    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • SME-ICGCM
    The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill Colliery

    By Clive Chadbourne

    Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s

    Jan 1, 1994

  • SME
    The Design and Use of Steel Fiber Reinforced Concrete Segments

    By Michael R. King

    The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared

    Jan 1, 2005

  • SAIMM
    The Design Of A Concrete Transport System On Cullinan Diamond Mine

    In order to deliver a quality shotcrete and concrete product underground for the extensions to the Cullinan Diamond Mine operations it was decided to develop a new, simpler concrete product to meet un

    Jan 1, 2006

  • SAIMM
    The Design Of A Single Aggregate Concrete On Cullinan Diamond Mine

    A single aggregate mix design was developed based on a slag/Portland binder blend and crusher sand. The primary design criterion, after performance, was the fluidity of the shotcrete and concrete prod

    Jan 1, 2006

  • AUSIMM
    The Design of Blends for the Production of Metallurgical Coke with Particular Reference to Long Term Aspects of Using New South Wales Coals

    Coking coals are very much in demand on a world wide basis, particularly the higher rank coking coals, which form an important part of many coking blends and which represent the smallest portion of th

    Jan 1, 1972

  • AUSIMM
    The Design of Continuous Thickeners for Flocculated Materials

    By Goldney L. H

    The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment

    Jan 1, 1959

  • AUSIMM
    The Design of Draft Tube Circulators

    Draft tube circulators are now widely used instead of Pachucas for suspension of slurries in large tall tanks.Precipitators in the alumina industry are an example.Draft tube/tank diameter ratio is cri

    Jan 1, 1982

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • SME
    The Design Of Mine Plant Buildings For Remote Locations with Cold Climates

    By John C. Bowling

    Many recent mine developments in North America are located in remote northern regions with extreme winter temperatures in the range of -20oF to -60°F. In addition, many locations are subject to very h

    Jan 1, 1971

  • SAIMM
    The Design Of Stable Pillars In The Bushveld Complex Mines: A Problem Solved? - Synopsis

    By D. F. Malan

    This paper gives an overview of the difficulties associated with determining the strength of hard-rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Jan 1, 2011

  • SAIMM
    The Design Of Stable Stope Spans For Shallow Mining Operations

    By A. H. Swart

    Unplanned stope panel collapses occur on most near-surface and shallow mines in South Africa. Although these incidents often occur during blasting, they pose a major threat to the safety of undergroun

    Jan 1, 2005

  • SME
    The Design, Commissioning And Operation Of The Castle Valley Plant In Wellington, Ut

    By P. J. Bethell

    Background Increasingly complex geological conditions, with the presence of high ash binders in the mining horizon were encountered at the A.C. I. Dugout Mine near Price, Utah. This led to the prod

    Jan 1, 2008

  • CIM
    The Design, Commissioning and Operation of the Golden Giant Paste Backfill Plant

    By Jim Dodd, Jim Paynter

    "We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi

    Jan 1, 1997

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • CIM
    The Design, Installation and Operation of a Tower Mounted Friction Hoist at Opemiska Copper Mines (Quebec) Limited

    Why A Friction Hoist? B EFORE discussing the equipment, it would be instructive to review the factors that influenced the management of Opemiska Cop-per Mines to purchase a friction hoist rather than

    Jan 1, 1962

  • SAIMM
    The Detection Of Blast Damage By Borehole Pressure Measurement

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM The technique reported here involves measuring the air pressures generated within sealed b

    Jan 1, 2000

  • AUSIMM
    The Determination of Certain Curves and Their Application to the Desilverisation of Lead by the Parkes Process

    WHILE in the employ of the Broken Hill Associated Smelters and the Electrolytic Zinc Oompanies at their South Melbourne Research Station, the writer was detailed to investigate the principles underlyi

    Jan 1, 1925

  • AUSIMM
    The Determination of Gold in Mill Cyanide Solutions by Atomic Absorption Spectroscopy

    Gold was determined directly in eight different mill cyanide solutions, by atomic absorption spectroscopy in an acetylene-air flame. Some of the mill solutions were diluted with water to bring them in

    Jan 1, 1964

  • AUSIMM
    The Determination of Platinum in Ores and Mineral Concentrates

    An assessment of methods currently available for the accurate determination of low concentrations of platinum in ores and mineral concentrates indicated that prior treatment of the sample by fire assa

    Jan 1, 1970