Search Documents

Search Again

Search Again

Sort by

  • DFI
    Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of Stockholm

    By T. Iwanowski

    Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i

    Jan 1, 1991

  • CIM
    Carl Auer and the Beginning of the Rare Earths Industry

    By F. Habashi

    "The rare earths industry started in Austria in 1887 by Carl Auer von Welsbach (1858-1929) Professor of Chemistry at the University of Vienna. The process was based on monazite sand transported from B

    Jan 1, 2012

  • AUSIMM
    Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades

    By C Maloloy-on, S Morgan, M Deiparine, H Mackie

    There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie

    Sep 7, 2015

  • ISEE
    Case Examples of Sensor Coupling Effect on Blast Vibration Measurement and Charge Weight Scaling Plot

    By Gabsoo Kim, Rulin Yang, Dave Kay

    Blast vibration data, such as PPV are usually scattered. In many cases, plots of PPV versus the charge weight scaled distance are so scattered that useful trends from different blast designs cannot be

    Jan 1, 2014

  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • DFI
    Case Histories Of Geo-Column? Foundations - Synopsis

    By Osamu Taki

    This paper presents the system, the strength of column, the design concept, and the applications with four case histories from the past project as the general aspect of Geo-Column (trade mark of singl

    Jan 1, 2000

  • SME
    Case Histories Of Plant Modification

    By A. T. Yu

    As a nation, we have been known as perhaps the most wasteful in history. From the perspective of engineers and builders on the other hand, planned obsolescence and demolition did beneficially pave way

    Jan 1, 1985

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • SME
    Case History of a Mixed Ground Microtunnel

    By D. Craig Camp

    conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT

    Jan 1, 2001

  • AUSIMM
    Case History of the Corridor Orebody, Mount Lyell, Tasmania

    By McKenzie A. M

    The Corridor ore body is so named because it occurs in an east-west zone or corridor of schist bounded on the north by the siliceous conglomerates of Mount Lyell, and on the south by similar conglomer

    Jan 1, 1961

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e

    Jan 1, 1995

  • NIOSH
    Case History Of The Response Of A Longwall Entry Subjected To Concentrated Horizontal Stress

    By D. Oyler

    The National Institute for Occupational Safety and Health (NIOSH) Pittsburgh Research Laboratory (PRL), RAG Pennsylvania and Strata Control Technologies of Australia collaborated in an intensive study

  • DFI
    Case History Of The Support Of Excavation System At The Dulles Automated People Mover (DAPM) Tunnels And Stations

    By Marlion T. McQuinn

    This paper will discuss the design, construction, and performance of the support of excavation on the Dulles East and West Automated People Mover Tunnels and Station projects. The elements of the sys

    Jan 1, 2006

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • DFI
    Case History Of The Support Of Excavation System Used At The Atlantic Building Project In Washington, DC

    By Joseph C. Gillen

    This paper discusses the design, construction, and performance of the support of excavation system used at The Atlantic Building jobsite. The support of excavation system had to be adaptable to the d

    Jan 1, 2006

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal

    By Randy R. Huberty

    Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result

    Jan 1, 2001

  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    Case History: Use Of Rock-Socketed Augered Cast-In-Place Piles

    By Tracy Brettmann

    The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced

    Jan 1, 1998