Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine
By James W. Weaver
The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea
Jan 1, 2011
-
Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction
By Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2004
-
Confinement Of Two Contaminated Sites In A Petrochemical Plant; Case History
By Raffaella Granata
The paper deals with the remediation of two areas formerly utilized for the disposal of hazardous wastes in a petrochemical plant. The works, designed on the basis of the criteria of maximum safety an
Jan 1, 2006
-
Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)
By Helmut Hass, Marco Ziller
"Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a
Jan 1, 2014
-
Non-Destructive Testing Of Drilled Shafts - Title ? Table Of Contents - Introduction And Overview
By Edmund J. Cardoza
WELCOME TO THE DEEP FOUNDATIONS INSTITUTE 26TH ANNUAL CONFERENCE AND WELCOME ESPECIALLY TO THIS SEMINAR ON NON-DESTRUCTIVE TESTING OF DRILLED SHAFTS, PRESENTED BY MEMBERS OF THE DFI DRILLED SHAFT COMM
Jan 1, 2001
-
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair
By Richard Brink, Eric M. Klein, Kenneth B. Andromalos
"A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid
Jan 1, 2005
-
Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction
By Anthony H. Tawil
Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte
Jan 1, 1987
-
Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary
By John L. White
Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to
Jan 1, 1997
-
Reinforcement of Existing Deep Foundations with Micropiles
By Mauricio Terceros, Martin Achmus, Freddy Lopez
The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,
Jan 1, 2018
-
Securing Rail Infrastructure in Romania
By Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Secant Pile Walls - Design, Construction And Case History
By Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - Synopsis
By Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
The Use Of Micropiles In Estonia
By T. Ruben
Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.
Jan 1, 2000
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - Summary
By Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
Stabilization Of Organic Soil With The Limix System
By Magnus Ruin
The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met
Jan 1, 2001
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis
By N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Seismic and Lateral Load Design and Testing Guidelines
By Don Deardorff, Ke Yang, Yingcai Han, Ken Sorensen, Robert Kruger, Mark Petersen, Diane Fiorelli, Larry Goldfarb, Kathryn Petek, Kwabena Ofori-Awuah
Design of deep foundations for lateral loads requires an understanding of soil-foundation-structure response during loading. Lateral loads on a deep foundation (piles) could be due to earthquakes, win
Jan 1, 2012
-
Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics
By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume
"Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub
Jan 1, 2014
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La
By Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.
By P. M. Wiltcher
The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high
Jan 1, 2006