Search Documents

Search Again

Search Again

Sort by

  • SME
    Mineralogical Overview Of The Behavior Of Gold In Conventional Copper Electrorefinery Anode Slimes Processing Circuits

    By T. T. Chen

    The behavior of gold in a conventional copper electrorefinery anode slimes treatment process is expounded on in this study. In the raw anode slimes generated in a copper electrorefinery, gold occurs m

    Jan 1, 2008

  • AUSIMM
    Recent Advances from the United Kingdom Tunnelling Industry - The A3 Hindhead Project

    By T Rock

    This paper looks at recent advances in the United Kingdom (UK) tunnelling industry with particular reference to the A3 Hindhead Project. A 1.8 km long twin bore tunnel is the centrepiece of the A3 Hin

    Jan 1, 2008

  • SME
    Dysfunction Junction: When Inalterable Rules Meet Evolving Technology

    By Mark N. Savit

    It is indeed a rarity for a non-engineer, let alone a lawyer, to even be considered for a mining-related award, especially where that award is for significant contributions to technical progress in th

    Jan 1, 2008

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • SAIMM
    An investigation of mechanisms involved in backfill-rock mass behaviour in narrow vein mining - Synopsis

    By F. P. Hassani

    Today, mine backfilling has become an integral part of mining operations, both from a local and overall ground control point of view, and as regards mining techniques and environmental considerations.

    Jan 1, 2008

  • CIM
    Toward the 24 hour large SAG Mill Reline

    By John Russell

    "Faster, safer, grinding mill relining offers the obvious attractions of reduced mill relining times with the knock-on incentive to reduce all other maintenance down-time, opening the possibility for

    Jan 1, 2008

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008

  • SME
    Simulation Assisted Performance Improvements in Iron Ore Processing Plants (4c3a19f0-0877-40d2-a6da-cdc5ac5ec399)

    By S. Ersayin

    In 1998, the Concentrator Modeling Center was established within the Coleraine Minerals Research Lab to develop models for simulation of iron ore processing plants, and to assist plant operators in im

    Jan 1, 2008

  • DFI
    Behavior Of Step Tapered Bored Piles In Sand Under Axial Loading

    By Nabil F. Ismael

    The axial capacity of step tapered bored piles in sand was examined by field tests at one site in Kuwait. Two straight piles, and two step tapered piles were load tested in compression to failure. Al

    Jan 1, 2008

  • SME
    Regulatory Toxicology And Pharmacology - Rapporteur?s Report - Session II: Characterization Of Fibrous Minerals

    The central question concerning the health risks associated with mining and processing of taconite ores in the Eastern Mesabi Range is ??does asbestos, of any variety, occur within the gangue mineral

    Jan 1, 2008

  • SME
    Excavating New York?s East Side Access Project

    By Desiree Willis

    One of New York City?s largest subway projects is under way 43 m (140 ft) beneath the surface of downtown Manhattan. The East Side Access project, more than 30 years in the making, was halted after a

    Jan 1, 2008

  • SME-ICGCM
    Evaluation of a Multiple Seam Interaction Coal Pillar Bump

    By Michael Gauna

    An evaluation and analysis of a coal pillar bump in a West Virginia mine indicated that the pillar bump occurred because of the unique combination of controlling factors. The pillar?s development sta

    Jan 1, 2008

  • SME
    Design of the University Link Tunnels and Stations

    By Daniel N. Adams

    The University Link project extends Seattle?s light rail from downtown to University of Washington (UW). It includes 5.0 kilometers (3.15 miles) of twin-bored, 6.4 meters (21 feet) excavated diameter

    Jan 1, 2008

  • CIM
    History, Tectonic Setting, and Models for Instrusion-Related Gold Deposits in Southwestern New Brunswick, Canada: Examples from the Clarence Stream Area

    By K. G. Thorne, M. J. McLeod, D. Hoy

    "Throughout the Paleozoic, a variety of gold depositional environments were created in the New Brunswick segment of the northern Appalachians because of the complexity of arc and continental plate col

    Jan 1, 2008

  • SME
    Cultural Issues Are Important In The Implementation Of Mining Ventures

    By Len Harris

    Webster?s Dictionary describes culture as: ? The totality of socially transmitted behavior patterns, arts, beliefs, institutions and all other products of human work and thought typical of a popul

    Jan 1, 2008

  • SME
    Pogo Mine Control System: A Hybrid of DCS and PLC

    The Pogo Mine, near Delta Junction, Alaska is a new 2500 STPD gold operation. The control system of the mine and milling operations are a hybrid of DCS (Distributed Control System) control and PLC (Pr

    Jan 1, 2008

  • AUSIMM
    Bulk Sampling of Complex Gold Deposits - Material Characterisation and Program Design and Management

    By I M. Platten, Y Xie

    Complex gold deposits are generally characterised by variable geometries, strong structural controls on grade distribution and a high-nugget effect. The use of diamond drilling and fire assays in this

    Jan 1, 2008

  • SME-ICGCM
    Some Thoughts on Calibrating LaModel

    By Keith Heasley

    In many practical situation where the LaModel program in used to analyze the mechanical response and failure of the mining environment, there are very few actual field measurement from the site availa

    Jan 1, 2008

  • SAIMM
    What happened to the mechanics in rock mechanics and the geology in engineering geology - Synopsis

    By P. J. N. Pells

    A good thing is becoming a bad thing. Rock mass classification systems, that are so excellent for communications between engineers and geologists, and that can be valuable in categorizing project expe

    Jan 1, 2008

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008