Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Computer Simulation of Roadway Development to Support Longwall Mining

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fixed plant transport requirements to that of similar systems in service. This paper descr

    Dec 6, 2010

  • SAIMM
    Computer Simulation Of The Equilibrium Relations Associated With The Production Of Manganese Ferroalloys

    By S. E. Olsen, K. Tang

    The complex heterogeneous equilibria associated with the production of manganese ferroalloys have been simulated by employing recently developed thermochemical databases. The non-ideal Mn-Fe-Si-C all

    Jan 1, 2004

  • AUSIMM
    Computer Usage for Grade Control and Short Term Planning

    Computer applications are ideally suited to the day to day operations of grade control and short term planning on a mine site. By refining this part of the operation there is scope to increase prof

    Jan 1, 1989

  • SME
    Computer Use In The Mining Industry

    By B. L. Gibbs

    The mining industry is constantly in a state of flux -boom or bust; mine openings and closings. Part of the reason is the nature of ore deposits -they are there or they are not. Once they are mined, t

    Jan 1, 1993

  • IOM3
    Computer-aided instruction in mine automation

    By M. J. Scoble, L. M. Daneshmend, C. Hendricks

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993. An attempt is made to relate emerging technologies to education and training req

    Apr 1, 1994

  • AUSIMM
    Computer-Assisted Geological Mapping

    Measurements from an old survey are being machine processed as a pilot project in the development of a computer-assisted method of structural mapping in shield areas. The key element in the system is

    Jan 1, 1969

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • AUSIMM
    Computerised Mineral Data

    Three computerised sets of minerals information are being developed by New Zealand Geological Survey in co-operation with the Resource Management and Mining group of the Ministry of Energy: 1. Geolog

    Jan 1, 1986

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • IOM3
    Computerized mine planning for medium-size open-pits

    By G. H. Blackwell

    Sequences in open pit mining must be planned and regularly revised to incorporate changes in the variables which affect profitability. Interactive computer planning with colour graphic facilities is a

    Jan 8, 1993

  • AUSIMM
    Computers - Overcoming the Phobia: Understanding Resources - Effective Mine Planning - Increased Profit

    By M Bourke

    Modern computers and software provide powerful tools for the geologist to construct reliable models of geological resources, and the mining engineer to produce accurate and workable mine plans. Over t

    Jan 1, 1999

  • SME
    Computers And The Planning Of Dragline Mines

    By Peter N. Calder, J. L. Workman

    There are many opportunities for computers to assist in dragline mine planning. Three important areas particularly lend themselves to computer assisted study. These are overall mine design and plannin

    Jan 1, 1989

  • SME
    Concentradora ?Do[n]a Aida? Design, Construction And Operation Costs

    By Adrian C. Dorenfeld

    Concentradora "Dana Aida" (100 t/d capacity) was built in 1971-1972 to treat dumps and ores containing mixed oxide-sulfide copper-gold-silver minerals from two veins. The veins, Don Felipe and aria ar

    Jan 1, 1979

  • IIMP
    Concentradora Atacocha: Reingeniería alta rentabilidad

    By Marcos Villegas

    El presente texto describe el desarrollo del sistema de gestión de riesgos en la reingeniería de procesos, justificando la inversión en gestión de riesgos de la concentradora Atacocha donde se protege

    Sep 9, 2007

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Concentrate Grade and Regrind Size Improvement on the East Pit Hypogene Ore at Kemess Mine

    By E. Roman, M. Brissette

    "For its end of life, Kemess Mine processed its difficult-to-treat hypogene ore from the east pit, which is a lower grade copper and higher pyrite content gold ore. Metallurgical testwork showed that

    Jan 1, 2012

  • CIM
    Concentrate Sales Management

    By H. McSorley

    "I note that many of you are involved in the production of zinc, lead and copper concentrates and metal, which I am the most familiar with among the non-ferrous metals. This afternoon, I will describe

    Jan 1, 1988

  • AIME
    Concentration - Flotation - Tailings and Mine-dump Reclamation in the Coeur d'Alenes during World War ?? (Mini

    By W. L. Zeigler

    During the middle 1880's, shortly after the discovery of silver-lead ores in the Coeur d'Alene district of northern Idaho, it became apparent that concentration of the ores would be necessar

    Jan 1, 1949

  • AUSIMM
    Concentration and Hydraulic Transport of Heavy Mineral Concentrate with Automatic Control

    Titanium and Zirconium Industries Pty. Ltd. separates rutile and zircon from heavy mineral concentrate recovered from sand dunes on the east coast of North Stradbroke Island, Queensland. Separation pl

    Jan 1, 1962

  • AUSIMM
    Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and Developments

    Igneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in

    Sep 13, 2010