    Estimating Mine Operating Costs - Trials and Tribulations

    The projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac

    Jan 1, 1990

  • SAIMM
    Estimating Mine Planning Software Utilization for Decision-Making Strategies in the South African Coal Mining Sector

    By T. Celik, B. Genc, C. Musingwini

    "Mine planning software continues to be an important factor when it comes to the development of the South African mining industry. To contribute to this development, a new methodology to define and me

    Jan 1, 2016

  • SAIMM
    Estimating mine planning software utilization for decision-making strategies in the South African gold mining sector

    By T. Celik, B. Genc, C. Musingwini

    "This paper discusses a new methodology for defining and measuring mine planning software utilization in the South African gold mining sector within an evolving data-set framework. An initial data-set

    Jan 1, 2015

  • DFI
    Estimating N Value from Data in Press-In Piling

    By Yukihiro Ishihara, Nanase Ogawa, Ming Lei

    "Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro

    Jan 1, 2014

  • AUSIMM
    Estimating Particle Size Fraction Proportions - A Multiscale Approach Using Multiple Kernel Learning

    Estimating Particle Size Fraction Proportions - A Multiscale Approach Using Multiple Kernel Learning

    Sep 13, 2010

  • SME
    Estimating Strain and Stress in Oriented Rock Cores Using a Diametral Deviation Method

    A practical core-based method for estimating in situ stress was tested using 360° measurements of rock core diameter in a laboratory setting. In several mining districts across West Virginia, rock cor

    Jan 7, 2020

  • SAIMM
    Estimating the modulus of elasticity of the rock material from compressive strength and unit weight - Synopsis

    By I. Ocak

    The modulus of elasticity of rock material (Ei) is an important rock property that is used as an input parameter in the design stage of engineering projects such as dam and tunnel constructions, minin

    Jan 1, 2008

  • CIM
    Estimation Errors for Gold Inventory in Large Carbon-In-Leach Tanks

    By Jr. Blanchette, Claude Bazin, Paul Blatter

    "Reporting of the gold production during a month implies to estimate the mass of gold that is processed by a mill, recovered as dorés, lost to the tailings and the change of gold inventory within the

    Jan 1, 2011

  • AUSIMM
    Estimation for Engineering Design Purposes of the Principal Stress Directions in Rocks Containing Residual Strains

    Unrelieved residual strains can influence the states of stress in rock masses. If cheap, stable structures are to be constructed in Tock in which large pressures are exterted by unrelieved residual st

    Jan 1, 1964

  • ISEE
    Estimation of Amount of Heavy Metal Deposit of Open Surface Mass Detonations per Unit Area

    By M. Hokkanen, M. Hagfors

    The Finnish Defence Forces has destroyed old and spoilt munitions in open surface mass detonations at Hukkakero fell in municipality of Kittilä, Lapland, since 1988. The technique was learned from Swe

    Jan 1, 2015

  • SME
    Estimation Of Capital And Operation Costs Of Backhoe Loaders

    By B. Oraee

    Accurate estimation of equipment costs is a key factor in feasibility study and evaluation of design alternatives of mining projects. In this paper, capital and operation costs of backhoe loaders are

    Jan 1, 2011

  • SAIMM
    Estimation of Future Ground Vibration Levels in Malmberget Town Due to Mining-Induced Seismic Activity

    By T. Wettainen

    Malmberget town is located in northern Sweden, approximately 70 km north of the Arctic Circle. Parts of the town overlie more than 20 iron orebodies, consisting mainly of magnetite with smaller quanti

    Jan 1, 2014

  • SME
    Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration

    By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa

    Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses

  • SME
    Estimation of Grinding Time for Desired Particle Size Distribution and for Hematite Liberation Based on Ore Retention Time in the Mill Mining, Metallurgy and Exploration (ff4e1177-21df-44a1-9ca7-c600c2bd555d)

    By Rameshwar Sah, Bharath Kumar Shanmugam, Govinda Raj Mandela, Marutiram Kaza, Harsha Vardhan, Harish Hanumanthappa

    Iron ores obtained from different sources differ in their chemical and physical properties. These variations make the process of grinding a difficult task. The work carried out in this context focuses

  • SME-ICGCM
    Estimation of in-situ material strength

    By Danell. R. E.

    A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com

    Jan 1, 1989

  • SME
    Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit Definition

    By R. Benito

    This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace

    Jan 1, 2008

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • SAIMM
    Estimation of joint behaviour by monitoring and analysis in the rock cavern

    By T. Maejima, K. Aoki, T. Mori, K. Iwano

    Concerning the excavation of rock cavern, it is one of the most important issues to evaluate the behavior of rock joints. But few detailed measurements for joint behavior had been conducted. Therefor

    Jan 1, 2003

  • CIM
    Estimation of large open pit haulage truck requirements

    By G. H. Blackwell

    Open pit mine management must ensure that sufficient trucks are available and are being used effectively for production, and that operating costs are under continued control and review for improvement

    Jan 1, 1999

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996