Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Jetting-Assisted Sheet Pile Driving

    By Marie-Pierre Bourdouxhe-Barnich

    Since 1997, in partnership with the Laboratoire Central des Ponts et Chaussées in Strasbourg, ProfilARBED has been carrying out a vast study to qualify the improvements jetting can make to vibratory d

    Jan 1, 2002

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Foundation Retrofitting Using Micropiles - A Case History

    By Mohammad Nasim

    Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a

    Jan 1, 2008

  • DFI
    "Comparative Pile Load Tests In Alluvial Sands" - I. Introduction

    By Lawrence F. Johnsen

    In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje

    Jan 1, 1993

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction (f1b0a5f2-b1b8-41d4-bbfb-fab6f395e7a0)

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2008

  • DFI
    You Can't Drive Piles Because Of The Vibration

    By Jerry A. Steding

    How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he

    Jan 1, 1988

  • DFI
    Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26

    By E. C. Demsky

    This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret

    Jan 1, 1989

  • DFI
    Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

    By T. Soejima

    In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me

    Jan 1, 2010

  • DFI
    Hydraulic Impact Pile Hammers ? Background

    By Patrick Bermingham

    The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes

    Jan 1, 1987

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    Effect Of Pressurized Drilling Methods On The Lateral Load Capacity Of Drilled Shafts - A Practical Insight And An Analytical Approach

    By Özgür Bezgin

    This paper presents observations on the installation of drilled shafts from two construction projects and an academic study with experimental and analytical parts. The construction projects involved t

    Jan 1, 2009

  • DFI
    Experimental Investigation Into The Stress And Strain Development Around A Displacement Pile

    By Jelke Dijkstra

    This paper presents the results of model pile load tests in a photoelastic material. The soil in this test is represented by an assembly of photoelastically sensitive glass particles, which allows for

    Jan 1, 2006

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • DFI
    Charles Grimes Bridge Foundations, Melbourne, Australia - Synopsis

    By Charles Pol Vuillier

    Piling work for modification to the Charles Grimes Bridge in Melbourne, Australia required piles to be installed through 15 to 20 m thickness of very soft to soft silty clay overlying 10 m of stiff cl

    Jan 1, 2000

  • DFI
    The Impact Of Vibro Compaction Adjacent To Large Vertical Maritime Retaining Structures

    By Barry C. Slocombe

    The development of new ports, extensions of existing facilities and reclamation of former docks will involve consideration of a variety of geotechnical problems. This paper presents data including in

    Jan 1, 2008

  • DFI
    The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? Synopsis

    By J. M. Pei

    In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se

    Jan 1, 2010

  • DFI
    Interlocking H-Sections For Cofferdams Resist High Pressure

    By Marc Dondelinger

    Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca

    Jan 1, 1985

  • DFI
    Supported Excavation Movement Causing Lateral Displacement and Cracks in Drilled Shafts - Lessons Learned from a Case Study in Chicago

    By Eric R. Borys, Amaneh E. Kenarsari, Brett Gitskin

    This case study discusses impacts of excessive Earth Retention System (ERS) lateral movement at a project in city of Chicago. The ERS (cantilevered sheeting) moved inward towards the excavation and ca

    Jan 1, 2018

  • DFI
    The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment

    By James E. Parkes

    The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station

    Jan 1, 2011