Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Concurrent Construction Of Two Side By Side Declines Utilizing An Atm-105 Road Header As The Primary Means Of Excavation
By A. J. Dudzik
In 2006 Arch Materials initiated the development of an underground limestone mining complex. The decision to proceed with the project was the end result of several years of market research and geologi
Jan 1, 2010
-
Uses and Specifications of Bauxite
By W. H. Andrews
DEFINITION OF BAUXITE The term "bauxite" (1) dates back to 1821, when it was assigned to a deposit of red earthy material outcropping near the village of Les Baux in Southern France. Chemical analy
Jan 1, 1984
-
Initial Numerical Exploration Of The Entry Flow Problem In The Analysis Of Hydrocyclone Fluid Dynamics
By A. B. Cortes
This research work discusses the development of a two-dimensional model that represents the flow that occurs in the inlet section of hydrocyclones. The governing equations are the two-dimensional, uns
Jan 1, 1995
-
Novel Solid-Phase Materials For Selective Copper Recovery (90140fc4-21aa-425a-ac35-136410d4e197)
By E. S. Peterson, M. K. Harrup, K. A. Dolbeare, J. E. Wey
Efficient methods for removal of copper from heap leach solutions without mobile organic phases are a current mining industry need. To satisfy this need a selective, high-capacity, durable solid mater
Jan 1, 2002
-
Subsidence Over Room and Pillar Mining
By W. M. Ma, Daniel W. H. Su, K. Centofanti, Yi Luo, W. L. Zhong, Syd S. Peng
8.1 INTRODUCTION Under room and pillar mining if the extraction ratio is low, (i.e., < 50%) a pillar can support the overburden without collapse and there will be no surface subsidence whatsoever. In
Jan 1, 1992
-
The Application Of Industrial Engineering In Coal Mining
By Charles W. Rountree
Industrial Engineering in the industrial world is a relatively new field, having been conceived about the turn' of the century by Frederick W. Taylor, who was not satisfied with the hit-or-miss m
Jan 1, 1958
-
Ground Treatment for Risk Mitigation during Tunnelling at the Port of Miami
By Roger Storry, Donald Bruce, Arnaud Hochart
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
New Development In The "In Situ" Testing Of Rocks
By K. F. Unrug
Extrapolation of the rock properties obtained from the cores exploration holes to the surrounding areas often causes problems because of frequent sudden changes in the geologic composition of strata.
Jan 1, 1999
-
Short History Of Man And Gold
By Thomas V. Mullen
Some 146 kt (4.69 billion oz) of gold have been mined throughout history. Of this, 70% has been mined in this century alone, with 17% produced from 1985 through 1996 (Fig. 1 and Table 1). Until the m
Jan 1, 1998
-
Montana Talc Co. details its successful entry into the talc business
By Frank W. Pereira
The Montana Talc ore body was discovered in 1983 in Montana's Gravelly Range, about 40 km (25 miles) south of Ennis. Initial drilling indicated a 910-kt (1-million st) ore body of high purity
Jan 1, 1989
-
Annual Review 1990 – Exploration 1990
By E. D. Attanasi
Exploration for non-fuel minerals has declined since 1988 as recessionary pressures have slowed growth in the industrialized economies. By most accounts, however, 1990 expenditures were still signific
Jan 1, 1991
-
Pilot Testing Of Column For Coarse Particles Flotation
By H. Soto
As a follow-up to a laboratory study, a pilot scale column for the flotation of coarse particles was designed and then tested in two different applications. In the first test, the concentration of a c
Jan 1, 1993
-
Evaluation of Blasting-Induced Ground Vibrations on Highwall Stability
By K. Perry, R. Eades
"Highwall miners continue to be implemented by operations to increase recovery, improve margins, and justify higher stripping ratios as high quality surface reserves become increasingly rare. Many tim
Jan 1, 2017
-
Errata (404675de-044f-46a1-a378-4f06623fc2de)
The following errors were inadvertently included in "How millisecond delay periods may enhance or reduce blast vibration effects" by R.M. Wheeler in the September issue of Mining Engineering.
Jan 1, 1987
-
Extraction of Lead, Zinc and Silver from River Bed Tailings BY FeCl3
By Yeonuk Choi, Patrick R. Taylor, Lyle Cunningham
Laboratory experiments have been performed to evaluate the potential for metal removal and recovery from river bed tailings by ferric chloride leaching. The lead, zinc, silver and other metals in the
Jan 1, 1992
-
Mitigation of the Environmental Impact from Mining Waste (MiMi) - A Swedish Multidisciplinary Research Programme
By Lars Olaf Höglund
MiMi has been set up to be i) visionary, ii) strategic and iii) long-term. The planning as well as the executive phases involves industry, academia and authorities in close co-operation. MiMi focuses
Jan 1, 2000
-
The Technical/Economic Evaluation Of The Physical/Chemical Demineralization Of Coal
By D. L. Kiser
Conventional and advanced coal preparation technologies were investigated through both a literature search and through direct contact with investigators and developers. In addition to a brief descript
Jan 1, 1986
-
Underwater Disposal Of Partially Weathered Pyritic Waste Rock - Surface And Pore Water Quality Impacts
By N. K. Davé
Water quality impacts of shallow water submersion of partially weathered and oxidized waste rock containing reactive sulphide minerals were investigated in laboratory column lysimeter studies. The was
Jan 1, 2006
-
Placer Sampling And Reserve Estimation
By D. E. Ranta, Stephen W. Thomas, Clancy J. Wendt
One of the most difficult tasks associated with placer mining is the sampling of the deposit. More placer projects have failed due to inaccurate assessment of the reserves than to any other reason. Wi
Jan 1, 1992
-
Tunneling Performance And Geotechnical Aspects Of Los Angeles Metro Rail Contract A-171
By Saied S. Navid, Michael A. Piepenburg, Richard F. Escandon, Robert C. Lindsay
INTRODUCTION Phase I of the Los Angeles Metro Rail Project, known as MOS-1 (Minimum Operable Segment-1), is the first phase of the 27 km± (17 mi) subway starter line. MOS-1 is currently under const
Jan 1, 1989