Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Metallurgical Test Program For Fission Uranium Corp.’s Triple R Uranium Deposit
By Lawrence Melis
Fission Uranium Corp.’s Triple R Uranium Deposit at its Patterson Lake South Project is located in northwest Saskatchewan in Canada’s Athabasca Basin. As part of pre-feasibility studies for the projec
Jan 1, 2020
-
Recovery of Zinc, Manganese and Lead from Pyrometallurgical Sludge by Hydrometallurgical Processing
By J. -F. Blais, M. -O. Simonnot, P. Charbonnier, J. Mocellin, Université de Lorraine INRA, G. Mercier
"Huge amounts of air pollution scrubber sludge have been generated during ferromanganese production using blast furnace. These residues have been historically deposited in ponds near steel making plan
Jan 1, 2016
-
Teck's Exploration Approach in Eastern Canada (01b063c0-d37f-411e-9013-d5f81d641632)
By Barry D. Simmons
"A well-defined approach is essential to ensure the long-term success of a regional exploration program. Teck's approach in eastern Canada is designed to fulfill corporate objectives while recogn
Jan 1, 1992
-
Hydrocyclone Classification Modeling for Gold Ore Grinding Circuit Simulation
By M. R. Khalesi, S. Bellec, C. Bazin, D. Hodouin
This paper proposes a classification model to predict the split coefficient of gold ore particles as a function of the particle size and gold content. The model is calibrated and validated using data
Jan 1, 2011
-
The Geological Setting of the Upper Beaver Mine, Kirkland Lake District, Ontario: A Copper-Gold Deposit in Mafic Volcanic Rocks
By John H. Morris, R. Gwilym Roberts
"The Upper Beaver Mine, Kirkland Lake, Ontario, is a copper-gold deposit in mafic flows and sedimentary rocks. The deposit consists of a number of orebodies of two types: copper- and gold-bearing chal
Jan 1, 1982
-
The Behaviour of As(III) and As(V) During the Precipitation of Alunite at 98°C
By J. E. Dutrizac, Alba Sunyer
The factors affecting the precipitation of arsenic-free alunite (KAl3(SO4)2(OH)6) were investigated in a series of laboratory experiments. Although the amount of alunite precipitated increased with in
Jan 1, 2011
-
Tailings dam failures need not be disasters — The Thickened Tailings Disposal (TTD) system
By E. I. Robinsky
"In light of the recurring spills and failures of conventional tailings disposal pond dams, a brief review of the Thickened Tailings Disposal (TTD) system is presented. It is shown that by the process
Jan 1, 1999
-
New Afton Mine: Blasting Improvements
By Tyler Roberts
New Afton mine is an 11,000 tonne per day block caving operation, located 8 km west of the city of Kamloops, British Columbia. Due to the nature of block caving and the weak rock mass at New Afton, th
Aug 1, 2013
-
The Ecstall Story: The Open-Pit Mine
By George C. Coupland
"THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc
Jan 1, 1974
-
Employee assistance programs for hourly and salaried employees
By K. MacMaster
"This paper deals with the history, development, present and future of the Employee Assistance Programs in place at the Inco Ltd. operations in Thompson, Manitoba. It should be noted that, although ma
Jan 1, 1989
-
Development of a simple segregation program to manage potentially acid generating waste rock at the Keystone Gold Mine, Manitoba
By D. H. Flather, J. W. Hendry, K. Drover
Black Hawk Mining Inc. has completed a comprehensive program on the prediction and management of acid rock drainage (ARD) at their Keystone Gold Mine (Keystone) near Lynn Lake, Manitoba. The program,
Jan 1, 2000
-
Electrochemical Study of Gold Cyanidation in the Presence of Roasted Gold Ore and its Associated Oxide Minerals
By E. Ghali, A. D. Bas
"Treatment of oxide, e.g. roasted gold ores has received relatively less attention than sulphidic ones and recently, handling of oxide gold ores is becoming essential. In this study, the influence of
Jan 1, 2016
-
Industry – A hard act to follow
By Mark Hollingworth
"There is general consensus that as the world continues to change at an ever-increasing pace, companies must continually adapt their operations in order to remain competitive. Those that change fast e
Jan 1, 1996
-
Effect of Mining on Deformation Patterns in a Large Open Pit Rock Slope
By A. K. Alzo?ubi
Block toppling in natural rock slopes has been under investigation since the 1970?s. De Freitas and Watters (1973) introduced the term ?toppling? to describe the movements of rock slopes by rotation i
Jun 1, 2012
-
Transformer PCB management
By K. Heid
"Although concentrated efforts have been made to deplete PCB transformers from the Canadian environment, numerous transformers (as well as ballasts, capacitors and magnets) continue to exist throughou
Jan 1, 1998
-
From Theory to Practice: How Designing for Situation Awareness can Transform Confusing, Overloaded Shovel Operator Interfaces, Reduce Costs, and Increase Safety
By E. Onal
Mining operators are faced with complex information delivered by technology-centric rather than user-centric systems. The ability to achieve high situation awareness (SA) in the face of this data over
Aug 1, 2013
-
Dynamic Biomechanical Simulation for Identifying Risk Factors for Work-Related Musculoskeletal Disorders During Construction Tasks
By J. Seo
We propose a dynamic biomechanical simulation method that uses motion capture to evaluate the risk of Work-related Musculoskeletal Disorders (WMSDs). Statistics show that WMSDs accounted for 33% of al
Aug 1, 2013
-
Protective coatings ? economic considerations for the mining industry
By D. D. Downing
This paper is a review of material selection considerations concerning protective coatings in the mining industry. The discussion will cover both capital-dollar projects and maintenance requirements.
Jan 1, 1979
-
Modification of the Sarcheshmeh Copper Complex Flotation Circuit in Response to a Reduction in Feed Grade
By S. Banisi, E. Arghavani, A. Akbari, Gh. A. Parsapour, S. Darvish Tafvizi
The new copper processing plant of the Sarcheshmeh copper complex consists of two parallel circuits. After a primary crushing, the ore is sent to a SAG mill and the product is further ground in a ball
Jan 1, 2016
-
Removal of Copper and Zinc from a Cobalt Electrolyte by Ion Exchange at Kamoto Copper Company’s Luilu Plant
By E. Hardwick, K. C. Sole, Y. Jurrius
"The Luilu cobalt plant at Kolwezi, Democratic Republic of Congo, has been operating since the late 1950s, using a conventional precipitation flowsheet for removal of impurities from the cobalt proces
Jan 1, 2014