Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Technology Selection for the Genesee Phase 3 Electricity Generating Station Expansion

    By Les Johnston

    _ BACKGROUND - About EPCOR - Genesee Generating Station - Phase 3 Expansion _ TECHNOLOGY SELECTION - Selection Criteria - Combustion Options - Flue Gas Emission Control Options _ STAKEHOLDER V

    May 1, 2002

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    Research into high density backfill placement methods by the Ontario Division of Inco Limited

    By B. Goard

    "IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between

    Jan 1, 1987

  • CIM
    Requirements for Underground Mine Backfill Monitoring

    By David O. DeGagné

    While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year

    May 1, 2001

  • CIM
    Progress in Aluminium Therapy

    By W. D. Robson

    THE prevention of silicosis by metallic aluminium has been reported by Denny, Robson, and Irwin in two papers. The first (1) was published in 1937; the second (2), in 1939. The results definitely esta

    Jan 1, 1944

  • CIM
    The Merelani Graphite-Tanzanite Deposit, Tanzania: An Exploration Case History

    By R. J. Chase, C. Davies

    "Abstract- The Merelani graphite-tanzanite deposit is located in northeast Tanzania, 14 kilometers south of Kilirnajaro International Airport and in close proximity to the towns of Moshi and Arusha .

    Jan 1, 1994

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Energy Management Assessments: Cost Effective Carbon Management

    By A. Taylor, E. Thorn Corthay, J. Farrell, L. A. Westfall, S. Borchardt

    Mining and metallurgical industries need to minimize their greenhouse gas (GHG) emissions; Hatch specializes in conducting mining and metallurgical energy management assessments and optimizing product

    Jan 1, 2010

  • CIM
    Publicity and the Mining Industry

    By C. M. Campbell

    Canadian newspapers from coast to coast, have been, for months, denouncing those articles entitled, "The Whisper of Death," which have been appearing in the Montreal Star. I have not read these articl

    Jan 1, 1923

  • CIM
    Computer assisted economic analysis to select a stoping method

    By R. R. Tatiya

    "The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining

    Jan 1, 1998

  • CIM
    Evolving Equipment Health, a Rio Tinto Case Study

    By Daniel D. M. Adams

    Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min

    May 1, 2011

  • CIM
    Characterization and Empirical Analysis of Block Caving Induced Surface Subsidence and Macro Deformations

    By K. Woo

    The increasing move to block cave mining methods (including sublevel and panel caving) to access deeper and lower grade ore deposits as near surface sources become exhausted raises questions as to the

    May 1, 2009

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • CIM
    A technique for the direct measurement of bubble size distributions in industrial flotation cells

    By J. A. Finch

    "A method of sampling and presenting bubbles for imaging for use in full-size flotation cells is described. The device (bubble viewer) comprises a tube attached to a sealed glass viewing chamber. The

    Jan 1, 2002

  • CIM
    Preserving the historical record of Canadian mining and metallurgy

    By Norman R. Ball

    "Many people in the mining and metallurgical industries were brought up to embrace Henry Ford's pronouncement that ""History is bunk"" but it is not generally known that the same Henry Ford creat

    Jan 1, 1999

  • CIM
    Embedding Sustainability into Environmental and Social Impact Assessments

    By Louise Pearce

    ?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope

    May 1, 2011

  • CIM
    Analysis of electrochemical noise data with phase space methods

    By A. J. Makoka, B. C. Qi

    Reliable monitoring of corrosion is vitally important in the combat against corrosion and over the last two decades the interpretation of electrochemical noise has received considerable attention as a

    Jan 1, 2005

  • CIM
    Reduced wear on mine car wheels in the Kiruna Mine

    By J. Eric Nylund

    "Intensive mechanization and automation in the LKAB, Kiruna Mine in Sweden have resulted in substantial rise in productivity and decrease in production cost. Capital investment in a modern mine today

    Jan 1, 1987

  • CIM
    Significant Strides Toward Ree Production in Canada

    By I. M. London, G. P. Hatch

    The Canadian Rare Earth Elements Network (CREEN) was formally launched at the Rare Earth Symposium at The Metallurgy and Materials Society of CIM (MetSoc) Conference of Metallurgists in October 2013.

    Jan 1, 2014

  • CIM
    An integrated hydraulic mining, selective agglomeration and hydraulic transportation process for Western Canadian coals - Part 1: Selective agglomeration of metallurgical coal in stirred tanks and in a pipeline loop

    By W. Pawlak, J. Janiak, C. Rodkiewicz, B. Ignasiak

    "There is a general consensus that, in order to widen the utilization of Western Canadian coals, a major effort must be devoted to their transportation, utilization of fines, beneficiation and mining

    Jan 1, 1986