Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Driving productivity by increasing feed quality through application of innovative Grade Engineering® technologies

    By S G. Walters

    The minerals industry is facing a productivity and investment crisis. The ‘Millennium Super Cycle’ from 2003–2011 was an unprecedented period of growth and investment resulting in increased throughput

    Sep 20, 2017

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • SME
    Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels Project

    By Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen

    Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project

    Jan 1, 2007

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • CIM
    Drum Hoisting in North America ? Approach to Design

    By Mike Robotham

    When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right

    May 1, 2011

  • AUSIMM
    Drum Scrubber Design and Selection

    A model has been developed for drum scrubbing which allows selection of geometry and power input. Specific aspects considered are: Calculation of total static and operating volumes. Total residence ti

    Jan 1, 2004

  • SME
    Dry Chemical Process To Magnetize Pyrite And Ash For Removal From Coal

    By James K. Kindig

    Hazen Research, Inc., has developed a new process for removing pyritic sulfur and ash from coal. Feed coal is contacted with iron carbonyl vapors, Fe(CO)5, at 190°C which puts a thin skin of magnetic

    Jan 1, 1976

  • SME
    Dry Grinding Experience at the Cortez Gold Mine

    By Garry Keizer

    The Cortez gold mine is located in Lander County, NR, about 130 km (80 miles) southwest of Elko. Cortez Gold Mines (CGM) is a joint venture between Placer Dome US Inc. (60% operator) and Kennecott Cor

    Jan 1, 1993

  • AUSIMM
    Dry processing of magnetic iron ores – addressing cost and environmental issues

    By W Skinner, C G. Kelsey, J R. Kelly

    The iron ore industry has reached the end of an unprecedented period of expansion triggered by China’s demand for iron ore. Lower ore prices have led producers to focus on optimising mining operations

    Jul 24, 2017

  • SME
    Ductsim: The Development Of A Visual Duct Simulation Program

    By I. J. Duckworth

    During the last twenty years computers have be-come widely used to assist with the simulation and design of large scale, primary ventilation systems. However, to date there are few computer programs a

    Jan 1, 2000

  • SME
    Due Diligence Or Short Shrift: The Depth Of Commercial Feasibility In Acquisitions

    By J. J. Fallon

    The subject is "Mergers, Acquisitions and Divestitures in Industrial Minerals, but my remarks could also be applied to new product development, resource development and other new business development

    Jan 1, 1990

  • SME
    Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons Corner

    By John Rudolf

    Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen

    Jan 1, 2008

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • SME
    Durban Harbour Tunnel—First Use of a Slurry Tunnel Boring Machine in South Africa

    By Andrew K. hg` Officer, A. L. Griffiths, J. Andrew Hindmarch, Gert Wittneben

    Durban Harbour in South Africa is one of the continent’s busiest ports however the harbor entrance is currently too small for the new generation of container ships. There-fore it is to be deepened and

    Jan 1, 2007

  • SME
    Dust Abatement Activities Within United States Steel Corporation-Coal Operations

    By R. R. Godard

    The practice of dust abatement or control is not new to any operation of United States Steel Corporation. This report will review those activities, past and present, within the five operating district

    Jan 1, 1967

  • CIM
    Dust Control at Steep Rock Iron Mines Pelletizing Plant

    By P. S. Capper

    "Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr

    Jan 1, 1976

  • SME
    Dust Control Considerations For Deep-Cut Faces When Using Exhaust Ventilation and a Flooded-Bed Scrubber - Preprint 97-48

    By R. A. Jankowski

    The U.S. Bureau of Mines (USBM) conducted a series of laboratory tests to investigate the effectiveness of using a flooded-bed scrubber with exhaust ventilation in deep-cut faces of up to 12.2 m in le

    Feb 24, 1997

  • SME
    Dust Control for Coal Handling : Design Considerations and Solutions

    By Henning E. Soderberg, Robert Brien, O&apos

    Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d

    Jan 10, 1981

  • SME
    Dust control in room-and pillar coal mining using continuous miners: Additional field evaluations

    By Y. P. Chugh

    Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust

    Jan 1, 2009

  • NIOSH
    Dust Control On Longwalls – Assessment Of The State-Of-The-Art

    By J. P. Rider

    Operating practices and resulting production from longwall faces are continually improving. Consequently, longwall operators are continually seeking to improve the dust control capabilities on longwal