    Sealing of Fissured-Porous Rock during the Construction of Mine Shafts

    Seven papers included in Session 8 of the Third International Mine Water Congress under the heading "Achievements in Mine Water Management & Research" have been reviewed. Only one paper, a case stud

    Jan 1, 1988

  • AUSIMM
    Case Study - NWT Diamonds Project

    By Penny T. G

    BHP Diamonds and their joint-venture participants DiaMet Minerals, Chuck Fipke and Stewart Blusson are currently developing Canada's first commercial diamond mine in the arctic barren lands of

    Jan 1, 1997

  • AUSIMM
    Mining The Thick Seams Of The South Maitland Coalfield, N.S.W.

    The thick coal seams of the South Maitland field are the only ones in New South Wales which have been worked extensively to heights beyond 3.8 m (nominal "thin" seam height). Under shallow cover o

    Jan 1, 1976

  • AUSIMM
    TodayÆs Mine Manager ù Technical Expert or Business Guru?

    The mine manager is one of the oldest jobs in the world. Over many centuries the fundamentals of how this job was approached did not change much. However since the later part of the 1980s there has be

    Jan 1, 2006

  • AUSIMM
    Treatment of Mary Kathleen Uranium Ore û A Review

    A paper describing the treatment of the Mary Kathleen uranium ores must necessarily be historical and confined mainly to a review of the four papers which have already appeared. Couche and Hartley

    Jan 1, 1968

  • AUSIMM
    The Evolution of Cut and Fill Mining at Isa Mine

    By Wright J

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Planning and Commencement of Rehabilitation at the Hedges Gold Mine WA

    Environmental impact and rehabilitation on completion are primary considerations in obtaining approval for mine projects from government authorities.This paper focuses on the planning and commencement

    Jan 1, 1992

  • AUSIMM
    The Structural and Hydrodynamic Framework for Epithermal Exploration

    By M A. Etheridge

    The evolution of economic precious metal and copper-gold deposits in high-level igneous terranes is dependent on very efficient fluid focussing. This is most readily achieved by contemporaneous deform

    Jan 1, 1995

  • AUSIMM
    A Continuous Oxygen Probe for Non-Ferrous Smelting Slags

    By Flloyd J. M

    A continuous oxygen probe,incorporating a SIRO2 solid electrolyte oxygen sensor which measured the oxygen potential of a small volume of gas enclosed above the melt's surface,was constructed

    Jan 1, 1987

  • AUSIMM
    Contribution to the Study of the Mount Isa Copper Orebodies

    An investigation was made into the mineralogical characteristics of the upper portions of the 650 and 750 copper lodes. The investigation was based on a comprehensive suite of geological specimens rep

    Jan 1, 1961

  • AUSIMM
    Thermal Analysis of Zinc Sulphide Concentrates and its Relevance to Zinc-Lead Sintering

    By Firkin GR, Allen RJ

    Sulphide Corporation Pty. Limited has roasted a number of different zinc sulphide concentrates on its sinter machine which pro- duces zinc-lead sinter for an Imperial Smelting Furnace, and results h

    Jan 1, 1975

  • AUSIMM
    Modelling of the Ventilation System of a Deep Uranium Mine

    By S C. Bhowmik, R Gupta

    This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The

    Jan 1, 2005

  • AUSIMM
    The Ore-Coke Interface-Mixed Ore Results

    By Boehme PW, Gregory OR

    The results presented here show quite definitely that in the system investigated the intensity of dispersion is enhanced by switching the flow entry from bottom to sides of the packed trough. Since

    Jan 1, 1975

  • AUSIMM
    Design and Construction of No. 2 Residue Dam at Rosebery

    By West Coast Staff

    Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic

    Jan 1, 1958

  • AUSIMM
    The System of Costs Keeping at The Broken Hill Junction North Mine.

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1911

  • AUSIMM
    The OK Tedi Project

    Ok Tedi Mining Limited commenced construction in mid-1981 of facilities and infrastructure to mine and process gold ore at Mt Fubilan in Papua ew Guinea. Production ofgold began more or less on schedu

    Jan 1, 1985

  • AUSIMM
    Stress Corrosion Cracking of Rock Bolts

    This paper outlines the mechanism of Stress Corrosion Cracking (SCC) and how it can cause premature failure of rock bolts. SCC occurs due to the progressive development and growth of cracks in the sur

    Jan 1, 1998

  • AUSIMM
    The Allied Minerals N.L. Heavy Mineral Sand Deposit at Eneabba, Western Australia

    By Oxenford R. J

    An important rutile-ilmenite-zircon bearing sand deposit was discovered by local farmers at Eneabba, 300 km by road north of Perth in 1970. These heavy minerals occur in a series of ancient strandl

    Jan 1, 1973

  • AUSIMM
    Sirosmelt-The First Ten Years

    By Conochie DS

    SIROSMELT is a successful new pyrometallurgi- cal furnace system using a top-entry lance which can be submerged in both slag and matte. The lance is of simple construction, and is cooled by process

    Jan 1, 1984

  • AUSIMM
    PITOPTIM: A New High Speed Network Flow Technique for Optimum Pit Design Facilitating Rapid Sensitivity Analysis

    By Carras S, Kelsey P, Caccetta L

    An important problem in open pit mine planning is that of detennining the optimum ultimate pit limits of the mine. These limits are that contour which is the result of extracting the volume of materia

    Jan 1, 1991