    Explosive Operations for Constructing a Tunnel Based PCB Collection System

    By Gerard McAlinden, Daniel Frost, Patrick McAlinden, James McAlinden

    In an effort to recover Polychlorinated biphenyls (PCB’s) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installatio

    Jan 1, 2010

  • ISEE
    Controur Control blasting in Soft Rock Excavation

    By W. Jiao, Y. Yongqi, R. Shan

    Soft rock mines are distributed through out P.R.C. And drilling and blasting is still the main method of driving a tunnel in these mines. Traditional smooth blasting has been widely and deeply studied

    Jan 1, 2000

  • ISEE
    SmokeFCM: Segmentation of Quarry Blast Smoke Plumes using Self-Adaptive Weighted Fuzzy C-Means

    By E. Lentilucci, A. Dey, X. Liu, A. Datta, S. Ghosh

    The segmentation of quarry blast smoke plumes is a crucial research area that has the potential to enhance safety, environmental monitoring, object detection, and regulatory compliance in the mining i

    Jan 1, 2024

  • ISEE
    Modeling Reactive Sulfide Rock at the Red Dog Mine

    By Norman Paley, Zachary Pickett

    The Red Dog Mine is a high-grade zinc-lead mine located in northwest Alaska which began operations in November 1989. In June 2014 the upper half of a charge in a trim shot in the Aqqaluk pit deflagrat

    Feb 1, 2020

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    The Effects of Various Wet-Hole Loading Methods on Powder Factor

    By Neal Lee

    Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,

    Jan 1, 2011

  • ISEE
    New Applications for Reflectorless Lasers in Drilling and Blasting

    By Cam Thomas

    "Reflectorless laser survey equipment has made it much easier to take accurate measurements toinaccessible locations in quarries, open pit mines and rock slopes. Prior to the introduction of thereflec

    Jan 1, 1999

  • ISEE
    The Influence of Primer Size on Explosive Performance (da0d94ac-a5fd-45ab-9b70-002ce6b6fb47)

    By Ian A. Niell, Alastair C. Torrance

    A joint research programme conducted by BHP Central Research Laboratories and Du Pont Wesfarmers Pty Ltd examined the effect of the size of cast primers on the run up and steady state detonation veloc

    Jan 1, 1990

  • ISEE
    A New Generation of Drilling at the Minntac Mine

    By Don Thompson

    The Minntac Mine drills and blasts approximately 75 million long tons of taconite per year. This requires drilling one million feet of 1 6-inch diameter holes. We are in the process of replacing our o

    Jan 1, 1998

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    Continuing blast optimization is the cornerstone of any mine-to-mill approach, and particle size analysis is a key metric for meeting blast targets to reduce overall energy consumption and operating c

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    Success in Advanced Blasting on the Basis of Sonicity -or- What a Blaster Should Know about Wave Dynamics in Rock!

    By H P. Rossmanith

    This contribution addresses the advanced blasting technology which is based on wave propagation theory and fracture mechanics. The new concept of sonicity and the principle of maximizing sonicity in b

    Jan 1, 2010

  • ISEE
    Improvement on the Fragmentation Results for Effect of the Reflective Planning Generated by the Pre-Split.

    By Jorge Cárdenas Miranda, Hector Espinoza

    Currently in open pit mining in Peru with double bench, it is a challenge to optimize fragmentation in the drill rows near to the slopes to ensure the performance in the loading and haulage operation

    Feb 6, 2023

  • ISEE
    Mine optimization using Total smart mining solution

    By Chanhwi Shin, Hyeongmin Kang

    Mine optimization is a key strategy in the mining industry that focuses on improving the efficiency, productivity, and sustainability of mining operations. To achieve mine optimization, digitalization

    Jan 21, 2025

  • ISEE
    Development and Blast Applications for Resolution Copper's No. 10 Shaft

    By Tom Goodell, James Cox, Scott Scovira

    Resolution Copper Mining is sinking a 6943 foot (2116 m) deep shaft to access and develop a new panel caving mine with approximately 1.6 billion known tons of porphyry copper resource. This mine will

    Jan 1, 2014

  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019