Technical Note-Tin Removal from Imperial Smelting Furnace Lead Bullion by Oxidation
By Bruce See J
Oxidation of artificial Imperial Smelting Furnace lead bullion was performed during cooling between 1180 and 820°C in order to attempt to produce a tin-rich dross.The addition of sodium carbonate
Jan 1, 1987
-
Uranium Ore Deposit at Mary Kathleen
By Munro DL
The Mary Kathleen uranium deposit is in north-west Queensland, approximately halfway between the townships of Mount Isa and Cloncurry, at long. 1400 009 E and lat. 200 44' S. The deposit Iwas d
Jan 1, 1968
-
Some Notes on Carbide Tipped Rock Drill Bits
For several decades miners have been obliged to maintain a vast supply of sharp steels at the working face to meet the hungry needs of rock-drills. In medium and large size mines this has meant the se
Jan 1, 1948
-
Analysis of Concentrate Operations at Mount Lyell
By Weller K. R, Trahar W. J
The Mount Lyell Company treats some 2.3 million tonnes of ore annually, mined from a number of orebodies on the field. Blended ore is essentially a quartz-sericite schist containing about eight per
Jan 1, 1977
-
The Development and Application of the Jameson Cell
By Riches N, Harbort G
The Jameson flotation cell was developed jointly by Mount Isa Mines Limited and Professor GJ Jameson of the University of Newcastle. The cell has been used in a number of cleaning applications within
Jan 1, 1991
-
Geology of the Southern Part of the Riwaka Complex and Comments on Techniques Used During Exploration for Copper and Nickel There
The discovery of copper and nickel sulphides in the Riwaka Complex in 1967 led to considerable exploration activity by a number of companies. Various exploration techniques used by these companies are
Jan 1, 1977
-
The Basement Contact Zone at Mount Isa - Its Impact on Rock Mechanics and Mine Design Philisophy
By Struthers M. A
The basement contact zone, a major fault structure underlying the copper orebodies at Mount Isa, has a significant influence on orebody extraction. The zone is comprised of a variety of weak, barren l
Jan 1, 1990
-
Principles of Coal Preparation
The first stage in process design for coal preparation is a study of the coal seam and its associated features followed by an examination of the mining method to.be employed and the coal market requi
Jan 1, 1975
-
Theory and Technique of Ground and Aerial Photography for Geological Mapping of Strip Mine Highwalls
Routine, in-pit geological mapping of highwall at Central Queensland Coal Associates (C.O.C.A.) deep strip mines has proved too slow for the increasingly greater highwall lengths which require mapp
Jan 1, 1981
-
Rehabilitation Planning For The Yallourn East Field
By Brown K, Francis D
The Yallourn Open Cut Mine has recently commenced mining operations in the new East Field which will supply the 1450MW Yallourn W Power Station for the rest of its 30 year design life. The authors des
Jan 1, 1992
-
Properties of Bricks Containing Coalwash
In comparisons of a trial extruded brick containing 33 per cent coalwash and 67 per cent clay and a trial pressed brick containing 100 per cent coalwash with a standard extruded clay face brick, the m
Jan 1, 1992
-
Oxygen Requirements and Monitoring for Gold Ore Processing
By Komosa T, Muir D. M
Adequate levels of dissolved oxygen are essential for efficient gold dissolu- tion. The actual levels in plantpuips can be seriously reduced by the presence of oxygen consuming reactive minerals, and
Jan 1, 1991
-
Pit Wall Design Implementation at Mt Whaleback Open Pit Mine, Newman, Western Australia
By Wagland D. G, Guo H
The Mt Whaleback orebody is in a complex geological regime. A good understanding of geological structure is essential during the design and implementation stages. The amount of information on the ro
Jan 1, 1995
-
A Computer Model for Vacuum Filter Operatin
Mathematical modelling of continuous rotary vacuum filtration has been limited by the wide range of variables and the absence of connecting equations linking the variables. The filter type and size
Jan 1, 1989
-
Geophysics of the Honeymoon Well Nickel Deposits, Western Australia
The Honeymoon Well nickel sulphide deposits are located in the Agnew-Wiluna greenstone belt, about 45 km south of Wiluna. Both disseminated and massive sulphide nickel deposits are hosted by komati
Jan 1, 1996
-
Power Supply for Resource Projects (8ecc30a6-60bd-418c-872d-5915924f6785)
The provision of electrical power is an important consideration in project development. The first step to be taken in this area is to assess the power requirements of the project. The alternatives of
Jan 1, 1990
-
Environmental Classical Accretionary Prism, Hikurangi Convergent Margin, New Zealand
By Davey FJ
The Hikurangi Margin of eastern North Island New Zealand represents the feather edge of the over-riding Indo-Australian Plate at its convergent boundary with the subducting Pacific Plate. Towards
Jan 1, 1987
-
The Contribution of Competent Mine Geologists to Exploration
Mine geologists have access to an economic mineral deposit, production parameters and secure exploitation title. They are well placed to understand ore formation and should contribute to the effectiv
Jan 1, 1997
-
Dephosphorisation of Stainless Steel Using BaCO3 - CaO - BaCl2 - Fe2O3 Fluxes
By Vilela A. C F
In the present work, the process of dephosphorisation of stainless steel was developed in laboratory scale by adopting a high frequence induction furnace, using BaCO3 base flux. By using BaCO3 - CaO
Jan 1, 1991
-
Circum-Pacific Porphyry Copper, Gold and Molybdenum Deposits
By P Hollings, J Holliday
Porphyry copper, gold and molybdenum deposits form in subduction-related settings in association with calc-alkalic or alkalic magmatism. Hydrothermal alteration assemblages are zoned, with potassic co
Jan 1, 2008