Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Considerations for Conveyor Belts in Tunneling Applications - NAT2022
By Ginger L. Hustrulid
Conveyor belts are a critical component in tunneling projects. This paper reviews current design considerations for conveyor belts. Rubber compounding differences to meet local fire resistance regulat
Dec 1, 2022
-
Acid/Base Sites On Mineral Filler Surfaces Determined By The Adsorption Of Probe Molecules (AIME)
By R. J. Pugh
In addition to directly analyzing the surfaces of minerals using high vacuum instrumentation methods, some important surface properties of mineral fillers can be determined indirectly by using reactiv
Jan 1, 1992
-
Open Pit Mine Production Scheduling with Stockpiling Using Constraint Programming
By Biswajit Samanta, Rahul Kumar, Pranjal Pathak
The Open Pit Mine Production Scheduling Problem (OPMPSP) is a complex optimization problem that seeks to determine the best sequence for extracting mineralized material from the ground in order to max
Jun 25, 2023
-
Alternative Reductive Bleaching Process For Kaolin
By E. S. Forbus
A process for producing reductive bleach in-situ in kaolin slurries has been developed. The bleach is formed by mixing an iron sponge powder (-325M) with slurry treated with SO2. The process has been
Jan 1, 1993
-
SAM's Corporate Sustainability Assessment: General Approach and Mineral Industries Specific Criteria and Examples
By S. Borner Schweizer
An overview over SAM’s approach to assess corporate sustainability performance illustrates how sustainability challenges are linked to trends, assessment criteria and finally company performance. This
Jan 1, 2005
-
Longwall Gateroad Stability Analysis Based on Field Monitoring and Bonded Block Modeling Results
By Zoheir Khademian, Gabriel S. Esterhuizen, Morgan Sears
Based on the 2010-2019 Mine Safety and Health Administration (MSHA) accident report database, 91% of reported ground control accident in the US longwall mines were caused by gateroad roof instability.
-
Utilization Of A Cross-Pit Bucket Wheel Excavator To Assist Reclamation
By J. L. Roll
The Surface Mining Control and Reclamation Act of 1977 (SMCRA) and the regulations promulgated for that "Act" have resulted in changes to surface mining operations in order to comply with the stringen
Jan 1, 1986
-
A Unique Computer Model For Coal Reserve Quantity And Quality Calculations
By George F. Swindle
This paper discusses a composite of two coal reserve studies, each of which made use of a computer-based modeling system to assist in an evaluation of multi-seam deposits. The model permitted simulta
Jan 1, 1983
-
The Nature and Stability of Precipitated Solids From Arsenopyrite Bio-Oxidation Effluents
By A. N. Islam, C. Simons, M. N. Hughes, J. Barrett
The effluent from the bio-oxidation of arsenopyrite contains high concentrations of iron(III) and arsenic(V), the pH being in the range 1.0-1.3. The use of lime to increase the pH causes the precipita
Jan 1, 1991
-
The New Look In The Syncrude Canada Tar Sands Project (338ced13-9538-499c-9f10-a35417d03c0b)
By F. K. Spragins
The growing demand and a diminishing supply of conventional crude oil in North America are bringing about an ever increasing interest in the so-called "synthetic fuels". With one commercial plant alre
Jan 1, 1972
-
The Acceleration Of Trackless Underground Ore Mining
By R. S. Shepard
The closing remarks of a paper which I presented at the annual AIME meeting at Dallas, Texas during February of 1963; contained a forecast of increased activity in trackless underground ore mining whi
Jan 1, 1967
-
Marta's Peachtree Center Station
By Elwyn H. King, Thomas R. Kuesel
I. CONCEPT MARTA's Peachtree Center Station is being mined out of hard rock, directly beneath Atlanta's central business district, with minimal surface disruption during construction. Its
Jan 1, 1979
-
An Analysis Of Wet Grinding Circuit Control Using Inferential Particle Size Measurement
By S. K. Kawatra
The use of inferential particle sizing for a closed wet grinding circuit control has been practiced for several years. This paper presents a review of some inferential sizing equations developed for p
Jan 1, 1982
-
Geologic Studies During The Development Of The Copper Flat Porphyry Deposit
By Peter G. Dunn
Geologic studies during development at Copper Flat were directed at acquiring the information necessary in evaluating a low-grade porphyry copper deposit. In addition to the geologic mapping and core-
Jan 1, 1981
-
Flotation Of Moylbdenum And Copper Minerals With Chromatographic Fractions Of Petroleum Distillate Products
By J. L. Huiatt
Kerosine, fuel oil No. 2, vapor oil, and fuel oil No. 6 were separated into general hydrocarbon fractions by ion exchange chromatography and adsorption chromatography. The collecting properties of the
Jan 1, 1972
-
M&E Research Symposium ? Mining Research in Progress
By Evan Just
?We are certain there is need for research in every phase of mining." This statement by R. M. Crump of the Jones and Laughlin Steel Company (047) paraphrases opinion widespread among mining people.
Jan 1, 1961
-
Selective Beneficiation for High-Loss-of-Ignition Fly Ash
By J. G. Groppo
A beneficiation process has been developed to provide selective separation of unburned carbon from high loss-of-ignition (LOI)fly ash. Using froth flotation to achieve selective separations requires
Jan 1, 1996
-
Monoalkyldithiocarbamates As Promoters For Copper Oxide And Carbonate Minerals
By M. F. Werneke
Flotation of the carbonate, oxide and silicate minerals of copper (malachite, azurite, chrysocolla) has been the subject of much research in recent years, but few effective solutions to this problem h
Jan 1, 1977
-
Reducing Respirable Dust Concentrations at Mineral-Processing Facilities Using Total Mill Ventilation System
By A. B. Cecala
The US Bureau of Mines has designed and evaluated total mill ventilation systems (TMVS) at two mineral-processing operations. Both systems have proven proficient at cost-effectively reducing respirab
Jan 1, 1995
-
The Kingston Project Nevada Goldfields' Initial Mining Operation
By A. E. Jack Swanson, Brian P. Micke
INTRODUCTION Nevada Goldfields began underground mining development at the Kingston Project in September, 1986, followed by mill start-up in March, 1987. The first gold pour in April followed thre
Jan 1, 1987