Transfer of Zinc from LGM Concentrate to Zinc Concentrate at the Hilton Concentrator of Mount Isa Mines Limited
By Burford B. D, Johnson N. W, Rohner P
Under design philosophy, the Hilton concentrator produced lead, zinc and LGM (lead plus zinc) concentrates. The LGM (Iow grade middling) concentrate was produced by combining coarse middling streams f
Jan 1, 1994
-
Dewatering Open Pit Mines, Yilgran Craton, Western Australia
Open pit mines in the Yilgam Craton have unique hydrogeological characteristics resulting from a combination of geology, mineralisation and the complex and extended development of the regolith. The pr
Jan 1, 1993
-
Mt Whaleback Mine Dewatering
By Nidagal V
This paper discusses the dewatering strategy adopted and the considerations and procedures required to incorporate a dewaterinq scheme into the Mt Whaleback mining operation. It concludes that in
Jan 1, 1986
-
Developments of the Mackie Vat Leaching Jig
Traditional vat leaching has been done on a batch basis, which involves loading the vats, leaching, drainage, washing, draining again, and unloading. As a result of these many steps and the attenden
Jan 1, 1991
-
A review of the AARL process for the elution of gold from activated carbon
By Schmidt CG
Parameters affecting gold elution using the AARL process are reviewed and critically analyzed in an attempt to optimise metallurgical efficiency and minimise costs in both current and future carbon
Jan 1, 1986
-
Planning Cost Efficient Underground Ventilation Networks
By Ruston R
When coal mining first commenced in Australia, the principle objective was low cost production with development directed toward recovery of 'easy' coal. Future expans- ion of these early m
Jan 1, 1983
-
Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill
By de Bruin J H
A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan
Jan 1, 1993
-
The Anchor Mine Operation (52dfa9d7-8b17-4c08-b69e-95fca5390990)
This paper reviews the development and operation of a small underground tin mine in NE Tasmania. Tin mineralisation was discovered in the Lottah area in the 1880's with early alluvial and eluvial
Jan 1, 1990
-
Development of the Bulga Coal Mine Complex
By Hamblyn S
Oakbridge, in combination with its joint venture partner, Nippon Steel of Japan, is expanding its Bulga underground and open cut mines to meet the growing demand for coal in the Asian market. Expans
Jan 1, 1995
-
Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs
By Mogi G, Akaike A, Yamaguchi U
A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met
Jan 1, 1995
-
Explosion in Mining
HISTORIC SIGNIFICANCE OF EXPLOSIVES TO MINERAL PRODUCTION The ancient method of breaking rock was to build a wood fire against the face, heat the rock through and then pour water on the heated ore-
Jan 1, 1988
-
The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)
Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p
Jan 1, 1988
-
Thoeretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas
By Sharpin PC
The countercurrent gas-solid-heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temp-erature distribut
Jan 1, 1963
-
The Design and Operation of Heavy Medium Recovery Circuits for Improved Medium Recovery
In dense medium processes for the beneficiation of minerals the consumption of medium (generally ferrosilicon) represents a major component of the operating cost. This provides a strong incentive
Jan 1, 1987
-
The Physico-Chemical Basis of Pyrometallurgical Processes
A critical appraisal of the wide variety of processes used in the pyrometallurgical production of metals and non-metals shows that there is a strong physico-chemical and, in particular thermodynam
Jan 1, 1987
-
Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, Queensland
By Ward B
Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in
Jan 1, 1986
-
Gas Phase Sulphation of Nickel Laterite Ores
By Rankin W. J
Increasing concern with the emission of sulphur dioxide from smelters and roasters has caused renewed interest in processes which can use waste sulphur dioxide, such as the sulphation of nickel late
Jan 1, 1996
-
Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia
Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis
Jan 1, 1997
-
A Survey of Current Approaches to The Optimum Ultimate Open-Pit Planning Problem
By Caelli T, Robey M
Most research into planning of open pit mines has been based on evaluation of volume-element block models in terms of their net present value. The major issues revolve around two interdependent proble
Jan 1, 1996
-
Rb-Sr and Pb Isotope Data from the Northampton Block, Western Australia
By Blockley J. G, Laeter J. R
The history of the Ph-Cu-Zn mineralisation in the orthampton Block of Western Australia has been further investigated. It was hoped that (1) Rh-Sr studies on partially-remelled granulites, wall-rocks
Jan 1, 1985