p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test Data
By Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Extra Deep Cut-Off at 250 m Depth - A Case Study
By Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway Embankment
By Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N
The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in
Nov 1, 2022
-
Author index
Abouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber
Jan 1, 1994
-
A Case Study, Design Change from Spread Footing to Drilled Shafts
By Drew M. Kurtz, Jeff L. Rai, Sara F. Frailey, Mohammad Ayub Iqbal
"This paper presents the foundation changes made for a five-span bridge over the Lehigh River constructed as a design-build project. During excavation within the cofferdam at Pier 2 for the constructi
Jan 1, 2016
-
Challenges and Lessons Learned from Shoring Design of 2nd / Broadway Metro Station
By Babak Mamaqani, Pirooz Barar
Regional Connector Transit Corridor (RCC) is part of the Los Angeles metro expansion project under construction which adds three new stations into the system. PB&A was responsible for the design of th
Jan 1, 2019
-
High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven Methods
By Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda
The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re
Oct 1, 2022
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls
By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Design of Grillage and Helical Pile Foundation for Limited Access Transmission Line
By Benjamin Jennings, Jason Herron
In the summer of 2016 Xcel Energy experienced a storm event that resulted in the collapse of approximately 8.5 miles of a 345 KV transmission line near Rogers, Minnesota. In design of the new transmis
Jan 1, 2017
-
Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles
By Venugopal Bonani, Kumaran M., Thomas John
Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a
Sep 1, 2022
-
FHWA Hollow Bar Soil Nail (HBSN) Test Program, A Summary
By Jesús E. Gómez
Verification and production testing of soil nails requires debonding the upper section of the soil nail to isolate the portion of the soil nail intended for testing within a specific ground type. In p
Jan 1, 2011
-
Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
By Aaron Evans, Chu E. Ho, Tom Richards
"This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet
Jan 1, 2016
-
A DC Electrical Resistivity Method for Jet Grouting Column Diameter Quality Control with Case Studies from Grand Paris Project
By Sina Z. Yekta, Zhangwei Ning, Pierre Frappin
This paper describes a DC (direct current) electrical resistivity method, which uses the contrasts in resistivity measurements to estimate the diameter of jet grouted columns as soon as they have been
Sep 8, 2021
-
Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction
By A. Paviani
The subject of this session is "Equipment Installation, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions
Jan 1, 1994
-
Slurry Wall Design for Construction Using Soil Structure Interaction
By Nino Catalano, Meeok Kim, Gordon Chen
"The design of the below grade structure of Brigham Building for the Future (BBF) included three different areas to provide power generation and medical facilities as well as a parking garage. The thr
Jan 1, 2017
-
The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability
By Kim Chan, Bryn Thomas, Ben Dening
"Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra
Jan 1, 2015
-
Low Overhead Secant Piles Drilled From Within A Shaft
By Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
Back Analysis of Field Instrumentation Results during Reclamation & Ground Improvement Works- A Case Study
By Prasanta Paul, Aminul Islam
"Nhava Sheva (India) Gateway Terminal Private Limited proposed to construct a container terminal yard, comprising a back-up area at Jawaharlal Nehru Port Terminal (JNPT), Uran, Maharashtra. The propos
Jan 1, 2015
-
Self Hardening Slurry Wall Installation By Hydromill At The Herbert Hoover Dike ? An Innovative Solution
By Mario Mauro
In 2007 the US Army Corps of Engineers classified the Herbert Hoover Dike in Florida as a Dam Safety Action Classification (DSAC) 1 dam, and started the implementation of one of the largest dam rehabi
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support
By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016