    Constitutive Model for Numerical Modelling of Highly Stressed Heterogeneous Massive Rocks at Excavation Boundaries

    By M. C. Villeneuve

    A numerical modelling approach was developed to explicitly simulate geomechanical characteristics of intact rock: mineralogy, grain size and fabric. The approach involved creating a representative con

    May 1, 2009

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • AUSIMM
    Constraints and Advantages of the Crown Minerals Act and the Resource Management Act

    By A P. Brown

    Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c

    Jan 1, 1997

  • AUSIMM
    Constraints on the Dynamics of Rifting and Denudation on the Eastern Margin of Australia: Fission Track Evidence for Two Discrete Causes of Rock Cooling

    By A Raza, D P. Kohn, D A. Foster, A J. W Gleadow

    A large and increasing data base of apatite fission track results from sedimentary and granitic rocks exposed within the south-eastern highlands and along the continental margin ofAustralia provides c

    Jan 1, 1995

  • DFI
    Constructability Of Tiedback Wall Systems - I. Introduction

    By Thomas C. Anderson

    Tiedback walls are now recognized and accepted as a good solution for a variety of structural problems: ? Retaining Walls and Bridge Abutments in cut situations ? Landslide stabilization ? Rep

    Jan 1, 1991

  • SME
    Constructing the Airside Road Tunnel, Heathrow Airport

    By John Corcoran

    INTRODUCTION Content of this Report The 1300m long twin-bore 8.1m diameter Airside Road Tunnels (ART) were excavated beneath the busy taxiways and stands of Heathrow Airport between 2002and 20

    Jan 1, 2005

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • AIME
    Construction

    By T. A. Rickard

    The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it

    Jan 1, 1931

  • SME
    Construction Aggregate Properties of the Sombrerito Formation, Dominican Republic

    By S. J. Stokowski

    Abstract An extensive drilling and laboratory testing program indicates that a construction aggregate resource is present within the Oligocene Sombrerito Formation limestone, southwestern Dominican Re

    Jan 1, 1991

  • SME
    Construction Aggregates Industry Trends Inspire Innovation

    By Bruce W. Woolpert

    During the SME Board of Directors’ midyear meeting in Monterey, CA Aug. 25, I discussed trends in the construction aggregates industry. Many construction-material suppliers may not have yet fully int

    Jan 1, 2002

  • DFI
    Construction And Design Of Drilled Shafts In Hard Pinnacle Limestones

    By Dan A. Brown

    The following paper was written by Dr. Dan A. Brown, P.E. Brown is an Associate Professor at Auburn University's Department of Civil Engineering. The paper was originally presented at a FHWA&apos

    Jan 1, 1991

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • SME
    Construction Control Instrumentation Used During Tunnel Enlargement

    By Raymond P. Miller, David L. Monson, Robert A. Robinson

    A geotechnical instrumentation program consisting of borehole extensometers and portable tape extensometer stations was effectively used to monitor concrete liner deformations and guide construction p

    Jan 1, 1976

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • SAIMM
    Construction Of A Concrete Plug In South Deep?s Main Shaft To Seal Off A Major Water Intersection

    By M. F. Wells

    The method used to salvage South Deep?s Main Shaft after it was flooded by an inrush of water at about 450 m below collar on 1 May1996 is described. The individual techniques employed in the salvage w

    Jan 1, 1999

  • DFI
    Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project Details

    By Gordon King

    The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b

    Jan 1, 2003

  • DFI
    Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • DFI
    Construction Of A Deep Slurry Wall In A Restricted City Centre Site Using A Hydraulic Grab And Rotator System.

    By P. M. Wiltcher

    The construction of a deep structural slurry wall in a restricted city centre location is always a challenging prospect. However, when the city is London and the site is bounded on two sides by high

    Jan 1, 2006

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001