Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Thornton Road, Listerhills, Bradford

    By B. C. Slocombe

    A large derelict inner city site was regenerated for use as a distribution warehouse. Difficult topography and soils conditions required the adoption of a combination of specialist geotechnical proces

    Jan 1, 1989

  • DFI
    Recent Developments In Secant Bored Pile Wall Construction

    By D. E. Sherwood

    Recent developments in high torque hydraulic rotary rigs has lead to the construction of secant bored pile walls by rotary drilling methods in circumstances where earlier methods were difficult and in

    Jan 1, 1989

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    A New Approach To Estimate The Base Bearing Capacity Of Driven Piles Based On SPT Data

    By N. Shariatmadari

    In recent years, determining bearing capacity of piles from in-situ testing data as a complement of static and dynamic analysis has been used by geotechnical engineers. In this paper, different approa

    Jan 1, 2006

  • DFI
    Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983

    By Clyde N. Baker

    Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted

    Jan 1, 1984

  • DFI
    Design and Installation of Gudrun Platform Jacket Piles

    By Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr

    "Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall

    Jan 1, 2014

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • DFI
    Axial Load Capacity Of Steel Pipe Piles In Sand: A Review Of The API Method - Synopsis

    By Sanjeev Malhotra

    The American Petroleum Institute (API) method of predicting pile capacities in sands is reviewed. Factors that influence pile capacity such as soil parameters, pile parameters, loading effects and ins

    Jan 1, 2000

  • DFI
    Bacteria Help Civil Engineers; Report Of A Pilot Project

    By John W. M. Lambert

    This paper describes the execution and the results of a new method to seal off leaks in water retaining constructions. The new method, called BioSealing is based on activating the bacteries, present i

    Jan 1, 2006

  • DFI
    Impact Of Environmental Regulations On Pile Foundation Design And Construction Using Diesel Hammers

    By R. D. Short

    Environmental regulations for noise and air pollution are directly affecting the type of equipment and construction techniques being utilized for pile driving construction using diesel hammers in Cali

    Jan 1, 1989

  • DFI
    Stress And Deformation Of Pile Foundation Of Sutong Bridge

    By Yin Zongze

    The pile foundation of Sutong bridge pylons is an extra large pile foundation. The length of piles is 115m, and the diameter of the piles is 2.5-2.8m. Since the traditional design method may not deter

    Jan 1, 2006

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    Interlocking H-Sections For Cofferdams Resist High Pressure

    By Marc Dondelinger

    Interlocking H sections with deep webs and high section modulus are being used for cofferdams and shore enclosures where pressures are excessive. The H sections can be as much as a meter deep; they ca

    Jan 1, 1985

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    Downtown Seattle Transit Project - International District Station

    By Richard K. Sandaas

    Start Date: April 4, 1988 Completion Date: Dec. 29, 1989 Contractor: SCI Contractors Past and present transportation centers will come together at International District Station, located at th

    Jan 1, 1990

  • DFI
    Argosy Casino Expansion: Open Cell Sheet Pile® Harbor Project

    By Michael Lane

    With the success of their existing casino operation on the Ohio River in Lawrenceburg, Indiana, the Indiana Gaming Co., LP planned a major expansion of the current facilities. This expansion includes

    Jan 1, 2008

  • DFI
    Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation

    By Michael Arnold, Bob Faulhaber, Joe Nichols

    "Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam

    Jan 1, 2017

  • DFI
    Tapertube ™ Piles

    By Alexander Filotti, Stanley Merjan

    "Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge

    Jan 1, 2014

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • DFI
    25 Story Structure On River Flood Plain Soils Improved By Vibrocompaction And Compaction Grouting

    By Frank Callanan

    The Ameristar Casino expansion project included the design and construction of a 25-story hotel and 9-story parking structure expansion. The site is located in a floodplain on the banks of the Missour

    Jan 1, 2009