Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pillar Extraction and its Relation to Surface Movement
Surface subsidence caused by coal mining operations was the subject of a very successful symposium organised by the Illawarra Branch of The Australasian Institute of Mining and Metallurgy in February,
Jan 1, 1980
-
Pillar Failure in Deep Coal Seams: Numerical Simulation
By S. Badr, R. Mendoza, M. U. Ozbay, M. D. G. Salamon
ABSTRACT: The use of coal pillars at depth is fraught with problems due roof control difficulties and the possible occurrence of coal or pillar bumps. In the USA the largest and most important applic
Jan 1, 2003
-
Pillar Optimization For Initial Design And Retreat Recovery
By Charles Steed
The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t
Jan 1, 2003
-
Pillar Recovery At The Buick Mine
By David E. Nicholas, Steven R. Dismuke, Paul F. Cicchini
The Buick mine, located 195 kilometers (120 miles) southwest of St. Louis in the Viburnum Trend, is owned and operated by Homestake Mining Company. The mine produces lead and zinc ore from a room and
Jan 1, 1986
-
Pillar Reinforcement or Rib Support?
By André C. Zingano
The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com
Jan 1, 2006
-
Pillar Stability Issues Based On A Survey Of Pillar Performance In Underground Limestone Mines
By Dennis R. Dolinar, John L. Ellenberger, Gabriel S. Esterhuizen, Anthony T. Iannacchione
A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as “Good” to “Very
-
Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)
By Gabriel S. Esterhuizen
A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very
Jan 1, 2006
-
Pillar Strength and Design Methodology for Stone Mines
By Gabriel Esterhuizen
Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd
Jan 1, 2008
-
Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)
PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper
Jan 1, 2001
-
Pilot Plant Testing for Column Flotation Circuit Design
By G. A. Kosick, G. S. Dobby, O. Matwijenko
"A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl
Jan 1, 1990
-
Pilot Plant Testing in Mineral Process Plant Design
By Dunlop GA
Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t
Jan 1, 1990
-
Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)
A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S
Jan 1, 1963
-
Pilot Tests for Heavy Metals Removal in Mine Water
By M Vendrup, T C. Christensen, C Dube
The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u
Sep 7, 2015
-
Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project
By A. Feather
Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently
Jan 1, 2002
-
Pilot-Scale Frother Testing at Highland Valley Copper
By S. D. D. Welsby
"A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over
Jan 1, 2014
-
Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary
By K. Nong, H. F. Fuls
The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl
Jan 1, 2007
-
Piloting Regenerative SO2 Scrubbing At Xstrata Nickel
By D. G. Tisdale
A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different
Jan 1, 2009
-
Pin Piles For Seismic Rehabilitation Of Bridges
Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Pin Piles For Structural Underpinning - Summary
By Seth L. Pearlman
Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou
Jan 1, 2000
-
Pipe Conveyor And Belt: Belt Construction, Low Rolling Resistance And Dynamic Analysis
New developments in the pipe conveyor and belt are advanced to address the growth in the capacity, length and complexity of pipe conveyor systems. Improved belt construction can offer better stability
Jan 1, 2012