Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of a Cadmium Removal Process for Vale’s Long Harbour Hydrometallurgy Plant
By P. C. Holloway, A. Tshilombo, T. Xue, M. J. Collins, R. Lopetinsky, I. Mihaylov, I. M. Masters
The Voisey’s Bay deposit contains a trace amount of cadmium, which reports to solution during pressure leaching of the nickel concentrate at Vale’s Long Harbour Hydrometallurgy Plant, and must be remo
Jan 1, 2019
-
Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case Study
By Kevin Andrews, Terry Hamric, Scott Nelson
"Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini
Jan 1, 2019
-
Newcrest’s Industry First Application of Eriez Hydrofloattm Technology for Copper Recovery from Tailings at Cadia Valley Operations
By L. Vollert
In August 2018, the first full-scale HydroFloatTM cells for the recovery of coarse composited copper and gold were commissioned at Newcrest’s Cadia Valley operation in New South Wales, Australia. The
Jan 1, 2019
-
Nitrogen-Based Collectors for Sulfide Flotation – Tecflote™
By A. Lewis, J. Zachwieja, M. Widell, P. Zhou, W. W. Geissler, M. Svensson, A. Movahedi, H. Nordberg
Flotation collectors for sulfide minerals has been traditionally based on xanthate, thiophosphate, thiophosphinate and thiocarbamate, all derived from sulfur chemistry. Tecflote™ is a new family of pa
Jan 1, 2019
-
The Real Cost of Material Handling Problems – And How to Avoid Them
By T. Holmes
Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>
Jan 1, 2019
-
Florida Mining Blast Vibration Study Part 3: Data and Analysis Review
By Tristan Worsey, Nathan Rouse
The Florida legislature allocated funding for the Florida State Fire Marshal (FSFM) to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vib
Jan 1, 2019
-
Anode Furnace Nitrogen Gas Purging System at Kansanshi Copper Smelter
By L. Hanschar, C. Bwalya, E. Mokola, K. Musonda, A. Makayi
This paper describes the installation, commissioning and operation of porous plugs featuring nitrogen gas purging in both Anode Furnaces at the Kansanshi Copper Smelter (KCS), a greenfield copper smel
Jan 1, 2019
-
Kansanshi Copper Smelter: The First Four Years of Operation
By S. Hunt, D. de Vries
Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe
Jan 1, 2019
-
Installation of Shaft Bottom Steel Prior to Shaft Sinking
By D. M. Ziebarth
"Normal sequence of operations to develop a new underground mine is: construct and outfit headframe for shaft sinking, sink shaft, construct and outfit shaft sump, develop shaft station and shaft bott
Jan 1, 2019
-
Impact of Blasting on Downstream Process to Maximize the Profitability of Mining Industries
By Kyle Wagner, William Joa, Colter Angell, Catherine Johnson, Marty Langenderfer, David Doucet
The goal of any business is to seek the maximum profitability for the organization through optimization the use of resources, processes and the application of new technologies. An analysis of various
Jan 1, 2019
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?
By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter
By Hongfei Li, JianLong Wang
This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for
Jan 1, 2019
-
Preventing Roof Falls in Weak Ground
By Ryan C. Stephan, Christopher Mark
"Some of the weakest roof in United States coal mines is found in the Illinois Basin. Historically, the Illinois Basin has also suffered from high rates of unplanned roof falls and rock fall injuries.
Jan 1, 2019
-
One Hundred Years of Electrolytic Copper Production in Finland
By P. Latostenmaa, O. Forsén, M. Lundström, J. Aromaa
The history of electrolytic copper production in Finland is closely connected with the industrialization of Finland and events of the Second World War. Production of cathode copper by electrowinning f
Jan 1, 2019
-
Investigation of Shock Propagation in Air from Sheet Explosive
By S. Kevin McNeil, William Joa, Catherine Johnson, S. Omar Garcia
The geometry of an explosive is known to have a fundamental effect on the resulting shock wave propagation. Typically researchers use a spherical or hemispherical geometry in order to simplify the sho
Jan 1, 2019
-
Latest Development in Cathode Stripping Machines
By M. Schmidt, P. Nord, M. Larinkari
Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode
Jan 1, 2019
-
Florida Mining Blast Vibration Study Part 4: Conclusions and Recommendations
By Tristan Worsey, Nathan Rouse
Florida legislature allocated funding for the Florida State Fire Marshal to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vibration limi
Jan 1, 2019
-
Technology Options and Innovation for Copper Heap Leaching
By Damian Connelly
The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor
Jan 1, 2019
-
Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces
By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler
Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre
Jan 1, 2019
-
Sustainable Change of Coal Mining Regions
By J. Kretschmann
According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The
Jan 1, 2019