Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine
By Trevor Yeomans, David Yaschyshyn
"Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini
Jan 1, 2001
-
Technical Note - Use of a microcomputer in the design and selection of materials hoisting systems
By J. D. Patsey, G. T. Lineberry
Introduction A computer program was developed for analyzing drum-type hoists before modifying an existing system or designing a new one. Its use permits the preliminary evaluation of a system before
Jan 2, 1987
-
Flood Prevention In Anthracite Mines, Western Middle And Southern Fields - Anthracite Region Of Pennsylvania - Project No. 2 - Summary
By S. H. Ash
THIS REPORT covers the second in a series of five projects into which the Conowingo tunnel system has been divided for geographical and practical reasons. It outlines the construction work contemplate
Jan 1, 1955
-
Contract Versus Owner Mining ù An Update on Australasian Open Pit Mining Practice
With the advent of the resources boom in the late 1960s most of the larger scale resources projects in Australasia were commissioned on an æowner miningÆ basis, where the mine owners owned and operate
Jan 1, 2002
-
Two Tunnels in Totally Different Geological Formations Driven by the Same 7M Double-Shield TBM with an Extremely Thin-Walled Monoshell Honeycomb Segmental Lining System
By Wolfgang Guetter, Wolfgang Weber
The upgrading project for two hydropower plants in Slovenia, Europe, requires two new pressure tunnels: Plave II (5.9 km Flysch) and Doblar II (3.6 km Limestone). It is the worldwide largest applicati
Jan 1, 2001
-
RI 5257 Carbonizing Properties Of Harlan County, Ky., Coals ? Introduction
By D. E. Wolfson
As a part of its overall program of coal carbonization, the Bureau of Mines is studying the coking properties of coals that may be used for metallurgical purposes. The objectives of this study were gi
Jan 1, 1956
-
Recent research directions at CANMET’s Cape Breton Coal Research Laboratory
By David J. Forrester
"CANMET’s research into underground coal mining is primarily conducted at the Cape Breton Coal Research Laboratory (CBCRL), established in 1981 to conduct safety research in underground coal mines. Lo
Jan 1, 1996
-
Battery Grade Manganese Dioxide From Risdon Anode Mud
A process was developed to produce electrolytic manganese dioxide, suitable for use in high quality dry cells, from Risdon anode mud. ImpurItIes present In the anode mud were removed prior to the elec
Jan 1, 1968
-
The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency
By Robert E. McIvor
"The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci
Jan 1, 2009
-
MLA 45-82 - Mineral Resources Of The Square Butte Instant Wilderness Study Area, Choutlau County, Montana ? Summary Statement
By Charles E. Larson
Square Butte has no history of mineral development or production. Surface mapping, radiometric surveys and chemical analyses of rock samples reveal no mineral potential. The area has a speculative pot
Jan 1, 1982
-
Evaluation Of Achievable Column Diameter In Jet Grouting
By Chu E. Ho
Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and
Jan 1, 2006
-
Research on the Interaction Between Roof Strata and Shield Supports
By Yuanwci Shi
This paper discusses the results of research on the interaction between roof strata and shield supports including the active and passive supporting functions of the shield supports which prevents roof
Jan 1, 1997
-
OFR-46-77 Propagation Of Radio Waves In Coal Mines - I. Executive Summary - A. Objective
By Robert L. Lagace
The objective of this task was to perform theoretical analyses related to identifying and increasing the understanding of wireless propagation mechanisms in mines, and for predicting the performance r
Jan 1, 1975
-
Evaluation of the Quebec Cartier Mining Pelletizing Plant Grinding Mill Efficiency as a Function of Mill Speed
By Caroline B. Chapleau, Mélanie Proulx, Claude Bazin, Gaétan Lavoie
"Quebec Cartier Mining operates a pelletizing plant in Port-Cartier, QC. Grinding, agglomeration and pellets induration are the three main steps in the preparation of iron oxide pellets. In 1998, foll
Jan 1, 2000
-
RI 9315 - Electrolytic Production of Calcium Metal
By J. J. Lukasko
The U.S. Bureau of Mines developed an alternative electrochemical process for the production of calcium metal. The current industrial practice is costly, complex, and inefficient. The Bureau method in
Jan 1, 1990
-
Precious metals exploration fails to makeup for declines in other minerals
By E. D. Attanasi, J. H. DeYoung
Mineral exploration activity in the US suffered through another depressed year in 1984. And continued strength in precious metals (and possibly industrial minerals) exploration failed to make up for d
Jan 5, 1985
-
IC 8696 A Fortran Routine Reorganizer
By Marvin S. Seppanen
Computer programers are often required to make modifications to unfamiliar Fortran routines. This Bureau of Mines report describes a computer program designed to aid the programer in such a situation
Jan 1, 1975
-
East Side Access - Segmental Lining Design Challenges for Closely Spaced and Shallow Tunnels
By D. I. Smith
Constructing tunnels in congested urban areas requires tunnels to be placed closer together and with less cover than was previously necessary. Contract CQ031 of New York?s East Side Access project wil
Jan 1, 2008
-
Part 2: Experimental calibration of sampling parameters K and alpha for Gy?s formula by the sampling tree method ? Synopsis
Application of Gy?s formula is appropriate for calculation of the Fundamental Error (FE) prior to samples being collected at any stage of the minerals process, provided that sampling parameters K and
Jan 1, 2007
-
Modification of Best-Fit Interpretation Method for Ultimate Capacity of Screw Pile
By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"ABSTRACTTheoretical approach to estimate the ultimate pile capacity gives a rough idea at the initial stage of design that later on strengthen by the execution of static pile load test at site. The s
Jan 1, 2014