Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Urban Tunnelling Experiences on the UK’s Channel Tunnel Rail Link
By Keith Bowers, Frank Mimnagh, Eddie Woods
The CTRL London Tunnels The Channel Tunnel Rail Link (CTRL) London Tunnels comprise 36km of internal diameter bores that were driven by Earth Pressure Balance (EPB) Tunnel Boring Machines (TBMs).
Jan 1, 2005
-
Physical Limitations and Musculoskeletal Complaints Associated With Work in Unusual or Restricted Postures: A Literature Review - Introduction.
By Sean Gallagher
The vast majority of ergonomics research has addressed the demands of work in standing or sitting postures, and understandably so. However, many workers (for example, underground miners, aircraft bagg
Jan 1, 2005
-
Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project
By J. Chae, D. Pecha, R. Andrews
The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro
Jan 1, 2005
-
-
Second Avenue Subway—Tunneling Beneath Manhattan
By Geoffrey Fosbrook, Donald Phillips, Anil Parikh
The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im
Jan 1, 2005
-
Collapse and Remining of Tunnel TO8 at THSRC Contract C230
By William Stewart, John Tinkler, Gary B. Hemphill
Of the 345 km long Taiwan High Speed Rail Project, connecting the cities of Taipeiand Kaohsiung, the 23 km alignment on Contract C230 required the construction of5755 m of shallow mined tunnels rangin
Jan 1, 2005
-
Characterization Of Inorganic Material In Secunda Coal And The Effect Of Washing On Coal Properties
By J. C. van Dyk
The objectives of this study were firstly to characterize and quantify the inorganic material in the Secunda gasification feedstock. Secondly, the effect of washing on coal properties and sulphur cont
Jan 1, 2005
-
Queens Bored Tunnels, East Side Access, New York
By David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005
-
Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and Tunnel
By David Belknap, Clay Haynes, David Egger
Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w
Jan 1, 2005
-
Secondary Grouting at the Chattahoochee Tunnel
By Judy B. Jones, Bradley A. Crenshaw, Theodore DePooter
This paper reviews groundwater issues leading to a secondary grouting program at the Chattahoochee Tunnel that was implemented subsequent to the contact grouting program. The secondary grouting progra
Jan 1, 2005
-
Rehabilitation of the Cape Creek Highway Tunnel Under Traffic
By Roberto J. Guardia, Tim Shell, Robert A. Robinson, Steve Rodolf
Our aging infrastructure includes numerous tunnels that provide easy access through topographic and societal obstacles. These tunnels are renewable resources that require periodic maintenance and reha
Jan 1, 2005
-
Experimental Shaft Machine for Nuclear Waste Disposal
By Dennis Ofiara, Michael Lewis
An experimental 1.75 meter Shaft Boring Machine was designed and manufactured by The Robbins Company. The drill was used by contractor Drillcon Raise AB to drill test shafts at an SKB underground test
Jan 1, 2005
-
Synthesis Of Al2O3-SiCw Ceramic Matrix Composite By Carbothermal Reduction Of Kaolin
By Sutham Niyomwas
Keywords: Al2O3-SiCW, Ceramic Matrix Composite, Carbothermal Reduction, Kaolin The formations of Al2O3-SiCw composite have been obtained in situ by carbothermal reduction of a mixture of kaolin a
Jan 1, 2005
-
Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals
By David G. Almond
"Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi
Jan 1, 2005
-
The Thermodynamic Activity Of MnO In Stainless Steel-Type Slags (f7a799eb-a033-464f-ab27-08cbca43c6bf)
By K. Ding
The thermodynamic activity of MnO was measured in MnO-CaO-MgO-SiO2 slags that are typically encountered in the production of manganese-containing stainless steels. A gas equilibration-quenching techni
Jan 1, 2005
-
New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures
By George Watson, Gu Quanzhong, S. Gerard Sawyer
Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be
Jan 1, 2005
-
Fuel cell versus diesel loader operation: Cost-benefit analysis study (6b80a653-d0e2-439c-a343-5c05fb591d61)
By G. Righettini, G. Desrivières, P. Mousset-Jones, R. Lacroix, M. C. Bétournay, P. Laliberté, S. Hardcastle
"Under the requirement to define the economic advantages of using hydrogen fuel cell vehicles, a broad-scoped project was initiated to quantify the costs associated with operating fuel cell vehicles a
Jan 1, 2005
-
Banquet, Train Ride Highlight Hall of Fame Weekend
By Tim O’Neil
Dressed in black tie and Victorian attire, some 200 people came to Leadville, CO, for a September weekend featuring a National Mining Hall of Fame and Museum (NMHF&M) induction banquet and a scenic mo
Jan 1, 2005
-
The Northwest Side Relief Sewer Tunnel—Challenges Became Success Stories
By Faruk Oksuz, Clay Haynes, Miguel Sanchez, Patrick Finn, Roger J. Maurer
The Milwaukee Metropolitan Sewerage District’s (MMSD)’s challenges of basement flooding and wet weather sewer overflows are being creatively addressed with the Northwest Side Relief Sewer tunnel. The
Jan 1, 2005
-
The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months
By Refik Elibay, Lawrence A. Williamson, George D. Barnes
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and assoc
Jan 1, 2005