Search Documents

  • SAIMM
    Technical Operating Flexibility In The Analysis Of Mine Layouts And Schedules (719dec4a-da75-4293-bf65-16fc466b0ebb)

    By C. Musingwini

    An often overlooked factor in the analysis of mine layouts and schedules is technical operating flexibility (or tactical flexibility), mainly due to its nebulous nature. By glossing over technical ope

    Jan 1, 2007

  • AUSIMM
    Improvement of sinter productivity by control of magnetite ore segregation in sintering bed

    By H Matsuno, N Oyama, T Yamamoto, K Nakajima, Y Iwami, N Saito

    Recently, the quality of sinter feed ore used in sintering process has deteriorated. In particular, Fe has decreased and gangue component has increased in the sinter feed ore. Increase of gangue is no

    Jul 24, 2017

  • SAIMM
    Phase Equilibria In K2O-Containing Manganese Smelting Slags

    By S. Ganguly

    Slag samples taken from adjacent to the furnace wall of a submerged arc ferromanganese smelting furnace have been found to contain high concentrations of K2O. To characterize the phase equilibria rele

    Jan 1, 2007

  • AUSIMM
    Solar Drying of Laterite Ores at QNI Yabulu Refinery

    This paper discusses the history and development of the system and the benefits that are being gained for Yabulu from Solar Drying. Following the end of mining of the local Greenvale and Brolga nickel

    Jan 1, 2003

  • SME
    Development of Steel-Fiber Reinforced High Fluidity Concrete Segment and Application to Construction

    By Aki Fujii, Hiroshi Dobashi, Mitsuro Matsuda, Yoshinari Kondo

    INTRODUCTION The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km f

    Jan 1, 2007

  • ISEE
    Wave Transmission Response of Large Structure to High Frequency Blasting Vibration

    By C. T. Aimone-Martin, B. M. Meins

    This paper compares response of large urban structures to small charge weight, ultra-high frequency rock blast excitation from contiguous excavation to that of houses to more distant, larger charge we

    Jan 1, 2018

  • NIOSH
    RI 3476 Properties Of Louisiana Crude Oils - II. - Additional Analyses

    By E. L. Garton

    [Analyses of may crude oils produced in Louisiana are included in reports that t have boon published by the Bureau of Mines. The first report, giving, analyse of 6 Louisiana crude oils, was 3 publishe

    Jan 1, 1939

  • TMS
    Adsorption of Copper from Aqueous Solution by Chemically Modified Orange Peel

    By Liang Sha

    In this study, adsorption of copper by chemically modified orange peel was investigated. A conspicuous change occurs in the surface morphology of the biomass due to modification, which is depicted by

    Jan 1, 2009

  • AUSIMM
    Implementation of Advanced Transfer Chute Designs

    By N van Aarde, B A. Moore, S van der Merwe

    Frequently materials handling operations are compromised by transfer chute problems ranging from high wear rates, blockages and ineffective loading of the downstream conveyor. This paper will present

    Aug 12, 2013

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • NIOSH
    RI 8140 Producing Synthetic Rutile From Ilmenite by Pyrometallurgy - Pilot-Plant Studies and Economic Evaluation

    By G. W. Elger

    This report describes pilot-plant studies and an economic evaluation of a process developed by the Federal Bureau of Mines, Albany Metallurgy Research Center, to produce synthetic rutile from a rock-t

    Jan 1, 1976

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • ABM
    Desenvolvimento Do Tubo Insertado Para O Formador De Espiras Do Laminador 2 Da Arcelormittal Monlevade

    By Carlos Henrique Silveira Aguiar

    O tubo formador de espiras é uma guia que está localizada no Laying Head, especificado de acordo com a norma ASTM 335P22, e tem por função conformar o fio-máquina na forma de espiras sobre o transport

    Jul 30, 2018

  • NIOSH
    RI 6026 Calibration Study Of A Peak-Reading Accelerograph

    By Alfred V. C. Meyer

    A Blastcorder4 was calibrated on the Bureau of Mines shaking table in the frequency range of 12 to 40 c.p.s. and in the amplitude range' of 0.25 to 1.0 g. The results of this calibration study sh

    Jan 1, 1962

  • AUSIMM
    The Mount Kare Gold Project

    By Caithness SJ, Heape JMT

    Following the discovery by CRA of gold at Mt Kare, and the subsequent 1988-90 gold rush, mechanised mining of the alluvial resource is now being carried by a company jointly owned by CRA (51%) and

    Jan 1, 1991

  • NIOSH
    IC 7197 Chalk And Whiting ? Introduction And Acknowledgments

    By Oliver Bowles

    Whiting or Paris white is a fine-grained preparation of calcium carbonate having a wide variety of uses. Until recent years it was prepared almost exclusively from certain north European chalks. With

    Jan 1, 1942

  • SAIMM
    Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro Matoso

    By T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza

    The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s

    Jan 1, 2004

  • AUSIMM
    Timing of Epithermal Activity in the Horohoro-Matahana Basin Area, Taupo Volcanic Zone

    By P J. B Fransen

    Several spatially and/or temporally distinct phases of epithermal activity can be recognised in the Horohoro-Matahana Basin area of the Taupo Volcanic Zone. In the northern Matahana Basin a 140 - 350

    Jan 1, 1991

  • SME
    Stability Investigations In Three-Dimensions Around A Tunnel In A Metal Mine In China

    By P. H. S. W. Kulatilake

    To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior around underground excavations made in the mine. The aim of this study

    Jan 1, 2012

  • TMS
    Mechanical Properties and Their Dependence on Microstructure in Hot-Rolled 3rd Generation Advanced High Strength Steels

    By Meghan McGrath

    Third generation advance high strength steels with microstructures of acicular ferrite and retained austenite were investigated and meet mechanical property goals. A good combination of strength an

    Jan 1, 2010