Search Documents

Search Again

Search Again

Sort by

  • CIM
    Design of paste tailings disposal systems

    By Fred W. Brackebusch

    "The use of paste technology for surface tailings disposal may offer economic, technical, safety, and environmental advantages for both underground and surface mining operations. Paste is a non-Newton

    Jan 1, 2002

  • AIME
    Design Of Permanent Block Stopping To Resist Strata Convergence

    By R. E. Ray, J. W. Stevenson, J. A. Berry

    Conventional concrete block plastered with a cementitious coating is the most common material used in the construction of permanent stoppings to direct airflow in underground mines in the US. All mine

    Jan 1, 1986

  • SAIMM
    Design Of Permanent Intruded Plugs At South Deep Gold Mine

    By G. S. Littlejohn

    In anticipation of the flooding of an adjacent dolomitic groundwater compartment, five rough parallel sided boundary plugs at 58 and 50levels have been designed to resist safely hydrostatic heads of 1

    Jan 1, 2006

  • DFI
    Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, Idaho

    By Dean E. Harris

    The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of

    Jan 1, 2003

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SAIMM
    Design Of Primary Samplers For Slurries In Concentrators And Statistical Methods For Measuring Components Of Variance In Sampling

    By H. E. Bartlett

    In the operation of some flotation plants treating platinum ores it was found that there were imbalances between the inputs and outputs. The inputs and outputs were sampled as slurries and it was dete

    Jan 1, 2002

  • AUSIMM
    Design of Reinforced Concrete Chimney at Yallourn Briquetting Works

    THE Yallourn chimney has aroused interest, as it is, for the time being, the tallest structural erection in Australia. Its height was not decided on, however, with the object of breaking records, but

    Jan 1, 1924

  • DFI
    Design Of Sheet Piling For The Prague Metro Line C

    By Jan Pru?ka

    This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat

    Jan 1, 2011

  • DFI
    Design Of The BMIP Boat Section - Introduction

    By Kenneth Pidgeon

    The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.

    Jan 1, 1994

  • SME
    Design of the Brightwater Conveyance Tunnels

    By Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams

    The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi

    Jan 1, 2005

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • DFI
    Design Optimization - Drilled Shafts Installed In Sand, Gravel And Cobble Formation

    By Emad Farouz

    The resistance of very dense glacial outwash formations consisting of sand, gravel and cobble formations can be quite high, and techniques for measuring the strength and deformation properties often c

    Jan 1, 2006

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014