Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Disc Cutter Performance in Boulder-Laden Ground ? Introduction
By D. S. Kieffer
Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl
Jan 1, 2008
-
The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction
By Faruk Oksuz
The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time a
Jan 1, 2008
-
NAT Attendees Get A Glimpse Of The Future Of Underground Space Use
In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi
Jan 1, 2008
-
Massive Tires Keep The Industry Rolling
One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,
Jan 1, 2008
-
Geotechnical Baseline Reports for Construction - Second Edition
By Randall J. Essex
The Construction Institute of the American Society of Civil Engineers recently published the second edition of a 1997 publication on geotechnical baseline reports. The new publication, called Geotechn
Jan 1, 2008
-
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels
By Christophe Bragard
The Los Angeles Metro Eastside Extension light rail project included a 1.5 mile underground segment, which consisted of twin 18'?10" ID tunnels, bored with two EPB-TBMs. One of the major project
Jan 1, 2008
-
Evaluation of a Virtual Reality Simulator Developed for Training New Miners to Install Rock Bolts Using a Jackleg Drill
By D. Nutakor
The ability of computers to create synthetic representations of the real world in virtual reality offers a number of opportunities to enhance training methods used in the mining industry. Unfortunatel
Jan 1, 2008
-
Recent Developments in Pre-driven Recovery Road Design
By Rob Thomas
Pre-driven recovery roads are used to speed up the longwall recovery process by reducing bolt-up requirements and by improving ground conditions on the face during the removal of the powered supports.
Jan 1, 2008
-
Columbus Circle Station Complex - History and Rehabilitation
By Aram Grigoryan
This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th
Jan 1, 2008
-
Diagnosing and Controlling Moisture - Sensitive Roof in Coal Mines
By Gregory Molinda
Historically, coal miners have known that roof shales can deteriorate in contact with humid mine air, causing massive roof falls and injuries from falling rock. It is critical to recognize rocks prone
Jan 1, 2008
-
Small Mine Contractor Safety - Case Studies
By F. Calizaya
The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind
Jan 1, 2008
-
Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?
By Bruce Cavender
Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa
Jan 1, 2008
-
Final Tunnel Liner at Mill Creek 3 Project - Case Study
By M. Schafer
The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac
Jan 1, 2008
-
Transbay Transit Center - Keeping DTX on Track
By Derek J. Penrice
A critical element of the Transbay Transit Center Program, the Caltrain Downtown Extension (DTX) will extend commuter rail service into downtown San Francisco and accommodate future statewide high-spe
Jan 1, 2008
-
On the Use of Dry Pulp Duplicates in Quality Assurance/Quality Control - A New Tool of the Trade
Same-batch and non-blind as well as blind pulp duplicates are often submitted as quality assurance/quality control (QA/QC) control samples to a routine laboratory along with routine assays (and other
Jan 1, 2008
-
Piedras Verdes: Mexico?s Newest Copper Mine
By P. J. Rua
The Piedras Verdes copper mine is a new run-of-mine (ROM), heap leach, solvent-extraction/electrowinning (SX-EW) operation located 21 km (13 miles) north-northwest of the town of Alamos in the state o
Jan 1, 2008
-
An Assessment Of Engineering Noise Controls At A Talc Processing Plant
By E. R. Spencer
National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi
Jan 1, 2008
-
Optimización de ore control con metodología Six Sigma
By Lytman Jordán
En la actualidad, el proceso de Ore Control de Tintaya se convierte en un reto porque la naturaleza del yacimiento Metasomático de Contacto Tipo Skarn presenta una mineralización compleja a manera de
Sep 9, 2007
-
Tecnología de la información aplicada a las observaciones preventivas - Caso Antamina
By Víctor Siña
El presente trabajo describe una alternativa de sistematización de las observaciones preventivas generadas en las áreas operativas de la minera Antamina a través del programa de Prevención de Riesgos
Sep 9, 2007
-
Monitoreo y control de sismicidad inducida en la U.M. El Porvenir
By Aquiles Vivar
Ante los problemas de sismicidad inducidos por el sistema de minado en la Compañía minera Milpo, se planteó una solución a través del sistema de monitoreo sísmico único, donde se da una distribución
Sep 9, 2007