Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • CIM
    South African Progress on closing the Design Gap between high- and Low-Aspect SAG mills

    By Malcolm Powell

    "The argument has long raged across the oceans as to what the best AG/SAG mill aspect ratio is. The North American practice of a high aspect ratio of two, diameter twice length, through to the South A

    Jan 1, 2002

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • CIM
    Everybody Needs Us Nobody Wants Us

    By Ray Collier

    MINING TODAY l EXTENSIVE AND EXPENSIVE PERMITTING PROCESSES WITH UNKNOWN RESULTS l GENERAL AND IMPASSIONED RESISTANCE TO RESOURCE BASED INDUSTRY l SOPHISTICATED, ORGANISED, AND WELL FUNDED OPPOS

    May 1, 2002

  • CIM
    Heavy Mineral Survey of the Syrian Beach Sands, South of Tartous: Their Nature, Distribution and Potential

    By Bassam Kattaa

    "Abstract - A heavy mineral survey of beach and dune sands including geochemical analysis for trace elements was undertaken to evaluate the economic potential of the sands and to understand the nature

    Jan 1, 2002

  • CIM
    A Contribution for the Improvement of a Rotary Sample Divider for Iron Ore Concentrates Sampling.

    By M. Poirier, J. H. Mbouche

    "The research question of the present work is the following: at which speed should a rotary sample divider operate in order to produce representative samples of iron ore concentrate? In order to solve

    Jan 1, 2016

  • CIM
    Frobisher's gold on Kodlunarn Island - fact or fable?

    By John Loop, W. A. Gibbins, Donald D. Hogarth

    "Introduction Background The Frobisher voyages of 1577 and 1578 were organized by the Cathay Company for the express purpose of finding and mining gold ore. Since publication of the Baffm expedition o

    Jan 1, 1999

  • CIM
    Entrapment and Flotation of Matte in Molten Slags

    By R. Minto, W. G. Davenport

    The slag removed from the reverberatory furnaces of copper smelters contains significant copper values. A serious financial loss is involved, as further recovery operations are not normally carried ou

    Jan 1, 1972

  • CIM
    Meeting the Transportable Moisture Limit for Lead Concentrates

    By H. P. Jacobi

    "INTRODUCTIONPine Point Mines, operated by Cominco Ltd., is located approximately 65 miles east of Hay River, N.W.T. on the south shore of Great Slave Lake.The milling operation started in the fall of

    Jan 1, 1975

  • CIM
    Linking Flotation Efficiency to Bubble Size

    By Jose R. Hernandez-Aguilar

    "This paper revisits data from previous studies (Hernandez-Aguilar, 2010, 2011) to better understand the link between metallurgical performance and pulp-zone bubble size (Db) in full-scale flotation s

    Jan 1, 2017

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • CIM
    Abattage Longs Trous À La Mine Géant Dormant

    By Christian Bourcier

    La méthode d?exploitation traditionnelle de la mine est le chantier chambre-magasin. Cependant, lors de l?exploitation d?un chantier, nous avons été confrontés à un problème de soutirage. Le minerai a

    Oct 1, 2001

  • CIM
    Canada Tungsten ? Change to Underground Mining & Description of Mine-Mill Procedures

    By W. W. Cummings

    Canada's only current tungsten producer started up in 1962 with a small open-pit mine on the Flat River , 180 air miles north of Watson Lake, Yukon Territory. The orebody was in a contact-metamor

    Jan 1, 1977

  • CIM
    State of Leadership in the Mining Industry and Why Leadership Matters

    By Scott Martin

    This paper will discuss the challenges currently facing the mining industry. By sharing experiences gained in the CIM Leading in Mining Course, I will highlight what’s working, what’s not, what are th

    Jan 1, 2014

  • CIM
    Use of LCA in the Mining Industry and Research Challenges

    By Pascal Lesagel

    Life Cycle Assessment (LCA) is a holistic environmental assessment tool that allows the compilation and evaluation of the inputs, outputs, and potential environmental impacts of a product or service t

    Nov 1, 2008

  • CIM
    Autoguided Vehicles in a Production Environment

    By Fabien Miller

    Automation technologies are increasingly envisaged to improve underground mining productivity. However, the technologies need to be used and adopted gradually in order to get the best benefits. This p

    May 1, 2002

  • CIM
    Improving Flotation Plant Performance at Cadia by Controlling and Optimizing the Rate of Froth Recovery using Outokumpu Froth master™

    By Peter Bourke, Marc van Olst, Seppo Ronkainen, Natalie Brown

    "Since the early days of flotation, process technicians have known that the speed at which the froth is recovered over the lip of the cell has a very direct and consistent influence on the grade and r

    Jan 1, 2001

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test

    By A. G. Doll

    The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral e

    Jan 1, 2012