Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Drill and Blast - A Necessary Evil Or?

    It is well documented that drill and blast outcomes affect the downstream mining processes of loading, hauling, crushing and grinding but it can also significantly impact on mine profitability via dil

    Jan 1, 1999

  • ISEE
    Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping

    By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall

    Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific

    Jan 1, 2018

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2001

  • IOM3
    Drill productivity evaluation by monitoring

    A production drill rig at a site in Sweden was equipped with a monitoring system to estimate production statistics. Drill running times, drill hole depths, penetration rate, rotation speed, thrust, ai

    Jun 19, 1905

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike

    By M. Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • CIM
    Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)

    By R. Mckinstry, M. Rantapaa, T. Bolles

    "Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the

    Jan 1, 2005

  • DFI
    Drilled Displacement Piles - Current Practice And Design

    By Prasenjit Basu

    Drilled displacement piles are being increasingly used as foundation elements, particularly in projects requiring fast construction. Different types of drilled displacement (DD) piles are available i

    Jan 1, 2010

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Drilled Pier Foundations In Expansive Soils ? Synopsis

    By F. H. Chen

    the Rocky Mountain Region since 1950, drilled pier foundations have been widely used to combat structural movement problems in expansive soils. It is now an accepted practice for engineers to use dri

    Jan 1, 2010

  • DFI
    Drilled Piers In Coastal Plain Deposits

    By J. Allan Tice

    In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und

    Jan 1, 1988

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • DFI
    Drilled Pile Design and Installation Challenges in an Urban Environment

    By Satyajit Vaidya, Rudolph Frizzi, Luis Berroteran

    This paper presents design and construction challenges associated with a high-capacity rock-socketed drilled pile foundation system for a 60-story building recently constructed in an urban environment

    Jan 1, 2018

  • SME
    Drilled Shaft Construction At Crownpoint, New Mexico

    By Hassell E. Hunter

    The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr

    Jan 1, 1983

  • DFI
    Drilled Shaft Design For Noise Wall Barriers Along I-20 In Columbia, SC

    By Anil Bhandari

    Using subsurface data collected at each drilled shaft location is an ideal approach for conducting drilled shaft design. However, conducting subsurface tests at each drilled shaft location and subseq

    Jan 1, 2011

  • DFI
    Drilled Shaft Foundations For The KcICON Missouri River Bridge

    By Paul J. Axtell

    The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M

    Jan 1, 2009

  • AUSIMM
    Drilling - Continuity - Mine Planning

    The AusIMM/AMIC code for reporting Reserves seeks to improve the calibre of professional reporting on this subject. But have they gone far enough? Should the code appreciate that the degree of reli

    Jan 1, 1989

  • AIME
    Drilling - Equipment, Methods and Materials - An Analysis of Uncertainty in Directional Surveying

    By R. P. Harvey, J. E. Walstrom, A. A. Brown

    In view of the large number of wells directionally drilled from offshore platforms and urban drillsites, greater interest is being focused on the directional survey and on the uncertainty inherent in

    Jan 1, 1970

  • AIME
    Drilling - Equipment, Methods and Materials - Computerized Drilling Control

    By F. S. Young

    Previous laboratory and field experimentation has demonstrated the effect of several variables on drilling rate.1-5 These results have been incorporated into optimization theories6-" for the purpose o

    Jan 1, 1970

  • AIME
    Drilling - Equipment, Methods and Materials - Fracture Gradient Prediction and Its Application in Oilfield Operations

    By B. A. Eaton

    The subject of many discussions and technical papers in the last 20 years has been the prediction of the well-bore pressure gradients that are required to induce or extend fractures in subsurface form

    Jan 1, 1970

  • AIME
    Drilling - Equipment, Methods and Materials - Stresses at Intersection of Tubes: Cross- and T-Joints

    By A. A. Toprac

    The recurring problem of joint failures in ofjshore structures, coupled with the catastrophic collapse of many of these structures during Hurricane Hilda (1964), hay forced reconsideration of techniqu