Search Documents

Search Again

Search Again

Sort by

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008

  • SME
    The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

    By Faruk Oksuz

    The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a

    Jan 1, 2008

  • SME
    NAT Attendees Get A Glimpse Of The Future Of Underground Space Use

    In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi

    Jan 1, 2008

  • SME
    Massive Tires Keep The Industry Rolling

    One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,

    Jan 1, 2008

  • SME
    Geotechnical Baseline Reports for Construction - Second Edition

    By Randall J. Essex

    The Construction Institute of the American Society of Civil Engineers recently published the second edition of a 1997 publication on geotechnical baseline reports. The new publication, called Geotechn

    Jan 1, 2008

  • SME
    Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels

    By Christophe Bragard

    The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project

    Jan 1, 2008

  • SME
    Evaluation of a Virtual Reality Simulator Developed for Training New Miners to Install Rock Bolts Using a Jackleg Drill

    By D. Nutakor

    The ability of computers to create synthetic representations of the real world in virtual reality offers a number of opportunities to enhance training methods used in the mining industry. Unfortunatel

    Jan 1, 2008

  • SME-ICGCM
    Recent Developments in Pre-driven Recovery Road Design

    By Rob Thomas

    Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.

    Jan 1, 2008

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • NIOSH
    Diagnosing and Controlling Moisture - Sensitive Roof in Coal Mines

    By Gregory Molinda

    Historically, coal miners have known that roof shales can deteriorate in contact with humid mine air, causing massive roof falls and injuries from falling rock. It is critical to recognize rocks prone

    Jan 1, 2008

  • SME
    Small Mine Contractor Safety - Case Studies

    By F. Calizaya

    The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind

    Jan 1, 2008

  • SME
    Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?

    By Bruce Cavender

    Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa

    Jan 1, 2008

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Transbay Transit Center - Keeping DTX on Track

    By Derek J. Penrice

    A critical element of the Transbay Transit Center Program, the Caltrain Downtown Extension (DTX) will extend commuter rail service into downtown San Francisco and accommodate future statewide high-spe

    Jan 1, 2008

  • AUSIMM
    On the Use of Dry Pulp Duplicates in Quality Assurance/Quality Control - A New Tool of the Trade

    Same-batch and non-blind as well as blind pulp duplicates are often submitted as quality assurance/quality control (QA/QC) control samples to a routine laboratory along with routine assays (and other

    Jan 1, 2008

  • SME
    Piedras Verdes: Mexico?s Newest Copper Mine

    By P. J. Rua

    The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o

    Jan 1, 2008

  • SME
    An Assessment Of Engineering Noise Controls At A Talc Processing Plant

    By E. R. Spencer

    National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi

    Jan 1, 2008

  • IIMP
    Optimización de ore control con metodología Six Sigma

    By Lytman Jordán

    En la actualidad, el proceso de Ore Control de Tintaya se convierte en un reto porque la naturaleza del yacimiento Metasomático de Contacto Tipo Skarn presenta una mineralización compleja a manera de

    Sep 9, 2007

  • IIMP
    Tecnología de la información aplicada a las observaciones preventivas - Caso Antamina

    By Víctor Siña

    El presente trabajo describe una alternativa de sistematización de las observaciones preventivas generadas en las áreas operativas de la minera Antamina a través del programa de Prevención de Riesgos

    Sep 9, 2007

  • IIMP
    Monitoreo y control de sismicidad inducida en la U.M. El Porvenir

    By Aquiles Vivar

    Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución

    Sep 9, 2007