Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Precision Surface Mining - Choosing the Best Tool for the Job
Precision surface mining is increasingly occupying a significant role in open pit mining. Improvements in technology now allow continuous surface mining of material well above 140 MPa (20 300 psi) eff
Dec 6, 2010
-
Hydrological Environments for Vein Mineralisation in the Hauraki Goldfield, New Zealand
The epithermal Au-Ag deposits of the Hauraki Goldfield have formed in the convergent plate margin setting of the Coromandel Volcanic Zone (CVZ). The deposits form as siliceous lodes in the upper parts
Jan 1, 1991
-
The Effect of Bulk Iron Concentration on the Copper Activation of Sphalerite at pH 9
The Effect of Bulk Iron Concentration on the Copper Activation of Sphalerite at pH 9
Sep 13, 2010
-
Photostructural Detection of Concealed Cleat and Faults Influencing Coal Mine Planning
Coal cleat and faulting influence failure, gas release, and choice of preferred mining directions, locations, and sequences. Unfortunately soil and younger rock cover restrict direct mapping of these
Jan 1, 1979
-
The McArthur Lead-Zinc-Silver Deposit
By S Jephcott
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralised bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1971
-
Gas reservoir and emission modelling to evaluate gas drainage to control tailgate gas concentration and fugitive emissions
By D J. Black
The process of longwall coal extraction coal causes fractures in the overlying and underlying strata and these fractures become pathways for gas released from adjacent coal seams to flow into the mine
Aug 28, 2017
-
Land Reclamation Trials and Practices at Martha Hill Gold Mine, Waihi, New Zealand
By P E. H Gregg, R B. Stewart
Reclamation field trials commenced in 1985, two years before the granting of the Mining Licence. The level of pasture production on varying soil depths (0 cm, 5 cm, 15 cm and 25 cm) overlying both tai
Jan 1, 1995
-
Upgrading of Iron Ores by Wet High Intensity Magnetic Separation (WHIMS)
By Misra V. N, Cheng C. Y
Two types of Mt Tom Price hematite iron ore from Hamersley Iron P/L were tested using a Humboldt Wedag Jones P40 wet high intensity magnetic separator (WHIMS). The parameters tested were magnetic i
Jan 1, 1999
-
Quartz Vein Styles in Turbidite-hosted Mesothermal Gold Deposits of Western South Island (New Zealand), Victoria (Australia) and Nova Scotia (Canada)
By P K. Smith, R J. Ryan, W R. H Ramsay, D C. Arne, F P. Bierlein
Turbidite-hosted, mesothermal lode gold deposits in Paleozoic metasedimentary rocks of the Buller Terrane, western South Island have a similar geological history and genesis to the Paleozoic lode gold
Jan 1, 1999
-
Pitfalls in Vezin sampling for finely crushed materials
By C J. Kruger, E le Roux
Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,
May 9, 2017
-
Optical image analysis of iron ore pellets and lumps using CSIRO software Mineral/Recognition
By S Hapugoda, A Poliakov, E Donskoi, L Lu
A significant amount of metallic iron in the world is produced in blast furnaces from iron ore pellets. To control the quality of pellets and to optimise pellet production, characterisation of both gr
Jul 24, 2017
-
Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment
By A Kemp, I Taylor, S C. Lamoureux
Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo
Jul 24, 2017
-
The Application of Operations Research to Some Technical and Management Problems
ABSTRACTOperations Research and associated techniques have wide application in the Mining Industry and have been used in Mount Isa since 1961.Typical of the projects undertaken by the OperatIons Resea
Jan 1, 1968
-
The Application of Magnetic Assessment to Ironsands Production
By A J. Falconer
Two magnetic parameters are proposed as a basis for the assessment of ironsands beneficiation. The parameters are determined for raw sand prior to dredging and for magnetic separator head feed over a
Jan 1, 1980
-
E26 Lift 1 North block cave development and construction
By R Cunningham
The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared
Mar 29, 2023
-
The North Lyell Tunnel, Tasmania
THIS tunnel, which is an adit 7000 ft. long, was undertaken by the Mount Lyell Mining and Railway Company Limited to connect its treatment works with the North Lyell mine at depth, with a view to effe
Jan 1, 1929
-
The San Cristobal Gold District, Antofagasta, Chile
By S Kasaneva
TheSan Cristobal gold district is located 110 km east of the port of Antofagasta, Chile. It contains the San Cristobal gold mine, where Niugini Mining Ltd. commenced a heap leach operation, with initi
Jan 1, 1995
-
Gold Mineralisation at Porgera, Papua New Guinea
The Porgera gold deposit is an epithermal gold base-metal deposit located in the Enga Province of Papua New Guinea. Gold-silver-sphalerite-galena-pyrite mineralisation is related to stocks and dykes o
Jan 1, 1980
-
New Zealand as an Exploration Destination: 2000 Update
This paper provides an update to a paper by the author on an overseas explorer's perception of New Zealand, presented at the 1997 New Zealand Minerals & Mining Conference. New Zealand has one
Jan 1, 2000
-
Planning Disposal of Mine Wastes in New Zealand
The main factors which influence disposal of mine waste under New Zealand conditions are identified and discussed: namely, geological conditions which produce soft weather-sensitive waste, wet and col
Jan 1, 1986