyder, F Roberto
Energy costs are steadily increasing worldwide while the availability and quality of water are becoming contentious issues between the users (municipalities/households, agriculture, manufacturing and
Sep 26, 2013
-
Alluvial Mineral Property Valuation
Outline of situations when valuations required - from capital raisings and takeovers, stamp duty, rates and capital gains tax, to probate and litigation between joint venture parties. Definition of t
Jan 1, 1992
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension
By L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
Raisebore drill string recovery case study
By M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021