  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • AIME
    Inclusions-Their Effect, Solubility and Control in Cast Steel

    By C. E. Sims

    THE following presentation is more a summation of observations made and conclusions drawn over a period of three to four years than a report of experiments made with a definite objective. Tests were m

    Jan 1, 1932

  • SME
    Inconsistency in gravimetric sampling pumps and cyclones

    By R. J. R. Cornelissen

    The elimination of the incidence of silicosis in employees in industries such as mining and pottery is an ongoing international initiative. After many decades of industrial activity in these industrie

    Jan 1, 2009

  • SAIMM
    Incorporating BEE Into The New Mineral Law Framework For The South African Mining Industry

    By S. V. Rungan

    Since 1994, South Africa has been the subject of international attention, especially in regard to its transformation initiatives, which aim to redress the post-apartheid imbalances. Mining, as a major

    Jan 1, 2005

  • SME
    Incorporating Cycle Time Dependency In Truck-Shovel Modeling

    By A. Anani

    The need to optimize surface mining operations has led to the use of discrete event simulation (DES) modeling of truck-shovel systems. Often, these models assume truck cycle times are independent and

    Feb 27, 2013

  • SME
    Incorporating Indigenous Technologies Into Enhanced Stormwater, Erosion And Sediment Control Systems

    By R. C. Warner, L. Mills, S. D. Botts, M. Marticorena

    The Antamina Mine is located in the mountainous region of the Ancash Department of Peru at an elevation of approximately 4200m.The 120 km main access road crosses the headwaters of numerous high-value

    Jan 1, 2004

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • SAIMM
    Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi

    Jan 1, 2007

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • SAIMM
    Increased Productivity Of Zinc Roasters And SO2 -Quality

    By Pekka Taskinen

    Advanced optimizing control of the fluidised bed zinc roaster has been in use for an extended period at Boliden Kokkola and the implications are seen as extended bed stability, increased throughput an

    Jan 1, 2008

  • AUSIMM
    Increased Rolling Mill Capacity at Kwinana and Newcastle

    The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa

    Jan 1, 1957

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • SAIMM
    Increasing efficiency of conveyor belt transporting system 4 Belt Lonmin - Synopsis

    By G. G. le Roux

    The purpose of the investigation was to assess various options for increasing the efficiency of the conveyor belt transporting system used at 4 Belt Shaft at Lonmin?s Marikana operations. The reason f

    Jan 1, 2008

  • AUSIMM
    Increasing Face Ventilation in Coal Mines

    The author summarizes and extends the relevant results of papers previously published by various authors and presents these results in chart form. The charts are used to demonstrate the theory on a hy

    Jan 1, 1958

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • SME
    Increasing Importance of Countertrade

    By Raymond W. Peterson

    The practice of Countertrade and all of its variations has increased dramatically during the last five years in great part due to the worsening world economic situation and the Third World's incr

    Jan 1, 1986

  • DFI
    Increasing Lateral Pile Stiffness Through Limited Soil Improvement

    By Thomas J. Weaver

    Piles extending through soft soil near the ground surface will have a relatively low lateral stiffness. As a result, lateral serviceability limits may control the number of piles required for foundat

    Jan 1, 2006

  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016