Search Documents

Search Again

Search Again

Sort by

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • AUSIMM
    Uncertainty and Risk in Mineral Valuation - A User's Perspective

    The words ""Uncertainty"" and ""Risk"" pervade every discussion about mining exploration and investment. Perhaps these terms are subjectively understood by industry professionals, but objective por

    Jan 1, 1994

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis (443bbb20-5eab-43f3-85de-c6c40fb656b6)

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • SAIMM
    Uncertainty Determination in Rock Mass Classification When Using FRMR Software

    By M. Rafie, M. Rinne, F. Samimi Namin

    "SynopsisRock mass classification systems constitute an integral part of empirical underground excavation design. One system that is commonly used to classify rock mass is the Rock Mass Rating, or RMR

    Jan 1, 2015

  • SAIMM
    Uncertainty in Rock Mechanics and Rock Engineering—Then and Now

    By H. H. Einstein

    This paper reviews how uncertainty has been dealt with over the past 40 years using the decision making cycle as a frame of reference. The review of the phases of this cycle, as applied to rockmechani

    Jan 1, 2003

  • SME
    Unconventional Mining – New Generation of Mining Technology of the XXI-st Century – Preprint 97-45

    By K. Y. Vasioutchkov, Y. F. Vasyuchkov, B. M. Vorobjev

    In general a term "unconventional mining or "non-traditional mining technology" getting more and move familiar to the mining engineering media. There are several alternating terminological combination

    Feb 24, 1997

  • AUSIMM
    Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)

    By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes

    Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p

    May 9, 2016

  • ISEE
    Underground Applications Using the New EZDrifter Dual Delay Detonator System

    By Pierre L. Labelle

    Non electric Dual Delay initiators have revolutionized many aspects of underground mining. The units are used in all types of underground blasting operations. Some operations, due to the complexity an

    Jan 1, 1994

  • AUSIMM
    Underground bulk sampling, uniform conditioning and conditional simulation – unrealistic expectations?

    By I Clark, S C. Dominy

    Bulk sampling programs are typically applied in coarse gold mineralised systems to verify resource/reserve grades. In recent years, there have been controversies surrounding some results of undergroun

    May 9, 2017

  • SME
    Underground Caving Shield Change Outs At Us Steel’s Oak Grove Mine

    By B. Weyerman

    U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor

    Jan 1, 2001

  • SME
    Underground coal mining and attendant subsidence control : Some history, technology, and research

    By Syd S. Peng, C. Y. Chen

    Introduction The Surface Mining Control and Reclamation Act was passed in 1977 to put an end to the uneven environmental standards and enforcement established by various coal mining states in the US.

    Jan 2, 1986

  • SME
    Underground Construction Is Crucial To Success Of Olympic Games Venues

    When the 2008 Olympic Games begin in Beijing, China is September it will not only mark the end of the journey for the Olympic torch and the thou-sands of participating athletes, but the games will als

    Jan 1, 2008

  • IOM3
    Underground disposal of radioactive waste by United Kingdom Nirex Ltd.

    By B. J. Breen, C. S. Mogg

    Considerable borehole investigation work has been completed at a proposed site at Sellafield in Cumbria, supplemented by seismic surveys, other geophysical sensing and geological mapping. The focussin

    Aug 1, 1994

  • SAIMM
    Underground Environmental Challenges In Deep Platinum Mining And Some Suggested Solutions

    By M. Karsten

    Platinum mines in the Bushveld Complex are located in areas with a high geothermal gradient. This means that, compared to, for example, gold mines of the Witwatersrand region, high rock temperatures

    Jan 1, 2012

  • SAIMM
    Underground Extraction Of Contiguous Coal Seams/Sections Consisting Thin Parting: A Case Study

    By Rajendra Singh

    Underground depillaring of contiguous coal seams/sections is a difficult problem, which becomes even more complex if the interburden/parting between them is thin. Conventionally, the depillaring with

    Jan 1, 2004

  • AUSIMM
    Underground Geomechanics at Porgera Mine, Papua New Guinea

    Mt Waruwari, host to the Porgera underground gold mine in the Highlands of Papua New Guinea (PNG), is a prominent ridge of sediments and dioritic intrusives rising approximately 600m above the sur

    Jan 1, 1991

  • SAIMM
    Underground Haulage Selection: Shaft Or Ramp For A Small-Scale Underground Mine

    By B. Elevli

    This paper deals with the selection of alternative accesses to a podiform chromite orebody in Turkey. The most important alternatives studied in a related project have been stated as a new vertical sh

    Jan 1, 2002