Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Pillar Extraction and its Relation to Surface Movement

    Surface subsidence caused by coal mining operations was the subject of a very successful symposium organised by the Illawarra Branch of The Australasian Institute of Mining and Metallurgy in February,

    Jan 1, 1980

  • SAIMM
    Pillar Failure in Deep Coal Seams: Numerical Simulation

    By S. Badr, R. Mendoza, M. U. Ozbay, M. D. G. Salamon

    ABSTRACT: The use of coal pillars at depth is fraught with problems due roof control difficulties and the possible occurrence of coal or pillar bumps. In the USA the largest and most important applic

    Jan 1, 2003

  • SME-ICGCM
    Pillar Optimization For Initial Design And Retreat Recovery

    By Charles Steed

    The design of pillars in room and pillar operations is always a compromise between factor of safety and ore recovery. In actively mined and accessed areas the stability of pillars must be sufficient t

    Jan 1, 2003

  • SME
    Pillar Recovery At The Buick Mine

    By David E. Nicholas, Steven R. Dismuke, Paul F. Cicchini

    The Buick mine, located 195 kilometers (120 miles) southwest of St. Louis in the Viburnum Trend, is owned and operated by Homestake Mining Company. The mine produces lead and zinc ore from a room and

    Jan 1, 1986

  • SME-ICGCM
    Pillar Reinforcement or Rib Support?

    By André C. Zingano

    The coal pillars in room-and-pillar mining method are subjected to vertical stress due to overburden rock mass and horizontal stress relieve due to entries excavation around them. Some coal mining com

    Jan 1, 2006

  • NIOSH
    Pillar Stability Issues Based On A Survey Of Pillar Performance In Underground Limestone Mines

    By Dennis R. Dolinar, John L. Ellenberger, Gabriel S. Esterhuizen, Anthony T. Iannacchione

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as “Good” to “Very

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Pillar Strength and Design Methodology for Stone Mines

    By Gabriel Esterhuizen

    Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd

    Jan 1, 2008

  • SME
    Pilot Plant Demonstration Of The Platsol® Process For The Treatment Of The Northmet Copper-Nickel - PGM Deposit (2b88692d-3bac-4547-86c3-f3ee9071956d)

    PolyMet Mining is developing the NorthMet property near Duluth, Minnesota. Laboratory investigations had led to the development of the PLATSOL process to dissolve in one step the base metals (copper

    Jan 1, 2001

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • AUSIMM
    Pilot Plant Testing in Mineral Process Plant Design

    By Dunlop GA

    Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t

    Jan 1, 1990

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • AUSIMM
    Pilot Tests for Heavy Metals Removal in Mine Water

    By M Vendrup, T C. Christensen, C Dube

    The adsorptive and granulate forming MetClean™ process has been used at many locations in Northern Sweden, Norway, Denmark, France, Spain, Mongolia, Japan and Australia. It has been pilot tested and u

    Sep 7, 2015

  • SAIMM
    Pilot-Plant Solvent Extraction Of Cobalt And Nickel For Avmin?s Nkomati Project

    By A. Feather

    Avmin have developed a flowsheet for the refining of copper, nickel and cobalt from Nkomati concentrates. Cobalt is recovered from calcium-saturated solution using Cyanex® 272. Nickel is subsequently

    Jan 1, 2002

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary

    By K. Nong, H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2007

  • METSOC
    Piloting Regenerative SO2 Scrubbing At Xstrata Nickel

    By D. G. Tisdale

    A pilot plant was installed and operated at the Xstrata Nickel Sudbury Smelter 10 demonstrate the CANSOLV SO2 Scrubbing System. A 350 m3/h slipstream (through a 10cm pipe) was drawn from two different

    Jan 1, 2009

  • DFI
    Pin Piles For Seismic Rehabilitation Of Bridges

    Since the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i

    Jan 1, 1993

  • DFI
    Pin Piles For Structural Underpinning - Summary

    By Seth L. Pearlman

    Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou

    Jan 1, 2000

  • SME
    Pipe Conveyor And Belt: Belt Construction, Low Rolling Resistance And Dynamic Analysis

    New developments in the pipe conveyor and belt are advanced to address the growth in the capacity, length and complexity of pipe conveyor systems. Improved belt construction can offer better stability

    Jan 1, 2012