Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of the Coal Mining Roof Rating System in South African Collieries
This paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001
-
Towards A Method Of Determining Floor Quality In An Underground Coal Mine
By Jennifer Riefenberg
Underground coal mines often experience ground control problems related to weak floor. Developing a methodology for rating floor quality can aid in understanding and delineating ground hazards. U.S. B
Jan 1, 1995
-
Re-Use of Rectangular Bolted Roadways in a Cover Depth > 1000 M
By Klaus Opolony
The German coal industry operates a multi-seam extraction system, with average working depths currently around 1,000 meters. The gate roads serving the longwalls are often used for a second time - a p
Jan 1, 2002
-
A Computer Simulation Of Breakage Of The Main Roof In Longwall Mining
By Deren Zhu
Based on the results of field observation and physical model analyses, a computer simulation method, FEAEBP, has been developed for simulating the breakage of the main roof by considering it as a Kirc
Jan 1, 1988
-
The Impact Factors of Overburden Movement in Longwall Mining of Shallow Coal Seams
By Yang Li
For the study of overburden movement in longwall mining of shallow coal seams, most scholars merely consider the thickness of bedrock and top soils. In this paper, the overburden movement in longwall
Jan 1, 2014
-
Using Foaming Grout to Stabilize a Ventilation Raise in Very Poor Rock
By John Magyar
Special foamed cements were used to stabilize and secure caving ground in a newly-reamed 12.5-ft diameter underground ventilation raise. Two zones of very poor Rock Mass Rating (RMR) material were enc
Jan 1, 2005
-
Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber
By Xicai Gao
With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e
Jan 1, 2013
-
Analysis of Seismic Source Parameters of Roof Falls in Time and Space for Assessing Strata Stability by Microseismic Technique at Rajendra Longwall Coal Mine in India: A Case Study
By C. Srinivasan
Microseismic emissions are generated by deformation and cracking of rock around an opening inside a mine. The rock tends to achieve equilibrium in a new geometry under changing stress conditions was f
Jan 1, 2005
-
Application of New Void Detection Algorithm for Analysis of Feed Pressure and Rotation Pressure of Roof Bolters
By Eric Keller, Jamal Rostami, Wenpeng Liu
"Roof and rib instability is an important issue in underground mining. To optimize ground support design, enhance ground stability, and reduce the possibility of roof or rib failure with minimal use o
Jan 1, 2016
-
Roof Monitoring In Limestone Mines-Experience With The Roof Monitoring Safety System (RMSS)
By Thomas E. Marshall
During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun
Jan 1, 2000
-
Evaluation of Pillar Recovery in Southern West Virginia (0e64fb3d-0c07-4638-b455-a16004535ca1)
By Chris Mark
Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted duri
Jan 1, 2002
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian Coalfield
By David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)
By Wilfried Ufer
[1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl
Jan 1, 1984
-
An Engineering Analysis Of "Squeeze" Failure Of Pillars In The Pittsburgh Coal Bed
By George Mishra
In mid-1979, J&L Steel Corporation experienced rapid failure of pillars after only two weeks' operation with a combination of full retreat and partial mining in the 154 Road Section of its Nemaco
Jan 1, 1981
-
Three-Dimensional Simulations Of The Roof Behavior In Coal Room And Pillar Panels
By Andre Vervoort
The roof in coal room and pillar panels is normally stratified and can be thought of as beams or plates supported by the pillar sides in the roadways and by pillar corners in the intersections Undergr
Jan 1, 2000
-
A Step Towards Understanding The Behaviour Of Wider Roadways In South African Collieries
By George B. Quaye
Conventionally, roadways in South African collieries are 6 to 7 m wide. This dimension is chosen so as to allow maneuvrability of appropriate mine machinery and equipment, to meet production requireme
Jan 1, 2001
-
Application Of Tailing Sand And Water As Backfill Material In Metal Mines (1992)
By Sun Henghu
This paper analyses problems associated with cement based technique in metal mines, and provides a new mining technique of packing the tailing sand and water into solidified material. In the new techn
Jan 1, 1992
-
Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)
By Pier Paolo Manca
The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T
Jan 1, 1999
-
Utilization of Ground-Penetrating Radar to Determine Roof Competency in Underground Limestone Mines
By Tim Ross
J. M. Huber Corporation's Quincey Mine. an underground limestone mine located near Quincy. Illinois, has operated successfully and safely for many years utilizing roof bolts on a very limited bas
Jan 1, 2002
-
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA Method
By Hideki Shimada
A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages
Jan 1, 2001